SOLON, OH —
OSHA Inspection: ROBBINS COMPANY
Complaint inspection · Health discipline
At a glance
On , OSHA opened a complaint health inspection of ROBBINS COMPANY in 29100 HALL STREET, SOLON, OH 44139 (NAICS 000000). OSHA activity number 118118926.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ROBBINS COMPANY
- Site address
- 29100 HALL STREET
- City
- SOLON
- State
- OH
- ZIP
- 44139
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3532
- Employees
- 40
- Ownership type
- A
Citations
45 citations on file for this inspection.
1910.134 C
- Issued
- Mar 22, 1999
- Abate by
- May 24, 1999
Recent events (2)
- — I (U)
- — Z (U)
1910.134 H02 I
- Issued
- Mar 22, 1999
- Abate by
- Mar 28, 1999
Recent events (2)
- — I (U)
- — Z (U)
5(a)(1)
- Issued
- Mar 22, 1999
- Abate by
- Apr 30, 1999
- Penalty
- Initial $1,250 · Current $750 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees: SMALL ASSEMBLY AREA: Employees, who operated the Ridgid "500 A" pipe threading machine, were exposed to the hazard of rotating pipe. The employer did not ensure that a foot switch was installed on the machine so that the operator was provided with a safe means to shut off the power to the rotating chuck. The hand switch to the pipe threading machine was located anywhere between 4 and 7 feet from the operator, depending on the length of the pipe being processed. Among other methods to correct the hazard, one feasible and acceptable abatement method would be to install a foot switch for the "500 A" pipe threading machine as recommended by the manufacturer in their publication #TF-535-74-R.
Recent events (2)
- — I (S) $750.00
- — Z (S) $1250.00
1910.29 A03 VIII
- Issued
- Mar 22, 1999
- Abate by
- Mar 25, 1999
- Penalty
- Initial $1,750 · Current $1,050 Reduced
Recent events (2)
- — I (S) $1050.00
- — Z (S) $1750.00
1910.38 A01
- Issued
- Mar 22, 1999
- Abate by
- May 24, 1999
- Penalty
- Initial $750 · Current $450 Reduced
Recent events (2)
- — I (S) $450.00
- — Z (S) $750.00
1910.94 C02
- Issued
- Mar 22, 1999
- Abate by
- May 24, 1999
- Penalty
- Initial $1,000 · Current $600 Reduced
Recent events (2)
- — I (S) $600.00
- — Z (S) $1000.00
1910.107 C06
- Issued
- Mar 22, 1999
- Abate by
- May 24, 1999
Recent events (2)
- — I (S)
- — Z (S)
1910.304 F05 VA
- Issued
- Mar 22, 1999
- Abate by
- May 24, 1999
Recent events (2)
- — I (S)
- — Z (S)
1910.307 B
- Issued
- Mar 22, 1999
- Abate by
- May 24, 1999
Recent events (2)
- — I (S)
- — Z (S)
1910.95 C01
- Issued
- Mar 22, 1999
- Abate by
- May 24, 1999
- Penalty
- Initial $2,500 · Current $1,500 Reduced
8111
Recent events (2)
- — I (S) $1500.00
- — Z (S) $2500.00
1910.107 D05
- Issued
- Mar 22, 1999
- Abate by
- Apr 24, 1999
- Penalty
- Initial $1,000 · Current $600 Reduced
Recent events (2)
- — I (S) $600.00
- — Z (S) $1000.00
1910.107 D06
- Issued
- Mar 22, 1999
- Abate by
- Apr 24, 1999
Recent events (2)
- — I (S)
- — Z (S)
1910.107 G07
- Issued
- Mar 22, 1999
- Abate by
- Mar 28, 1999
- Penalty
- Initial $1,000 · Current $600 Reduced
Recent events (2)
- — I (S) $600.00
- — Z (S) $1000.00
1910.132 A
- Issued
- Mar 22, 1999
- Abate by
- Apr 9, 1999
- Penalty
- Initial $1,750 · Current $1,050 Reduced
Recent events (2)
- — I (S) $1050.00
- — Z (S) $1750.00
1910.132 D01
- Issued
- Mar 22, 1999
- Abate by
- Apr 24, 1999
- Penalty
- Initial $1,750 · Current $1,050 Reduced
Recent events (2)
- — I (S) $1050.00
- — Z (S) $1750.00
1910.132 F04
- Issued
- Mar 22, 1999
- Abate by
- Apr 24, 1999
- Penalty
- Initial $1,000 · Current $600 Reduced
Recent events (2)
- — I (S) $600.00
- — Z (S) $1000.00
1910.133 A02
- Issued
- Mar 22, 1999
- Abate by
- Mar 28, 1999
- Penalty
- Initial $1,000 · Current $600 Reduced
Recent events (2)
- — I (S) $600.00
- — Z (S) $1000.00
1910.133 A05
- Issued
- Mar 22, 1999
- Abate by
- Mar 28, 1999
Recent events (2)
- — I (S)
- — Z (S)
1910.147 C04 I
