Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: PAMBY MOTORS

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of PAMBY MOTORS in 36 DANBURY ROAD, RIDGEFIELD, CT 06877 (NAICS 000000). OSHA activity number 113214001.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Pamby Motors — free Get an email when a new federal OSHA severe-injury report for Pamby Motors is published. One employer, no account, unsubscribe in one click.
Establishment
PAMBY MOTORS
Site address
36 DANBURY ROAD
City
RIDGEFIELD
State
CT
ZIP
06877
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
5511
Employees
30
Ownership type
A

18 citations on file for this inspection.

5(a)(1)

Serious Gravity 10 13 instances 15 exposed
Issued
Apr 22, 1994
Abate by
May 20, 1994
Penalty
Initial $2,500 · Current $1,392 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing or likely to cause death or serious physical harm to
employees in that employees
were exposed to being struck and/or being crushed by automobiles being
serviced:
Hazards-Operation/Condition-Accident-Hydraulic/electrical
automotive lifts used for raising cars on a daily
basis were not inspected weekly.
No safety latches on some of the lifters
Safety latches not working properly
on the lifts that did have them installed/equipped.
NOTE:  pit residue in the bottom of the hydraulic
lifts made the latches fail when the ram was
deployed in the up position.
Electrical lifts had broken cables they had to be
deployed with pliers.
Air valves were defective.
Safety pins was defective due to excessive wear.
North Side:
a. Electrical Challenger Lift #1 No Safety latch cable was broken.
b. Hydraulic lift-#2  No safety devices.
c. Electrical Challenger Lift # 3 Safety latch cable was broken.
d. Electrical Challenger Lift # 4 Safety latch cable was broken
e. Hydraulic Lift # 5  No safety devices.
f.Hydraulic Lift# 6  Safety latches not working properly covered with
residue.
g. Hydraulic Lift # 7 Safety latches not working properly covered with
residue.
South Side:
a. Electrical Lift # 7-  Safety Latch cable was broken.
b. Electrical lift # 6- Safety Latch cable was broken.
c. Hydraulic Lift # 4- Safety Latches not working properly covered with
residue.  Also the air valve was not working properly the spring was
missing on the handle.
d. Hydraulic Lift # 3-  Safety latches not working properly covered with
residue.
e. Electrical lift # 2- Safety pin not working properly excess wear.
f. Electrical Challenger lift # 1 - Safety Latch cable was broken.
AMONG OTHER METHODS, ONE FEASIBLE AND ACCEPTABLE ABATEMENT
METHODS TO CORRECT THIS HAZARD ARE:
1. OBTAIN THE  AUTOMOBILE LIFTS OPERATORS MANUAL, AND POST WITHIN
THE SHOP AREA.
2. DEVELOP AND IMPLEMENT A MAINTENANCE SCHEDULE TO INSURE THAT
PROPER OPERATING PARAMETERS ARE MET.  THESE INCLUDE, BUT ARE NOT
LIMITED TO: A. MANUFACTURES RECOMMENDATIONS ( SEE OPERATORS
MANUAL).
3. PROVIDE EMPLOYEE TRAINING, ON HAZARD RECOGNITION AND SAFE
OPERATION PROCEDURES AS WELL AS ENFORCEMENT OF THE PROCEDURES.
4.DEVELOP AND IMPLEMENT A PROGRAM TO REMOVE DEFECTIVE LIFTS FROM
USE.
Recent events (2)
  • — I (S) $1392.00
  • — Z (S) $2500.00

1910.37 K02

Serious Gravity 01 1 instance 15 exposed
Issued
Apr 22, 1994
Abate by
Apr 30, 1994
Penalty
Initial $525 · Current $288 Reduced
Recent events (2)
  • — I (S) $288.00
  • — Z (S) $525.00

1910.101 B

Serious Gravity 01 2 instances 15 exposed
Issued
Apr 22, 1994
Abate by
May 4, 1994
Penalty
Initial $525 · Current $288 Reduced
Recent events (2)
  • — I (S) $288.00
  • — Z (S) $525.00

