Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: C. RAMIREZ & SONS

Complaint inspection · Health discipline

On , OSHA opened a complaint health inspection of C. RAMIREZ & SONS in 121 PINE, HEREFORD, TX 79045 (NAICS 000000). OSHA activity number 110411808.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch C. Ramirez & Sons — free Get an email when a new federal OSHA severe-injury report for C. Ramirez & Sons is published. One employer, no account, unsubscribe in one click.
Establishment
C. RAMIREZ & SONS
Site address
121 PINE
City
HEREFORD
State
TX
ZIP
79045
Mailing
P. O. BOX 1657, HEREFORD, TX 79045
Inspection type
Complaint (B)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
2038
Employees
60
Ownership type
A
Industry flags
Manufacturing health.

36 citations on file for this inspection.

5(a)(1)

Serious Gravity 10 1 instance 30 exposed
Issued
Jul 10, 1990
Abate by
May 7, 1991
Penalty
Initial $1,000 · Current $500 Reduced
Section 5(a)(1) of the Occuapational Safety and Health Act of 1970: The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to:
The employer failed to render employment and a place of employment
free from recognized hazards causing and/or likely to cause serious
physical harm to employees working in the tortilla factory when
performing manual tortilla packaging activities. Employees were
exposed to musculoskeletal injuries from the repetitive motion
requirements of the job.
Feasible and useful methods to correct the hazard include, but are not
limited to, ergometric redesign of the tortilla packaging operation,
instruction and supervision of employees in the recognition, and
avoidance of hazards associated with repetitive motions and
administrative controls to limit employee exposure.
STEP 1-
a) Conduct a feasibility study to determine the administrative/
engineering controls that would reduce the risk of cumulative
trauma disorders (CTD).
b) Set up a medical surveillance program to prevent CTD cases from
becoming severe. This involves the following steps:
i) Identify the specific departments which have documented a high
rate of CTD's.
ii) Systemically analyze each job (time and motion studies may be used).
Look for factors known to be associated with CTD development. These
include posture of the hand and wrist, strength, stress concentations
and vibrations.
STEP 2-
Submit to the Area Director a written detailed plan of abatement
outlining a schedule for the implementation of engineering and/or
administrative measures to control employee exposure to musculoskeletal
injuries when packaging tortillas. This plan shall include, at a minimum
target dates for the above actions which should be consistent with the
dates required by this citation.
STEP 3-
Abatement shall have been completed by the implementation of feasible
engineering and/or administrative controls upon verification of their
effectiveness in achieving compliance.
Recent events (2)
  • — F (S) $500.00
  • — Z (S) $1000.00

1910.22 A01

Serious Gravity 05 1 instance 3 exposed
Issued
Jun 11, 1990
Abate by
Jul 24, 1990
Penalty
Initial $400 · Current $200 Reduced
Recent events (2)
  • — F (S) $200.00
  • — Z (S) $400.00

1910.38 A01

Serious Gravity 06 1 instance 60 exposed
Issued
Jun 11, 1990
Abate by
Jul 24, 1990
Penalty
Initial $480 · Current $240 Reduced
Recent events (2)
  • — F (S) $240.00
  • — Z (S) $480.00

1910.38 B01

Serious Gravity 06 1 instance 60 exposed
Issued
Jun 11, 1990
Abate by
Jul 24, 1990

1910.147 C01

Serious Gravity 08 1 instance 1 exposed
Issued
Jun 11, 1990
Abate by
Jul 24, 1990
Penalty
Initial $640 · Current $320 Reduced
Recent events (4)
  • — I $960.00
  • — Z $960.00
  • — F (S) $320.00

1910.157 C04

Serious Gravity 05 5 instances 60 exposed
Issued
Jun 11, 1990
Abate by
May 7, 1991
Penalty
Initial $400 · Current $200 Reduced
Recent events (2)
  • — F (S) $200.00
  • — Z (S) $400.00

