DALLASTOWN, PA —
OSHA Inspection: R.J. CUSTOM PRODUCTS, INC. DBA ROJAHN COMPANY
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of R.J. CUSTOM PRODUCTS, INC. DBA ROJAHN COMPANY in 33 WEST MAPLE STREET, DALLASTOWN, PA 17313 (NAICS 337110). OSHA activity number 113737589.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- R.J. CUSTOM PRODUCTS, INC. DBA ROJAHN COMPANY
- Site address
- 33 WEST MAPLE STREET
- City
- DALLASTOWN
- State
- PA
- ZIP
- 17313
- Mailing
- 33 WEST MAPLE STREET, P.O. BOX 147, DALLASTOWN, PA 17313
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 337110
- SIC code (legacy)
- 2434
- Employees
- 25
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
7 citations on file for this inspection.
5(a)(1)
- Issued
- May 29, 2008
- Abate by
- Feb 28, 2009
- Penalty
- Initial $1,500 · Current $750 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to severe burns from the potential dust explosion, deflagration and fire hazards caused by the improper design and maintenance of dust collection system: (a)Building 1, Department 35 - The following deficiencies were found with dust collection systems: (1)PVC piping or plastic vent tubing was used to connect sections of duct work to the equipment. (2)Dust collection systems were not grounded and bonded to each other and to the equipment on the system. (3)The air flow of the collection system was not balanced for each piece of equipment. (4)The air flow was not sufficient to capture most of the wood dust. (5)The duct work was not constructed of all non-combustible material. (6)The main dust collection system did not have any deflagration venting to the outside. (7)The deflagration vent on the outside Torit dust collector was directed to a large glass window that was leading into the spray booth area for the stain wiping department. (8)The employer did not inspect on a routine basis the dust collection system and it was not maintained in accordance with manufactures recommendations. (b)Building 2, Department 30 - The following deficiencies were found with dust collection systems: (9)Enclosureless dust systems were located within twenty feet of each other. (10)PVC piping or plastic vent tubing was used to connect sections of duct work to the equipment. (11)The duct work and the enclosureless dust systems were not grounded and bonded to each other. (12)The large belt sander was ducted to the main building dust collection system and there was back flash damper to stop or prevent a flame front from entering Building 1 from Building 2 in the event of a dust explosion. (13)The enclosureless dust collection systems were not balance when new collection points were added. (14)The employer did not inspect on a routine basis the dust collection system and it was not maintained in accordance with manufactures recommendations. (15)The dust collection system was not capable of capturing the majority of combustible wood dust being generated. (16)The enclosureless dust collection systems was not protected by a spark detection system. "AMONG OTHER METHODS, ONE FEASIBLE AND ACCEPTABLE ABATEMENT METHOD TO CORRECT THESE HAZARDS IS ALL DUCT WORK SHALL BE CONSTRUCTED METAL AND BE BONDED AND GROUNDED FROM THE EQUIPMENT TO THE DUST COLLECTOR, BALANCE THE DUST COLLECTION SYSTEMs SO THAT THE WOOD DUST IS CAPTURED COMPLETELY, INCREASE THE DISTANCE BETWEEN ENCLOSURELESS SYSTEMS TO TWENTY FEET, MOVE THE DEFLAGRATION VENT ON THE TORIT COLLECTOR SO THAT IT DOES NOT PROJECT INTO THE OCCUPIED BUILDING, INSTALL A DEFLAGRATION VENT TO THE OUTSIDE FROM THE DUST COLLECTION PIPES TO REDUCE OR ELIMINATE ANY FLAME FRONT FROM ADVANCING, INSTALL A DEFLAGRATION VENT ON THE DUCT WORK FROM BUILDING 2 TO BUILDING 1 SO THAT DEFLAGRATION AND FLAME FRONT FROM ONE BUILDING WOULD NOT AFFECT ANOTHER BUILDING, PERFORM INSPECTIONS OF THE DUST COLLECTION SYSTEMS AND PROTECT ENCLOSURELESS DUST COLLECTION SYSTEMS WITH SPARK DETECTORS". VERIFICATION REQUIREDTION
Recent events (3)
- — P (S) $750.00
- — I (S) $750.00
- — Z (S) $1500.00
5(a)(1)
- Issued
- May 29, 2008
- Abate by
- Feb 28, 2009
- Penalty
- Initial $1,500 · Current $750 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to severe burns from the potential dust explosion, deflagration and fire hazards caused by improper design and maintenance of physical plant: (a)Building 1, Department 35 - The following deficiencies were found with plant design and maintenance: (1)Open flame Modine gas-fired heater was not provided outside air. (2)"Blow down" was proformed with the electric lights on and the Modine heater shutdown and cold. (3)Air hoses used during the "blow down" were greater than 15 psi and the air hoses were not conductive to eliminate static electric charge. (4)The floor of the work area was not vacuumed before "blow down" occurred. (b)Building 2, Department 30 - The following deficiencies were found with plant design and maintenance: (5)Open flame Modine gas-fired heater was not provided outside air. (6)"Blow down" was proformed with the electric lights on and the Modine heater shutdown and cold. (7)Air hoses used during the "blow down" were greater than 15 psi and the air hoses were not conductive to eliminate static electric charge. (8)The floor of the work area was not vacuumed before "blow down" occurred. "AMONG OTHER METHODS, ONE FEASIBLE AND ACCEPTABLE ABATEMENT METHOD TO CORRECT THESE HAZARDS IS TO REPLACE THE GAS FIRED HEATER WITH AN OUTSIDE AIR RECIEVER, CLEAN FLOOR AREA BEFORE BLOWING DOWN AND USE CONDUCTIVE AIR HOSES WITH REDUCED AIR PRESSURE TO 15 PSI OR LESS. VERIFICATION REQUIRED
Recent events (3)
- — P (S) $750.00
- — I (S) $750.00
- — Z (S) $1500.00
1910.22 A01
- Issued
- May 29, 2008
- Abate by
- Sep 30, 2008
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1500.00
1910.147 C01
- Issued
- May 29, 2008
- Abate by
- Sep 30, 2008
- Penalty
- Initial $600 · Current $300 Reduced
Recent events (2)
- — I (S) $300.00
- — Z (S) $600.00
1910.303 B07 I
- Issued
- May 29, 2008
- Abate by
- Jul 31, 2008
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1500.00
1910.307 C02 I
- Issued
- May 29, 2008
- Abate by
- Feb 28, 2009
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (3)
- — P (S) $750.00
- — I (S) $750.00
- — Z (S) $1500.00
1910.1200 E01
- Issued
- May 29, 2008
- Abate by
- Sep 30, 2008
- Penalty
- Initial $750 · Current $375 Reduced
Recent events (2)
- — I (S) $375.00
- — Z (S) $750.00
More inspections in this industry (NAICS 337110)
More inspections in PA