BATH, ME —
OSHA Inspection: BATH IRON WORKS
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of BATH IRON WORKS in 700 WASHINGTON STREET, BATH, ME 04530 (NAICS 336611). OSHA activity number 112520143.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- BATH IRON WORKS
- Site address
- 700 WASHINGTON STREET
- City
- BATH
- State
- ME
- ZIP
- 04530
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Health
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 336611
- SIC code (legacy)
- 3731
- Employees
- 5000
- Ownership type
- A
Citations
81 citations on file for this inspection.
5(a)(1)
- Issued
- Feb 21, 2008
- Abate by
- Jun 23, 2008
- Penalty
- Initial $3,500 · Current $3,500
General-duty citation text
1)Tools designed to reduce the risk of MSDs. 2)Tool balancers mounted on suspension lines and held by clamps and/or strong magnets to support the weight of tools when working on long vertical surfaces. 3)Articulated arms and levers mounted on guard rails of man lifts which can be used to support the weight of tools. 4)Padded areas on the top rails of man lifts where employees can rest and brace their arms during the job task. 5)Greater use of the flexible welding/grinding system developed by in-house workers and engineers. 6)Tool storage holsters on man lifts to provide a place to set tools close to the work area when alternating between grinding and gouging tasks or when resting. 7)Where appropriate wrap tools with tape or other coating to increase the grip or tackiness of the tool handle. This will reduce the cold conduction from the tool to the hands and may improve the coefficient of friction between the hand and tool to reduce tool slippage. b)Some examples of administrative controls include: 1)Develop an evaluation protocol for new tools which should consider the tool's weight, vibration, center of gravity (tool balance when used), torque, durability, costs, maintenance, life- cycle, ability to conduct cold to the hand, handle size, shape, alignment, and composition (manufacturers are likely to have much of this information). a.All tools should be evaluated by the same criteria. b.Periodic tool evaluations should be conducted to identify patterns in tool usage to screen out tools that do not meet the performance and ergonomic features. 2)Develop and implement a tool management and maintenance program which: a.Tracks tool usage (i.e., sign out, sign in, tool maintenance cycle time, etc.) to determine when tools need to be turned in for maintenance. b.Develop a preventive maintenance cycle that tracks time usage of tools (for example, a tool timer) and assures that tool vibration is maintained per the manufacturers' recommendations. c.Evaluate and implement vibration isolating or reducing techniques. Mass, vibration counter balancing, damping and preventive maintenance of worn out tool mechanical features (i.e., veins, bearings) should be considered. c)Some examples of work practice controls include: 1)Minimize the amount of time and weight that tools must be manually supported, especially when held out and away from the body. 2)Evaluate the current method of sequencing work within the process. When possible, obstructions should not be placed in rooms, compartments, or chambers until the end of the process. 3)Work-rotation schedules, based on task evaluation, to minimize the amount of time spent performing hazardous tasks such as, but not limited to: a.Using pneumatic power tools; b.Supporting tool weight, especially over head or out and away from the body; c.Controlling powered tools especially overhead or out and away from the body; d.Awkward body postures, such as reaching under, around, or behind items such as pipes, vents, or other obstructions. 4)Implement a conditioning and rotation schedule for new employees, injured employees returning to the job, and/or employees returning from leave or other absences. d)Some examples of personal protective equipment include: 1)Appropriately sized gloves that provide warmth, performance and function, including an appropriate coefficient of friction to improve hand grip of tools. 2)Gloves with anti-vibration characteristics to help reduce vibration- related musculoskeletal and neurological disorders. Work Site Analysis Work site analysis including the development and use of ergonomic evaluation tools and employee questionnaires. 1)Work site analysis conducted by persons with the appropriate education, training and experience to identify and evaluate ergonomic stressors, personal protective equipment, and engineering, administrative and work practice controls needed for abatement. 2)Work site analysis including a job analysis of all tasks and workplace procedures to identify all ergonomic stressors and the body part(s) affected. Training And Education 1)General ergonomic training addressing the risk factors that can lead to musculoskeletal disorders (MSDs), the signs and symptoms of MSDs, and how to prevent the occurrence of MSDs including the use of personal protective equipment, engineering, administrative, and work practice controls. 2)Task specific training addressing the hazards associated with the tasks each employee performs. 3)Development of metrics for evaluating the effectiveness of training in understanding and preventing MSDs. These metrics include the understanding of causes and prevention methods for MSDs.4)Retraining performed at least annually and as operations change. 5)Additional training for managers and employee representatives who have the day to day responsibility for monitoring and enforcing the company's ergonomics activities. The additional training should be sufficient to assure competency in the oversight and control of the work within their areas of responsibility. 6)Training conducted by persons with appropriate education, training and experience.
