PHOENIX, AZ —
OSHA Inspection: PERMA-FINISH INC
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of PERMA-FINISH INC in 74 N 45TH AVE, PHOENIX, AZ 85043 (NAICS 000000). OSHA activity number 115605214.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PERMA-FINISH INC
- Site address
- 74 N 45TH AVE
- City
- PHOENIX
- State
- AZ
- ZIP
- 85043
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Health
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3479
- Employees
- 60
- Ownership type
- A
- Industry flags
- Manufacturing health.
Citations
22 citations on file for this inspection.
1910.215 A02
- Issued
- Jul 28, 1994
- Abate by
- Jul 31, 1994
- Penalty
- Initial $1,000 · Current $1,000
1910.1200 E01
- Issued
- Jul 28, 1994
- Abate by
- Aug 18, 1994
- Penalty
- Initial $1,250 · Current $1,250
1910.1200 F05 I
- Issued
- Jul 28, 1994
- Abate by
- Aug 4, 1994
1910.1200 F05 II
- Issued
- Jul 28, 1994
- Abate by
- Aug 4, 1994
1910.1200 H01 I
- Issued
- Jul 28, 1994
- Abate by
- Aug 18, 1994
1910.23 C02
- Issued
- Jul 28, 1994
- Abate by
- Aug 7, 1994
1910.94 D02 I
- Issued
- Jul 28, 1994
- Abate by
- Aug 4, 1994
1910.94 D09 VII
- Issued
- Jul 28, 1994
- Abate by
- Aug 7, 1994
1910.94 D11 I
- Issued
- Jul 28, 1994
- Abate by
- Aug 7, 1994
1910.106 E09 III
- Issued
- Jul 28, 1994
- Abate by
- Jul 31, 1994
1910.107 B05 I
- Issued
- Jul 28, 1994
- Abate by
- Aug 18, 1994
1910.107 B05 I
- Issued
- Jul 28, 1994
- Abate by
- Aug 18, 1994
1910.107 B10
- Issued
- Jul 28, 1994
- Abate by
- Aug 18, 1994
1910.107 C06 1
- Issued
- Jul 28, 1994
- Abate by
- Aug 18, 1994
1910.107 I04
- Issued
- Jul 28, 1994
- Abate by
- Jul 31, 1994
1910.157 C01
- Issued
- Jul 28, 1994
- Abate by
- Jul 31, 1994
1910.157 E03
- Issued
- Jul 28, 1994
- Abate by
- Jul 31, 1994
1910.157 G01
- Issued
- Jul 28, 1994
- Abate by
- Jul 31, 1994
1910.213 H01
- Issued
- Jul 28, 1994
- Abate by
- Jul 31, 1994
1910.215 B09
- Issued
- Jul 28, 1994
- Abate by
- Jul 31, 1994
1910.305 B02
- Issued
- Jul 28, 1994
- Abate by
- Jul 31, 1994
R4130631 A
- Issued
- Jul 28, 1994
- Abate by
- Jul 31, 1994
- Penalty
- Initial $100 · Current $100
More inspections at Perma-Finish INC
View Perma-Finish INC's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in AZ
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 115605214.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.