Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: PRIOR REMANUFACTURING

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of PRIOR REMANUFACTURING in 315 INTERNATIONAL ROAD, GARLAND, TX 75043 (NAICS 000000). OSHA activity number 116308495.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Prior Remanufacturing — free Get an email when a new federal OSHA severe-injury report for Prior Remanufacturing is published. One employer, no account, unsubscribe in one click.
Site address
315 INTERNATIONAL ROAD
City
GARLAND
State
TX
ZIP
75043
Mailing
P. O. BOX 462167, GARLAND, TX 75046
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
3714
Employees
119
Ownership type
A
Industry flags
Manufacturing safety.

17 citations on file for this inspection.

5(a)(1)

Serious Gravity 10 1 instance 82 exposed
Issued
Dec 8, 1995
Abate by
Jul 29, 1996
Penalty
Initial $4,000 · Current $3,000 Reduced
SECTION 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment to employees which was free from recognized hazards
that were causing or
likely to cause serious physical harm to employees when compressed air is
transmitted through
polyvinyl chloride (PVC) pipe, exposing employees to the hazard of being
struck by flying
fragments:
a.Polyvinyl chloride PVC pipe was installed throughout the plant and used
to
transmit compressed air for plant use.
Feasible abatement methods to correct this condition may include but are
not limited to:
1.Enclosing the polyvinyl chloride (PVC) line in a conduit pipe of
sufficient
strength to provide protection from external damage and prevent employees
from
being struck by flying fragments.
2.Install a pipe system designed for compressed air as recommended by the
American National Standards Institute, American Society of Mechanical
Engineers
(ANSI/ASME B.31.8.1986, Sections 842.32, 842.43 and 849.52(b) Gas
Transmission and Distribution Piping System.
Recent events (2)
  • — F (S) $3000.00
  • — Z (S) $4000.00

1910.36 B08

Other-than-serious Gravity 02 1 instance 6 exposed
Issued
Dec 8, 1995
Abate by
Jan 29, 1996
Penalty
Initial $1,600 · Current $100 Reduced
Recent events (2)
  • — F (O) $100.00
  • — Z (S) $1600.00

1910.212 A01

Serious Gravity 01 1 instance 2 exposed
Issued
Dec 8, 1995
Abate by
Jan 29, 1996
Penalty
Initial $1,200 · Current $1,000 Reduced
Recent events (2)
  • — F (S) $1000.00
  • — Z (S) $1200.00

1910.212 A03 II

Serious Gravity 10 1 instance 1 exposed
Issued
Dec 8, 1995
Abate by
Jan 29, 1996
Penalty
Initial $4,000 · Current $3,000 Reduced
Recent events (2)
  • — F (S) $3000.00
  • — Z (S) $4000.00

1910.215 A02

Serious Gravity 01 1 instance 4 exposed
Issued
Dec 8, 1995
Abate by
Jan 29, 1996
Penalty
Initial $1,200 · Current $1,000 Reduced
Recent events (2)
  • — F (S) $1000.00
  • — Z (S) $1200.00

1910.215 A04

Serious Gravity 01 1 instance 4 exposed
Issued
Dec 8, 1995
Abate by
Jan 29, 1996
Penalty
Initial $1,200
Recent events (2)
  • — F (S)
  • — Z (S) $1200.00

1910.215 B09

Serious Gravity 01 1 instance 4 exposed
Issued
Dec 8, 1995
Abate by
Jan 29, 1996
Recent events (2)
  • — F (S)
  • — Z (S)

1910.217 B03 I

Serious Gravity 01 1 instance 2 exposed
Issued
Dec 8, 1995
Abate by
Jan 29, 1996
Penalty
Initial $1,200 · Current $600 Reduced
Recent events (2)
  • — F (S) $600.00
  • — Z (S) $1200.00

1910.217 B05 I

Serious Gravity 01 1 instance 2 exposed
Issued
Dec 8, 1995
Abate by
Jan 29, 1996
Recent events (2)
  • — F (S)
  • — Z (S)

1910.217 C01 I

Serious Gravity 01 1 instance 2 exposed
Issued
Dec 8, 1995
Abate by
Jan 29, 1996
Recent events (2)
  • — F (S)
  • — Z (S)

1910.219 D01

Serious Gravity 03 1 instance 4 exposed
Issued
Dec 8, 1995
Abate by
Jan 29, 1996
Penalty
Initial $2,000 · Current $1,000 Reduced
Recent events (2)
  • — F (S) $1000.00
  • — Z (S) $2000.00

1910.219 E03 I

Serious Gravity 03 1 instance 4 exposed
Issued
Dec 8, 1995
Abate by
Jan 29, 1996
Recent events (2)
  • — F (S)
  • — Z (S)

1910.219 I02

Serious Gravity 01 1 instance 1 exposed
Issued
Dec 8, 1995
Abate by
Jan 29, 1996
Penalty
Initial $1,200
Recent events (2)
  • — F (S)
  • — Z (S) $1200.00

1910.242 B

Other-than-serious Gravity 01 1 instance 20 exposed
Issued
Dec 8, 1995
Abate by
Jan 29, 1996
Penalty
Initial $1,200
Recent events (2)
  • — F (O)
  • — Z (S) $1200.00

1910.304 F05 V

Serious Gravity 03 1 instance 2 exposed
Issued
Dec 8, 1995
Abate by
Jan 29, 1996
Penalty
Initial $2,000 · Current $1,000 Reduced
Recent events (2)
  • — F (S) $1000.00
  • — Z (S) $2000.00

1910.147 C04 I

Other-than-serious Gravity 01 1 instance 2 exposed
Issued
Dec 8, 1995
Abate by
Jan 29, 1996
Recent events (2)
  • — F (O)
  • — Z (O)

1910.303 F

Other-than-serious Gravity 01 1 instance 1 exposed
Issued
Dec 8, 1995
Abate by
Jan 29, 1996
Recent events (2)
  • — F (O)
  • — Z (O)

View Prior Remanufacturing's full OSHA safety record →