Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,193,745Inspections Most recent open 2026-08-06 Last loaded 2026-08-10

OSHA Inspection: ELITE LINE CONSTRUCTION, INC.

Accident-driven inspection · Safety discipline

On , OSHA opened an accident-driven safety inspection of ELITE LINE CONSTRUCTION, INC. in 5 MI. SOUTH, 1 MI. EAST, 1 MI. SOUTH, 1/4 MI. WEST, FAULKTON, SD 57438 (NAICS 000000). OSHA activity number 113327837.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Elite Line Construction, INC. for free Get an email when a new federal OSHA severe-injury report for Elite Line Construction, INC. is published. One employer, no account, unsubscribe in one click.
Site address
5 MI. SOUTH, 1 MI. EAST, 1 MI. SOUTH, 1/4 MI. WEST
City
FAULKTON
State
SD
ZIP
57438
Mailing
3060 70TH STREET SW, MONTEVIDEO, MN 56265
Inspection type
Accident-driven (A)
Scope
Complete (A)
Discipline
Safety
Advance notice
Yes
Union status
N
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
1623
Employees
5
Ownership type
A
Industry flags
Construction safety.

4 citations on file for this inspection.

5(a)(1)

Serious Gravity 10 1 instance 1 exposed
Issued
Sep 9, 1998
Abate by
Sep 14, 1998
Penalty
Initial $1,500 · Current $1,125 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing or likely to cause death or serious physical harm to
employees in that employees
were exposed to:
(a) On or about 08/25/98 for employees assisting in the removal of power
poles adjacent
to an energized 7200 volt power distribution line and exposed to the
potential hazard of
electrical shock created by the pole making contact with the energized
overhead
distribution line.
Among other methods, one feasible and acceptable abatement method to
correct this hazard is
to ensure that the ground wire attached to the pole has a 3-foot gap cut
in it approximately 20
feet up from the butt end of the pole during pole removal.
Abatement Note:  Abatement certification and documentation are required
for
this item (see
enclosed "Sample Abatement Certification Letter").tion
Recent events (2)
  • · I (S) $1125.00
  • · Z (S) $1500.00

1910.269 A02 I

Serious Gravity 10 1 instance 1 exposed
Issued
Sep 9, 1998
Abate by
Dec 14, 1998
Penalty
Initial $1,500 · Current $1,125 Reduced
Recent events (2)
  • · I (S) $1125.00
  • · Z (S) $1500.00

1910.269 Q01 II

Serious Gravity 10 1 instance 1 exposed
Issued
Sep 9, 1998
Abate by
Sep 14, 1998
Penalty
Initial $1,500 · Current $1,125 Reduced
Recent events (2)
  • · I (S) $1125.00
  • · Z (S) $1500.00

1910.269 Q01 III

Serious Gravity 10 1 instance 1 exposed
Issued
Sep 9, 1998
Abate by
Sep 14, 1998

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 113327837.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.