Recent events (2)
- — F (S) $3500.00
- — Z (S) $3500.00
5(a)(1)
- Issued
- Nov 30, 2007
- Abate by
- Dec 23, 2007
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
are: 1)Assure that the required flame detection apparatus functions properly. 2)Assure that there is adequate grounding between the suspension hooks and the cabinets hung from them and between the cabinets and the parts being coated. 3)Add an automatic sprinkler or other automatic extinguishing equipment.ing
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.22 B02
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- — F (S) $2500.00
- — Z (S) $2500.00
1910.23 A03 I
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
- Penalty
- Initial $2,500 · Current $1,600 Reduced
Recent events (2)
- — F (S) $1600.00
- — Z (S) $2500.00
1910.23 A08 II
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
- Penalty
- Initial $2,500 · Current $1,600 Reduced
Recent events (2)
- — F (S) $1600.00
- — Z (S) $2500.00
1910.23 D01
- Issued
- Nov 30, 2007
- Abate by
- Dec 6, 2007
- Penalty
- Initial $2,000 · Current $1,400 Reduced
Recent events (2)
- — F (S) $1400.00
- — Z (S) $2000.00
1910.23 E01
- Issued
- Nov 30, 2007
- Abate by
- Dec 13, 2007
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- — F (S) $2500.00
- — Z (S) $2500.00
1910.27 C06
- Issued
- Nov 30, 2007
- Abate by
- Dec 18, 2007
- Penalty
- Initial $5,000 · Current $5,000
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.27 D02 III
- Issued
- Nov 30, 2007
- Abate by
- Dec 13, 2007
- Penalty
- Initial $2,500 · Current $1,600 Reduced
Recent events (2)
- — F (S) $1600.00
- — Z (S) $2500.00
1910.36 G02
- Issued
- Nov 30, 2007
- Abate by
- Dec 13, 2007
- Penalty
- Initial $5,000 · Current $5,000
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.37 A03
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
- Penalty
- Current $3,500
Recent events (2)
- — F (S) $3500.00
- — Z (S)
1910.106 D04 I
- Issued
- Nov 30, 2007
- Abate by
- Dec 8, 2007
- Penalty
- Initial $2,500 · Current $1,600 Reduced
Recent events (2)
- — F (S) $1600.00
- — Z (S) $2500.00
1910.106 E02 IIB2
- Issued
- Nov 30, 2007
- Abate by
- Dec 13, 2007
- Penalty
- Initial $2,500 · Current $1,600 Reduced
Recent events (2)
- — F (S) $1600.00
- — Z (S) $2500.00
1910.107 E02
- Issued
- Nov 30, 2007
- Abate by
- Dec 13, 2007
Recent events (2)
- — F (S)
- — Z (S)
1910.107 B05 IV
- Issued
- Nov 30, 2007
- Abate by
- Dec 23, 2007
- Penalty
- Initial $2,500 · Current $1,600 Reduced
Recent events (2)
- — F (S) $1600.00
- — Z (S) $2500.00
1910.107 H12
- Issued
- Nov 30, 2007
- Abate by
- Dec 23, 2007
Recent events (2)
- — F (S)
- — Z (S)
1910.107 H06
- Issued
- Nov 30, 2007
- Abate by
- Dec 23, 2007
Recent events (2)
- — F (S)
- — Z (S)
1910.107 I07
- Issued
- Nov 30, 2007
- Abate by
- Dec 8, 2007
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- — F (S) $2500.00
- — Z (S) $2500.00
1910.107 I06
- Issued
- Nov 30, 2007
- Abate by
- Dec 13, 2007
- Penalty
- Current $1,600
Recent events (2)
- — F (S) $1600.00
- — Z (S)
1910.176 B
- Issued
- Nov 30, 2007
- Abate by
- Dec 8, 2007
- Penalty
- Initial $2,000 · Current $1,400 Reduced
Recent events (2)
- — F (S) $1400.00
- — Z (S) $2000.00
1910.178 O02
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
- Penalty
- Initial $2,000 · Current $2,000
Recent events (2)
- — F (S) $2000.00
- — Z (S) $2000.00
1910.179 B04
- Issued
- Nov 30, 2007
- Abate by
- Dec 8, 2007
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- — F (S) $2500.00
- — Z (S) $2500.00
1910.179 D04 III
- Issued
- Nov 30, 2007
- Abate by
- Dec 18, 2007
- Penalty
- Initial $2,500
Recent events (2)
- — F (O)
- — Z (S) $2500.00
1910.179 F04 VI
- Issued
- Nov 30, 2007
- Abate by