1910.157 G01

Serious Gravity 06 1 instance 60 exposed
Issued
Jun 11, 1990
Abate by
Aug 1, 1990
Penalty
Initial $480 · Current $240 Reduced
Recent events (2)
  • — F (S) $240.00
  • — Z (S) $480.00

1910.157 G03

Serious Gravity 06 1 instance 60 exposed
Issued
Jun 11, 1990
Abate by
Jul 24, 1990

1910.169 A02 I

Serious Gravity 04 1 instance 1 exposed
Issued
Jun 11, 1990
Abate by
May 7, 1991
Penalty
Initial $320 · Current $160 Reduced
Recent events (2)
  • — F (S) $160.00
  • — Z (S) $320.00

1910.212 A01

Serious Gravity 06 2 instances 3 exposed
Issued
Jun 11, 1990
Abate by
May 7, 1991
Penalty
Initial $480 · Current $240 Reduced
Recent events (2)
  • — F (S) $240.00
  • — Z (S) $480.00

1910.212 A05

Serious Gravity 04 1 instance 3 exposed
Issued
Jun 11, 1990
Abate by
May 7, 1991
Penalty
Initial $320 · Current $160 Reduced
Recent events (2)
  • — F (S) $160.00
  • — Z (S) $320.00

1910.213 C02

Serious Gravity 06 1 instance 1 exposed
Issued
Jun 11, 1990
Abate by
May 7, 1991
Penalty
Initial $480 · Current $240 Reduced
Recent events (2)
  • — F (S) $240.00
  • — Z (S) $480.00

1910.213 A03

Serious Gravity 06 1 instance 1 exposed
Issued
Jun 11, 1990
Abate by
May 7, 1991
Penalty
Initial $480 · Current $240 Reduced
Recent events (2)
  • — F (S) $240.00
  • — Z (S) $480.00

1910.213 D01

Serious Gravity 06 1 instance 1 exposed
Issued
Jun 11, 1990
Abate by
Jul 24, 1990
Penalty
Initial $480 · Current $240 Reduced
Recent events (2)
  • — F (S) $240.00
  • — Z (S) $480.00

1910.219 C04 I

Serious Gravity 03 1 instance 1 exposed
Issued
Jun 11, 1990
Abate by
May 7, 1991
Penalty
Initial $240 · Current $120 Reduced
Recent events (2)
  • — F (S) $120.00
  • — Z (S) $240.00

1910.219 D01

Serious Gravity 04 1 instance 1 exposed
Issued
Jun 11, 1990
Abate by
May 7, 1991
Penalty
Initial $320 · Current $160 Reduced
Recent events (2)
  • — F (S) $160.00
  • — Z (S) $320.00

1910.219 E03 I

Serious Gravity 06 4 instances 5 exposed
Issued
Jun 11, 1990
Abate by
May 7, 1991
Penalty
Initial $480 · Current $240 Reduced
Recent events (2)
  • — F (S) $240.00
  • — Z (S) $480.00

1910.219 F03

Deleted Serious Gravity 06 5 instances 4 exposed
Issued
Jun 11, 1990
Abate by
Jul 24, 1990
Penalty
Initial $480 · Current $480
Recent events (2)
  • — F (S) $480.00
  • — Z (S) $480.00

1910.219 H01

Serious Gravity 04 1 instance 1 exposed
Issued
Jun 11, 1990
Abate by
May 7, 1991
Penalty
Initial $320 · Current $160 Reduced
Recent events (2)
  • — F (S) $160.00
  • — Z (S) $320.00

1910.252 A02 IID

Serious Gravity 06 1 instance 3 exposed
Issued
Jun 11, 1990
Abate by
May 7, 1991
Penalty
Initial $480 · Current $240 Reduced
Recent events (2)
  • — F (S) $240.00
  • — Z (S) $480.00

1910.252 A02 IVA

Serious Gravity 06 2 instances 3 exposed
Issued
Jun 11, 1990
Abate by
May 7, 1991
Penalty
Initial $480 · Current $240 Reduced
Recent events (2)
  • — F (S) $240.00
  • — Z (S) $480.00

