CLAYCOMO, MO ·
OSHA Inspection: FORD MOTOR CO. - KANSAS CITY ASSEMBLY PLANT
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of FORD MOTOR CO. - KANSAS CITY ASSEMBLY PLANT in U.S. HIGHWAY 69, CLAYCOMO, MO 64119 (NAICS 000000). OSHA activity number 113854590.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- FORD MOTOR CO. - KANSAS CITY ASSEMBLY PLANT
- Site address
- U.S. HIGHWAY 69
- City
- CLAYCOMO
- State
- MO
- ZIP
- 64119
- Mailing
- PO BOX 11009, KANSAS CITY, MO 64119
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Union (Y)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3711
- Employees
- 5371
- Ownership type
- Private (A)
- Industry flags
- Manufacturing safety.
Citations
47 citations on file for this inspection.
5(a)(1)
- Issued
- Aug 5, 1999
- Abate by
- Aug 26, 1999
- Penalty
- Initial $2,500 · Current $2,125 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of being struck by moving or falling loads being handled by the 3- ton underhung cranes/hoists as the pendant controls were illegible: Passenger Paint Sludge Room: The pendant controls for the 3-ton underhung hoists were illegible in that they had been wrapped in tape and coated with paint residues which prohibited the user from clearly identifying the indicators for direction of motion as required by ANSI B30.11: While ultimate responsibility for correcting the hazard rests with the employer, given his/her superior knowledge of the workplace, feasible and acceptable methods to correct this hazard, among others, include: 1) Wipe clean the pendant controls after each use to prevent the buildup of paint residues. 2) During operations where the buildup of paint residues is likely, secure a clear plastic bag over the pendant controls so that they are protected, yet the control functions are still visible to the operator. Abatement certification is required for this item - use the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET for this purpose.
Recent events (2)
- · I (S) $2125.00
- · Z (S) $2500.00
1910.22 A01
- Issued
- Aug 5, 1999
- Abate by
- Aug 10, 1999
- Penalty
- Initial $2,500 · Current $2,125 Reduced
Recent events (2)
- · I (S) $2125.00
- · Z (S) $2500.00
1910.22 A02
- Issued
- Aug 5, 1999
- Abate by
- Aug 20, 1999
- Penalty
- Initial $1,500
Recent events (2)
- · I (S)
- · Z (S) $1500.00
1910.23 A02
- Issued
- Aug 5, 1999
- Abate by
- Sep 7, 1999
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- · I (S) $2500.00
- · Z (S) $2500.00
1910.23 A05
- Issued
- Aug 5, 1999
- Abate by
- Sep 7, 1999
- Penalty
- Current $2,500
Recent events (2)
- · I (S) $2500.00
- · Z (S)
1910.23 C01
- Issued
- Aug 5, 1999
- Abate by
- Sep 7, 1999
- Penalty
- Initial $2,500 · Current $2,125 Reduced
Recent events (2)
- · I (S) $2125.00
- · Z (S) $2500.00
1910.23 D01 I
- Issued
- Aug 5, 1999
- Abate by
- May 17, 1999
- Penalty
- Initial $1,275 · Current $1,000 Reduced