- Dec 8, 2007
- Penalty
- Initial $5,000 · Current $5,000
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.179 N03 IV
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
- Penalty
- Initial $3,500 · Current $2,300 Reduced
Recent events (2)
- — F (S) $2300.00
- — Z (S) $3500.00
1910.180 C01 IV
- Issued
- Nov 30, 2007
- Abate by
- Dec 8, 2007
- Penalty
- Initial $2,500 · Current $1,600 Reduced
Recent events (2)
- — F (S) $1600.00
- — Z (S) $2500.00
1910.180 C02
- Issued
- Nov 30, 2007
- Abate by
- Dec 8, 2007
- Penalty
- Initial $2,000 · Current $1,400 Reduced
Recent events (2)
- — F (S) $1400.00
- — Z (S) $2000.00
1910.180 D03 III
- Issued
- Nov 30, 2007
- Abate by
- Dec 8, 2007
- Penalty
- Initial $2,500 · Current $1,600 Reduced
Recent events (2)
- — F (S) $1600.00
- — Z (S) $2500.00
1910.180 D03 IV
- Issued
- Nov 30, 2007
- Abate by
- Dec 8, 2007
Recent events (2)
- — F (S)
- — Z (S)
1910.180 D06
- Issued
- Nov 30, 2007
- Abate by
- Dec 8, 2007
- Penalty
- Initial $1,500 · Current $1,500
Recent events (2)
- — F (S) $1500.00
- — Z (S) $1500.00
1910.180 H03 IIA
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
- Penalty
- Initial $1,500 · Current $1,500
Recent events (2)
- — F (S) $1500.00
- — Z (S) $1500.00
1910.212 A01
- Issued
- Nov 30, 2007
- Abate by
- Dec 18, 2007
- Penalty
- Initial $5,000 · Current $3,500 Reduced
Recent events (2)
- — F (S) $3500.00
- — Z (S) $5000.00
1910.212 A03 II
- Issued
- Nov 30, 2007
- Abate by
- Dec 23, 2007
- Penalty
- Initial $5,000 · Current $3,500 Reduced
Recent events (2)
- — F (S) $3500.00
- — Z (S) $5000.00
1910.212 A04
- Issued
- Nov 30, 2007
- Abate by
- Dec 8, 2007
- Penalty
- Initial $2,500 · Current $1,600 Reduced
Recent events (2)
- — F (S) $1600.00
- — Z (S) $2500.00
1910.212 A05
- Issued
- Nov 30, 2007
- Abate by
- Dec 6, 2007
- Penalty
- Initial $2,000 · Current $1,400 Reduced
Recent events (2)
- — F (S) $1400.00
- — Z (S) $2000.00
1910.213 B03
- Issued
- Nov 30, 2007
- Abate by
- Dec 13, 2007
- Penalty
- Initial $2,500 · Current $1,600 Reduced
Recent events (2)
- — F (S) $1600.00
- — Z (S) $2500.00
1910.213 C02
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
- Penalty
- Initial $5,000 · Current $5,000
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.213 C03
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
Recent events (2)
- — F (S)
- — Z (S)
1910.213 S02
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
- Penalty
- Initial $5,000 · Current $3,500 Reduced
Recent events (2)
- — F (S) $3500.00
- — Z (S) $5000.00
1910.243 C01
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
- Penalty
- Initial $3,500 · Current $3,500
Recent events (2)
- — F (S) $3500.00
- — Z (S) $3500.00
1910.252 B01 II
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
- Penalty
- Initial $2,500 · Current $1,600 Reduced
Recent events (2)
- — F (S) $1600.00
- — Z (S) $2500.00
1910.303 B02
- Issued
- Nov 30, 2007
- Abate by
- Dec 8, 2007
- Penalty
- Initial $2,500 · Current $1,600 Reduced
Recent events (2)
- — F (S) $1600.00
- — Z (S) $2500.00
1910.303 G02 I
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
- Penalty
- Initial $5,000 · Current $3,500 Reduced
Recent events (2)
- — F (S) $3500.00
- — Z (S) $5000.00
1910.305 G01 IIIB
- Issued
- Nov 30, 2007
- Abate by
- Dec 13, 2007
- Penalty
- Initial $3,500 · Current $2,300 Reduced
Recent events (2)
- — F (S) $2300.00
- — Z (S) $3500.00
1910.305 G01 IIIC
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
Recent events (2)
- — F (S)
- — Z (S)
1910.305 J01 IV
- Issued
- Nov 30, 2007
- Abate by
- Dec 6, 2007
- Penalty
- Initial $2,500 · Current $1,600 Reduced
Recent events (2)
- — F (S) $1600.00
- — Z (S) $2500.00
1915.71 J01
- Issued
- Nov 30, 2007