1910.252 A02 IVC

Serious Gravity 06 1 instance 3 exposed
Issued
Jun 11, 1990
Abate by
May 7, 1991
Penalty
Initial $480 · Current $240 Reduced
Recent events (2)
  • — F (S) $240.00
  • — Z (S) $480.00

1910.303 F

Serious Gravity 05 1 instance 3 exposed
Issued
Jun 11, 1990
Abate by
May 7, 1991
Penalty
Initial $400 · Current $200 Reduced
Recent events (2)
  • — F (S) $200.00
  • — Z (S) $400.00

1910.304 F01 IV

Deleted Serious Gravity 05 5 instances 5 exposed
Issued
Jun 11, 1990
Abate by
Jul 24, 1990
Penalty
Initial $400 · Current $400
Recent events (2)
  • — F (S) $400.00
  • — Z (S) $400.00

1910.304 F04

Serious Gravity 05 3 instances 1 exposed
Issued
Jun 11, 1990
Abate by
May 7, 1991
Penalty
Initial $400 · Current $200 Reduced
Recent events (2)
  • — F (S) $200.00
  • — Z (S) $400.00

1910.305 B01

Serious Gravity 06 3 instances 10 exposed
Issued
Jun 11, 1990
Abate by
May 7, 1991
Penalty
Initial $480 · Current $240 Reduced
Recent events (2)
  • — F (S) $240.00
  • — Z (S) $480.00

1910.305 B02

Serious Gravity 04 2 instances 3 exposed
Issued
Jun 11, 1990
Abate by
May 7, 1991
Penalty
Initial $320 · Current $160 Reduced
Recent events (2)
  • — F (S) $160.00
  • — Z (S) $320.00

1910.305 G02 II

Serious Gravity 04 2 instances 1 exposed
Issued
Jun 11, 1990
Abate by
May 7, 1991
Penalty
Initial $320 · Current $160 Reduced
Recent events (2)
  • — F (S) $160.00
  • — Z (S) $320.00

1910.305 G02 III

Serious Gravity 04 1 instance 1 exposed
Issued
Jun 11, 1990
Abate by
May 7, 1991
Penalty
Initial $320 · Current $160 Reduced
Recent events (2)
  • — F (S) $160.00
  • — Z (S) $320.00

1910.307 B

Serious Gravity 03 1 instance 1 exposed
Issued
Jun 11, 1990
Abate by
Jul 24, 1990
Penalty
Initial $240 · Current $120 Reduced
Recent events (2)
  • — F (S) $120.00
  • — Z (S) $240.00

1910.1200 E01

Serious Gravity 05 1 instance 10 exposed
Issued
Jun 11, 1990
Abate by
Aug 1, 1990
Penalty
Initial $400 · Current $200 Reduced
Recent events (4)
  • — I $600.00
  • — Z $600.00
  • — F (S) $200.00

1910.1200 G01

Serious Gravity 05 1 instance 10 exposed
Issued
Jun 11, 1990
Abate by
Aug 1, 1990

1910.1200 H

Serious Gravity 05 1 instance 10 exposed
Issued
Jun 11, 1990
Abate by
Aug 1, 1990

1904.2 A

Other-than-serious 2 instances 60 exposed
Issued
Jun 11, 1990
Abate by
May 7, 1991
Penalty
Initial $100 · Current $50 Reduced
Recent events (2)
  • — F (O) $50.00
  • — Z (O) $100.00

1904.5 C

Other-than-serious 1 instance
Issued
Jun 11, 1990
Abate by
May 7, 1991
Penalty
Initial $100 · Current $50 Reduced
Recent events (2)
  • — F (O) $50.00
  • — Z (O) $100.00

1904.6

Other-than-serious 1 instance 60 exposed
Issued
Jun 11, 1990
Abate by
May 7, 1991
Penalty
Initial $100 · Current $50 Reduced
Recent events (2)
  • — F (O) $50.00
  • — Z (O) $100.00

View C. Ramirez & Sons's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 110411808.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.