1910.133 A01

Serious Gravity 01 1 instance 2 exposed
Issued
Apr 22, 1994
Abate by
May 4, 1994
Penalty
Initial $525 · Current $288 Reduced
Recent events (2)
  • — I (S) $288.00
  • — Z (S) $525.00

1910.147 C04 I

Serious Gravity 01 1 instance 15 exposed
Issued
Apr 22, 1994
Abate by
May 25, 1994
Penalty
Initial $525 · Current $288 Reduced
Recent events (2)
  • — I (S) $288.00
  • — Z (S) $525.00

1910.147 C05 I

Serious Gravity 01 1 instance 15 exposed
Issued
Apr 22, 1994
Abate by
May 20, 1994
Penalty
Initial $525 · Current $288 Reduced
Recent events (2)
  • — I (S) $288.00
  • — Z (S) $525.00

1910.147 C07 I

Serious Gravity 01 1 instance 15 exposed
Issued
Apr 22, 1994
Abate by
May 20, 1994
Penalty
Initial $525 · Current $288 Reduced
Recent events (2)
  • — I (S) $288.00
  • — Z (S) $525.00

1910.151 C

Serious Gravity 01 1 instance 15 exposed
Issued
Apr 22, 1994
Abate by
May 20, 1994
Penalty
Initial $525 · Current $288 Reduced
Recent events (2)
  • — I (S) $288.00
  • — Z (S) $525.00

1910.215 A02

Serious Gravity 01 1 instance 15 exposed
Issued
Apr 22, 1994
Abate by
May 20, 1994
Penalty
Initial $525 · Current $288 Reduced
Recent events (2)
  • — I (S) $288.00
  • — Z (S) $525.00

1910.215 D01

Serious Gravity 01 1 instance 15 exposed
Issued
Apr 22, 1994
Abate by
May 20, 1994
Penalty
Initial $525 · Current $288 Reduced
Recent events (2)
  • — I (S) $288.00
  • — Z (S) $525.00

1910.215 B09

Serious Gravity 01 1 instance 15 exposed
Issued
Apr 22, 1994
Abate by
May 20, 1994
Penalty
Initial $525 · Current $288 Reduced
Recent events (2)
  • — I (S) $288.00
  • — Z (S) $525.00

1910.1200 H

Serious Gravity 01 55 instances 55 exposed
Issued
Apr 22, 1994
Abate by
May 25, 1994
Penalty
Initial $525 · Current $288 Reduced
Recent events (2)
  • — I (S) $288.00
  • — Z (S) $525.00

1910.1200 G01

Serious Gravity 01 5 instances 55 exposed
Issued
Apr 22, 1994
Abate by
May 25, 1994
Penalty
Initial $525 · Current $288 Reduced
Recent events (2)
  • — I (S) $288.00
  • — Z (S) $525.00

1910.1200 E01

Serious Gravity 01 1 instance 55 exposed
Issued
Apr 22, 1994
Abate by
May 25, 1994
Penalty
Initial $525 · Current $288 Reduced
Recent events (2)
  • — I (S) $288.00
  • — Z (S) $525.00

1910.253 B04 III

Serious Gravity 01 2 instances 25 exposed
Issued
Apr 22, 1994
Abate by
May 20, 1994
Penalty
Initial $525 · Current $288 Reduced
Recent events (2)
  • — I (S) $288.00
  • — Z (S) $525.00

1910.253 B02 IV

Serious Gravity 01 2 instances 15 exposed
Issued
Apr 22, 1994
Abate by
Apr 30, 1994
Penalty
Initial $525 · Current $288 Reduced
Recent events (2)
  • — I (S) $288.00
  • — Z (S) $525.00

1910.215 A04

Serious Gravity 01 1 instance 15 exposed
Issued
Apr 22, 1994
Abate by
May 20, 1994
Penalty
Initial $525 · Current $288 Reduced
Recent events (2)
  • — I (S) $288.00
  • — Z (S) $525.00

1910.305 G01 III

Other-than-serious Gravity 00 2 instances 15 exposed
Issued
Apr 22, 1994
Abate by
May 20, 1994
Recent events (2)
  • — I (O)
  • — Z (O)

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 113214001.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.