Recent events (2)
- · I (S) $1000.00
- · Z (S) $1275.00
1910.23 D01 III
- Issued
- Aug 5, 1999
- Abate by
- May 17, 1999
1910.24 B
- Issued
- Aug 5, 1999
- Abate by
- Sep 7, 1999
- Penalty
- Initial $5,000 · Current $2,500 Reduced
Recent events (2)
- · I (S) $2500.00
- · Z (S) $5000.00
1910.37 I
- Issued
- Aug 5, 1999
- Abate by
- Sep 7, 1999
Recent events (2)
- · I (S)
- · Z (S)
1910.24 E
- Issued
- Aug 5, 1999
- Abate by
- Sep 7, 1999
- Penalty
- Initial $2,000 · Current $2,000
1910.36 B04
- Issued
- Aug 5, 1999
- Abate by
- Aug 10, 1999
- Penalty
- Initial $2,000 · Current $1,700 Reduced
Recent events (2)
- · I (S) $1700.00
- · Z (S) $2000.00
1910.37 K02
- Issued
- Aug 5, 1999
- Abate by
- Apr 13, 1999
- Penalty
- Initial $1,275
Recent events (2)
- · I (O)
- · Z (S) $1275.00
1910.106 D03 IIA
- Issued
- Aug 5, 1999
- Abate by
- Aug 10, 1999
- Penalty
- Initial $2,500 · Current $2,500
1910.106 E02 IIB2
- Issued
- Aug 5, 1999
- Abate by
- Aug 6, 2000
Recent events (2)
- · I (S)
- · Z (S)
1910.106 E02 IVA
- Issued
- Aug 5, 1999
- Abate by
- Aug 10, 1999
- Penalty
- Initial $2,000 · Current $1,700 Reduced
Recent events (2)
- · I (S) $1700.00
- · Z (S) $2000.00
1910.106 E06 II
- Issued
- Aug 5, 1999
- Abate by
- Sep 7, 1999
- Penalty
- Initial $2,500 · Current $2,125 Reduced
Recent events (2)
- · I (S) $2125.00
- · Z (S) $2500.00
1910.106 E09 III
- Issued
- Aug 5, 1999
- Abate by
- Aug 20, 1999
- Penalty
- Initial $2,000 · Current $1,700 Reduced
Recent events (2)
- · I (S) $1700.00
- · Z (S) $2000.00
1910.107 B05 I
- Issued
- Aug 5, 1999
- Abate by
- Sep 7, 1999
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- · I (S) $2500.00
- · Z (S) $2500.00
1910.107 B05 IV
- Issued
- Aug 5, 1999
- Abate by
- Aug 10, 1999
- Penalty
- Initial $2,500
Recent events (2)
- · I (S)
- · Z (S) $2500.00
1910.107 B08
- Issued
- Aug 5, 1999
- Abate by
- Aug 10, 1999
- Penalty
- Initial $2,500
Recent events (2)
- · I (S)
- · Z (S) $2500.00
1910.107 E02
- Issued
- Aug 5, 1999
- Abate by
- Aug 10, 1999
- Penalty
- Initial $2,500 · Current $2,125 Reduced
Recent events (2)
- · I (S) $2125.00
- · Z (S) $2500.00
1910.107 E03
- Issued
- Aug 5, 1999
- Abate by
- Aug 10, 1999
1910.107 E09
- Issued
- Aug 5, 1999
- Abate by
- Aug 10, 1999
- Penalty
- Initial $2,500
Recent events (2)
- · I (S)
- · Z (S) $2500.00
1910.107 G02
- Issued
- Aug 5, 1999
- Abate by
- Aug 10, 1999
- Penalty
- Initial $2,500 · Current $2,125 Reduced
Recent events (2)
- · I (S) $2125.00
- · Z (S) $2500.00
1910.107 G03
- Issued
- Aug 5, 1999
- Abate by
- Aug 10, 1999
- Penalty
- Initial $2,500 · Current $2,125 Reduced
Recent events (2)
- · I (S) $2125.00
- · Z (S) $2500.00
1910.107 G05
- Issued
- Aug 5, 1999
- Abate by
- Aug 10, 1999
- Penalty
- Initial $2,500
Recent events (2)
- · I (O)
- · Z (S) $2500.00
1910.147 C04 I
- Issued
- Aug 5, 1999
- Abate by
- Aug 20, 1999
- Penalty
- Initial $3,500 · Current $3,500
