FULTON, MO —
OSHA Inspection: PROFESSIONAL CONTRACTORS & ENGINEERS, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of PROFESSIONAL CONTRACTORS & ENGINEERS, INC. in 6498 JADE RD. (ANIMAL TESTING FAC), FULTON, MO 65251 (NAICS 000000). OSHA activity number 116100124.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PROFESSIONAL CONTRACTORS & ENGINEERS, INC.
- Site address
- 6498 JADE RD. (ANIMAL TESTING FAC)
- City
- FULTON
- State
- MO
- ZIP
- 65251
- Mailing
- 4250 E. BROADWAY, P. O. BOX 7509, COLUMBIA, MO 65205
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 1542
- Employees
- 9
- Ownership type
- A
- Industry flags
- Construction safety.
Citations
19 citations on file for this inspection.
1926.20 B02
- Issued
- Jul 19, 1993
- Abate by
- Aug 6, 1993
- Penalty
- Initial $1,200 · Current $900 Reduced
Recent events (2)
- — I (S) $900.00
- — Z (S) $1200.00
1926.21 B02
- Issued
- Jul 19, 1993
- Abate by
- Oct 15, 1993
- Penalty
- Initial $1,500 · Current $1,175 Reduced
Recent events (2)
- — I (S) $1175.00
- — Z (S) $1500.00
1926.451 A03
- Issued
- Jul 19, 1993
- Abate by
- Aug 6, 1993
1926.152 A01
- Issued
- Jul 19, 1993
- Abate by
- Aug 6, 1993
- Penalty
- Initial $1,200 · Current $900 Reduced
Recent events (2)
- — I (S) $900.00
- — Z (S) $1200.00
1926.303 C03
- Issued
- Jul 19, 1993
- Abate by
- Aug 6, 1993
- Penalty
- Initial $2,100 · Current $1,575 Reduced
Recent events (2)
- — I (S) $1575.00
- — Z (S) $2100.00
1926.403 H
- Issued
- Jul 19, 1993
- Abate by
- Aug 6, 1993
- Penalty
- Initial $900 · Current $675 Reduced
Recent events (2)
- — I (S) $675.00
- — Z (S) $900.00
1926.405 B02
- Issued
- Jul 19, 1993
- Abate by
- Aug 6, 1993
- Penalty
- Initial $1,200 · Current $900 Reduced
Recent events (2)
- — I (S) $900.00
- — Z (S) $1200.00
1926.405 D
- Issued
- Jul 19, 1993
- Abate by
- Aug 6, 1993
- Penalty
- Initial $1,200 · Current $900 Reduced
Recent events (2)
- — I (S) $900.00
- — Z (S) $1200.00
1926.416 E01
- Issued
- Jul 19, 1993
- Abate by
- Aug 6, 1993
- Penalty
- Initial $1,200 · Current $900 Reduced
Recent events (2)
- — I (S) $900.00
- — Z (S) $1200.00
1926.451 A04
- Issued
- Jul 19, 1993
- Abate by
- Aug 6, 1993
- Penalty
- Initial $1,500 · Current $590 Reduced
Recent events (2)
- — I (S) $590.00
- — Z (S) $1500.00
1926.451 A12
- Issued
- Jul 19, 1993
- Abate by
- Aug 6, 1993
- Penalty
- Initial $1,500 · Current $590 Reduced
Recent events (2)
- — I (S) $590.00
- — Z (S) $1500.00
1926.701 B
- Issued
- Jul 19, 1993
- Abate by
- Aug 6, 1993
- Penalty
- Initial $1,500 · Current $150 Reduced
Recent events (2)
- — I (O) $150.00
- — Z (S) $1500.00
1926.1052 A03
- Issued
- Jul 19, 1993
- Abate by
- Aug 6, 1993
- Penalty
- Initial $900 · Current $675 Reduced
Recent events (2)
- — I (S) $675.00
- — Z (S) $900.00
1926.1052 C01
- Issued
- Jul 19, 1993
- Abate by
- Aug 6, 1993
- Penalty
- Initial $1,200 · Current $900 Reduced
Recent events (2)
- — I (S) $900.00
- — Z (S) $1200.00
1926.1060 A
- Issued
- Jul 19, 1993
- Abate by
- Aug 6, 1993
- Penalty
- Initial $1,200 · Current $900 Reduced
Recent events (2)
- — I (S) $900.00
- — Z (S) $1200.00
1910.20 G02
- Issued
- Jul 19, 1993
- Abate by
- Sep 10, 1993
Recent events (2)
- — I (O)
- — Z (O)
1926.50 C
- Issued
- Jul 19, 1993
- Abate by
- Oct 15, 1993
- Penalty
- Initial $600 · Current $450 Reduced
Recent events (2)
- — I (O) $450.00
- — Z (O) $600.00
1926.59 E01 II
- Issued
- Jul 19, 1993
- Abate by
- Aug 13, 1993
Recent events (2)
- — I (O)
- — Z (O)
1926.651 L01
- Issued
- Jul 19, 1993
- Abate by
- Aug 6, 1993
- Penalty
- Initial $600 · Current $450 Reduced
Recent events (2)
- — I (O) $450.00
- — Z (O) $600.00
More inspections at Professional Contractors & Engineers, INC.
View Professional Contractors & Engineers, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in MO
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 116100124.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.