- Issued
- Mar 22, 1999
- Abate by
- May 24, 1999
- Penalty
- Initial $1,250 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1250.00
1910.147 C07 I
- Issued
- Mar 22, 1999
- Abate by
- May 24, 1999
Recent events (2)
- — I (S)
- — Z (S)
1910.157 G01
- Issued
- Mar 22, 1999
- Abate by
- Apr 24, 1999
- Penalty
- Initial $1,000 · Current $600 Reduced
Recent events (2)
- — I (S) $600.00
- — Z (S) $1000.00
1910.178 L
- Issued
- Mar 22, 1999
- Abate by
- May 24, 1999
- Penalty
- Initial $2,500 · Current $1,500 Reduced
Recent events (2)
- — I (S) $1500.00
- — Z (S) $2500.00
1910.178 M05 III
- Issued
- Mar 22, 1999
- Abate by
- Mar 25, 1999
- Penalty
- Initial $1,250 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1250.00
1910.178 M11
- Issued
- Mar 22, 1999
- Abate by
- May 24, 1999
- Penalty
- Initial $1,250 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1250.00
1910.178 M12
- Issued
- Mar 22, 1999
- Abate by
- Mar 30, 1999
- Penalty
- Initial $1,750 · Current $1,050 Reduced
Recent events (2)
- — I (S) $1050.00
- — Z (S) $1750.00
1910.178 P01
- Issued
- Mar 22, 1999
- Abate by
- Mar 28, 1999
- Penalty
- Initial $1,250 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1250.00
1910.178 Q07
- Issued
- Mar 22, 1999
- Abate by
- Mar 28, 1999
Recent events (2)
- — I (S)
- — Z (S)
1910.212 A01
- Issued
- Mar 22, 1999
- Abate by
- Mar 25, 1999
- Penalty
- Initial $1,000 · Current $600 Reduced
Recent events (2)
- — I (S) $600.00
- — Z (S) $1000.00
1910.213 H01
- Issued
- Mar 22, 1999
- Abate by
- Mar 25, 1999
- Penalty
- Initial $1,250 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1250.00
1910.213 H04
- Issued
- Mar 22, 1999
- Abate by
- Mar 25, 1999
Recent events (2)
- — I (S)
- — Z (S)
1910.215 A04
- Issued
- Mar 22, 1999
- Abate by
- Mar 25, 1999
- Penalty
- Initial $1,000 · Current $600 Reduced
Recent events (2)
- — I (S) $600.00
- — Z (S) $1000.00
1910.215 B09
- Issued
- Mar 22, 1999
- Abate by
- Mar 25, 1999
Recent events (2)
- — I (S)
- — Z (S)
1910.215 D01
- Issued
- Mar 22, 1999
- Abate by
- Mar 28, 1999
Recent events (2)
- — I (S)
- — Z (S)
1910.242 B
- Issued
- Mar 22, 1999
- Abate by
- Mar 25, 1999
- Penalty
- Initial $1,250 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1250.00
1910.244 B
- Issued
- Mar 22, 1999
- Abate by
- Apr 9, 1999
- Penalty
- Initial $1,250 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1250.00
1910.252 A01 II
- Issued
- Mar 22, 1999
- Abate by
- May 24, 1999
- Penalty
- Initial $1,000 · Current $600 Reduced
Recent events (2)
- — I (S) $600.00
- — Z (S) $1000.00
1910.252 A02 II
- Issued
- Mar 22, 1999
- Abate by
- Mar 30, 1999
Recent events (2)
- — I (S)
- — Z (S)
1910.252 A02 IIIA
- Issued
- Mar 22, 1999
- Abate by
- May 24, 1999
Recent events (2)
- — I (S)
- — Z (S)
1910.252 A02 IV
- Issued
- Mar 22, 1999
- Abate by
- May 24, 1999
Recent events (2)
- — I (S)
- — Z (S)
1910.303 G01 II
- Issued
- Mar 22, 1999
- Abate by
- Mar 30, 1999
- Penalty
- Initial $1,000 · Current $600 Reduced
Recent events (2)
- — I (S) $600.00
- — Z (S) $1000.00
1910.303 G01 III
- Issued
- Mar 22, 1999
- Abate by
- Apr 24, 1999
Recent events (2)
- — I (S)
- — Z (S)
1910.1200 E01
- Issued
- Mar 22, 1999
- Abate by
- Apr 24, 1999
- Penalty
- Initial $750 · Current $350 Reduced
Recent events (2)
- — I (S) $350.00
- — Z (S) $750.00
1910.1200 H01
- Issued
- Mar 22, 1999
- Abate by
- Apr 24, 1999
Recent events (2)
- — I (S)
- — Z (S)
1910.255 E
- Issued
- Mar 22, 1999
- Abate by
- Mar 25, 1999
Recent events (2)
- — I (O)
- — Z (O)
1910.305 B01
- Issued
- Mar 22, 1999
- Abate by
- Mar 28, 1999
Recent events (2)
- — I (O)
- — Z (O)
More inspections at Robbins Company
View Robbins Company's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in OH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 118118926.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.