1910.147 C06 II
- Issued
- Aug 5, 1999
- Abate by
- Sep 7, 1999
- Penalty
- Initial $2,500 · Current $2,500
1910.176 A
- Issued
- Aug 5, 1999
- Abate by
- Aug 20, 1999
- Penalty
- Initial $2,500 · Current $2,125 Reduced
Recent events (2)
- · I (S) $2125.00
- · Z (S) $2500.00
1910.184 E01
- Issued
- Aug 5, 1999
- Abate by
- Sep 7, 1999
- Penalty
- Initial $2,500 · Current $2,500
1910.184 E02 I
- Issued
- Aug 5, 1999
- Abate by
- Sep 7, 1999
- Penalty
- Initial $2,500 · Current $2,500
1910.212 A01
- Issued
- Aug 5, 1999
- Abate by
- Sep 7, 1999
- Penalty
- Initial $5,000 · Current $2,500 Reduced
Recent events (2)
- · I (S) $2500.00
- · Z (S) $5000.00
1910.212 A03 II
- Issued
- Aug 5, 1999
- Abate by
- Sep 7, 1999
- Penalty
- Initial $5,000 · Current $5,000
1910.212 A05
- Issued
- Aug 5, 1999
- Abate by
- May 17, 1999
- Penalty
- Initial $1,275 · Current $1,275
1910.219 C02 I
- Issued
- Aug 5, 1999
- Abate by
- Aug 20, 1999
- Penalty
- Initial $2,000 · Current $2,500
Recent events (2)
- · I (S) $2500.00
- · Z (S) $2000.00
1910.219 F03
- Issued
- Aug 5, 1999
- Abate by
- Aug 23, 1999
- Penalty
- Initial $2,500
Recent events (2)
- · I (S)
- · Z (S) $2500.00
1910.254 B04 IV
- Issued
- Aug 5, 1999
- Abate by
- Aug 10, 1999
- Penalty
- Initial $2,000 · Current $3,500
Recent events (2)
- · I (S) $3500.00
- · Z (S) $2000.00
1910.303 B01
- Issued
- Aug 5, 1999
- Abate by
- Aug 10, 1999
- Penalty
- Initial $3,500
Recent events (2)
- · I (S)
- · Z (S) $3500.00
1910.305 B01
- Issued
- Aug 5, 1999
- Abate by
- Aug 10, 1999
- Penalty
- Initial $2,000 · Current $3,500
Recent events (2)
- · I (S) $3500.00
- · Z (S) $2000.00
1910.305 B02
- Issued
- Aug 5, 1999
- Abate by
- Aug 10, 1999
1910.305 G01 III
- Issued
- Aug 5, 1999
- Abate by
- Aug 10, 1999
- Penalty
- Initial $3,500
Recent events (2)
- · I (S)
- · Z (S) $3500.00
1910.22 A02
- Issued
- Aug 5, 1999
- Abate by
- Aug 20, 1999
- Penalty
- Initial $7,500 · Current $3,750 Reduced
Recent events (2)
- · I (R) $3750.00
- · Z (R) $7500.00
1910.184 E03 I
- Issued
- Aug 5, 1999
- Abate by
- Sep 7, 1999
- Penalty
- Initial $12,500 · Current $6,250 Reduced
Recent events (2)
- · I (R) $6250.00
- · Z (R) $12500.00
1910.242 B
- Issued
- Aug 5, 1999
- Abate by
- Aug 10, 1999
- Penalty
- Initial $10,000 · Current $5,000 Reduced
Recent events (2)
- · I (R) $5000.00
- · Z (R) $10000.00
1910.305 A02 IIIF
- Issued
- Aug 5, 1999
- Abate by
- Aug 10, 1999
- Penalty
- Initial $7,500 · Current $3,750 Reduced
Recent events (2)
- · I (R) $3750.00
- · Z (R) $7500.00
1910.141 A03 I
- Issued
- Aug 5, 1999
- Abate by
- Aug 9, 1999
More inspections at Ford Motor CO. - Kansas City Assembly Plant
View Ford Motor CO. - Kansas City Assembly Plant's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in MO
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 113854590.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.