- Abate by
- Dec 8, 2007
- Penalty
- Initial $2,500 · Current $1,600 Reduced
Recent events (2)
- — F (S) $1600.00
- — Z (S) $2500.00
1915.73 B
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
- Penalty
- Initial $2,000
Recent events (2)
- — F (O)
- — Z (S) $2000.00
1915.73 G
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
- Penalty
- Initial $3,500 · Current $3,500
Recent events (2)
- — F (S) $3500.00
- — Z (S) $3500.00
1915.92 A
- Issued
- Nov 30, 2007
- Abate by
- Jan 2, 2008
- Penalty
- Initial $2,500 · Current $1,600 Reduced
Recent events (2)
- — F (S) $1600.00
- — Z (S) $2500.00
1915.111 A
- Issued
- Nov 30, 2007
- Abate by
- Dec 18, 2007
- Penalty
- Initial $2,500
Recent events (2)
- — F (O)
- — Z (S) $2500.00
1915.116 D
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
- Penalty
- Initial $2,500
Recent events (2)
- — F (O)
- — Z (S) $2500.00
1915.152 B
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
- Penalty
- Initial $2,500 · Current $1,600 Reduced
Recent events (2)
- — F (S) $1600.00
- — Z (S) $2500.00
1915.159 A09
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
- Penalty
- Initial $2,500
Recent events (2)
- — F (O)
- — Z (S) $2500.00
1915.159 A09 I
- Issued
- Nov 30, 2007
- Abate by
- Dec 13, 2007
- Penalty
- Current $1,600
Recent events (2)
- — F (S) $1600.00
- — Z (S)
1910.212 A05
- Issued
- Nov 30, 2007
- Abate by
- Jan 2, 2008
- Penalty
- Initial $55,000 · Current $50,000 Reduced
Recent events (2)
- — F (U) $50000.00
- — Z (W) $55000.00
5(a)(1)
- Issued
- Nov 30, 2007
- Abate by
- Dec 8, 2007
- Penalty
- Initial $25,000 · Current $7,000 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to impalement hazards from unguarded studs, threaded rods and angle iron: a)Hull 502, Engineering Log Office - Angle iron and three 2 inch pieces of straight iron were protruding 4 inches and 3 inches. b)Hull 502, Array 4 - Four 1/2 inch studs were protruding 4 inches above the walking surface. c)Assembly Building, 504-214, Lower Floor Level - Horizontal studs were not covered. d)Assembly Building, 504-145 - Vertical and horizontal studs were not covered. e)Pre-Outfit 2 Building, Hull 503, Unit 143, Lower Level, IC Gyro #1 - Two 1/2 inch threaded studs protruding 3 7/8 inches above the walking surface; six 1 1/2 inch angle iron protruding 5 inches above the walking surface and two 2 inch flat angle iron protruding 5 inches above the walking surface. f)Pre-Outfit 2 Building, Hull 503, Unit 145, Main Deck Level, Repair 2 (1-94-1-A) - Two 1/2 inch threaded studs protruding 4 inches above the walking surface. These two studs had rubber covers on them but the studs had worn through the rubber and the studs protruded about 3/4 inch through the caps. g)Pre-Outfit 2 Building, Hull 503, Unit 145, Main Deck Level, Ships Store (1-96-2- Q) - One 1/2 inch threaded stud protruded 4 inches above the walking surface. h)Pre-Outfit 2 Building, Hull 503 (MegaUnit 2), Unit 333, Mid-Level, Store Room (SD #2) - Three 2 inch by 2 inch angle iron protruding 6 1/2 inches above the walking surface and two 2 inch flat iron protruding 4 3/4 inches above the walking surface. i)Pre-Outfit 2 Building, Hull 503 (MegaUnit 2), Unit 333, Top Level, Frame 370, Port side - Two 1/2 inch threaded studs protruding 1/2 inch above the walking surface. Among other methods, one feasible and acceptable method of abatement would be to install styrofoam blocks over the protrusions, which will reduce the likelihood of puncture wounds to the head, body, and limbs. Your company was previously cited for a violation of this Occupational Safety and Health Standard which was contained in OSHA Inspection Number 308179266, Citation Number 1, Item Number 1, issued on 09/21/05.
Recent events (2)
- — F (R) $7000.00
- — Z (R) $25000.00
1910.23 C01
- Issued
- Nov 30, 2007
- Abate by
- Dec 13, 2007
- Penalty
- Initial $12,500 · Current $9,000 Reduced
Recent events (2)
- — F (R) $9000.00
- — Z (R) $12500.00
1910.24 F
- Issued
- Nov 30, 2007
- Abate by
- Dec 13, 2007
- Penalty
- Initial $12,500 · Current $8,000 Reduced
Recent events (2)
- — F (R) $8000.00
- — Z (R) $12500.00
1910.178 Q01
- Issued
- Nov 30, 2007
- Abate by
- Dec 8, 2007
- Penalty
- Initial $12,500 · Current $9,000 Reduced
Recent events (2)
- — F (R) $9000.00
- — Z (R) $12500.00
1910.215 B09
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
- Penalty
- Initial $10,000 · Current $7,000 Reduced
Recent events (2)
- — F (R) $7000.00
- — Z (R) $10000.00
1915.134 B
- Issued
- Nov 30, 2007
- Abate by
- Dec 8, 2007
Recent events (2)
- — F (R)
- — Z (R)
1910.304 E01 IV
- Issued
- Nov 30, 2007
- Abate by
- Dec 13, 2007
- Penalty
- Initial $50,000 · Current $35,000 Reduced
Recent events (2)
- — F (R) $35000.00
- — Z (R) $50000.00
1910.304 G05
- Issued
- Nov 30, 2007
- Abate by
- Dec 8, 2007
- Penalty
- Initial $500 · Current $500
Recent events (2)
- — F (R) $500.00
- — Z (R) $500.00
1910.305 E01
- Issued
- Nov 30, 2007
- Abate by
- Dec 13, 2007
- Penalty
- Initial $25,000 · Current $17,500 Reduced
Recent events (2)
- — F (R) $17500.00
- — Z (R) $25000.00
1910.305 G01 IVA
- Issued
- Nov 30, 2007
- Abate by
- Dec 13, 2007
- Penalty
- Initial $15,000 · Current $10,500 Reduced
Recent events (2)
- — F (R) $10500.00
- — Z (R) $15000.00
1910.305 G02 III
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
- Penalty
- Initial $25,000 · Current $17,500 Reduced
Recent events (2)
- — F (R) $17500.00
- — Z (R) $25000.00
1915.71 J05
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
- Penalty
- Initial $12,500 · Current $9,000 Reduced
Recent events (2)
- — F (R) $9000.00
- — Z (R) $12500.00
1915.91 A
- Issued
- Nov 30, 2007
- Abate by
- Dec 8, 2007
- Penalty
- Initial $50,000 · Current $35,000 Reduced
Recent events (2)
- — F (R) $35000.00
- — Z (R) $50000.00
1910.23 E03 VA
- Issued
- Nov 30, 2007
- Abate by
- Dec 8, 2007
Recent events (2)
- — F (O)
- — Z (O)
1910.107 B05 I
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
Recent events (2)
- — F (O)
- — Z (O)
1910.178 A06
- Issued
- Nov 30, 2007
- Abate by
- Dec 13, 2007
Recent events (2)
- — F (O)
- — Z (O)
1910.212 B
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
Recent events (2)
- — F (O)
- — Z (O)
1910.219 F03
- Issued
- Nov 30, 2007
- Abate by
- Dec 8, 2007
Recent events (2)
- — F (O)
- — Z (O)
1910.244 A01 II
- Issued
- Nov 30, 2007
- Abate by
- Dec 8, 2007
Recent events (2)
- — F (O)
- — Z (O)
1910.1025 H01
- Issued
- Nov 30, 2007
- Abate by
- Dec 17, 2007
Recent events (2)
- — F (O)
- — Z (O)
1910.1200 F05
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
Recent events (2)
- — F (O)
- — Z (O)
1915.55 A01
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
Recent events (2)
- — F (O)
- — Z (O)
1915.72 A01
- Issued
- Nov 30, 2007
- Abate by
- Dec 6, 2007
Recent events (2)
- — F (O)
- — Z (O)
1915.91 D
- Issued
- Nov 30, 2007
- Abate by
- Dec 5, 2007
Recent events (2)
- — F (O)
- — Z (O)
1915.56 E
- Issued
- Oct 30, 2007
- Abate by
- Nov 4, 2007
- Penalty
- Initial $2,000 · Current $2,000
Recent events (2)
- — F (S) $2000.00
- — Z (S) $2000.00
More inspections at Bath Iron Works
View Bath Iron Works's full OSHA safety record →
More inspections in this industry (NAICS 336611)
More inspections in ME
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 112520143.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.