Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,197,124Inspections Most recent open 2026-08-25 Last loaded 2026-08-28

OSHA Inspection: CONCRETE ENGINEERING COMPANY

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of CONCRETE ENGINEERING COMPANY in AVE PONCE DE LEON ESQ CALLE BETANCES, HATO REY, PR 00919 (NAICS 000000). OSHA activity number 119471761.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Concrete Engineering Company for free Get an email when a new federal OSHA severe-injury report for Concrete Engineering Company is published. One employer, no account, unsubscribe in one click.
Site address
AVE PONCE DE LEON ESQ CALLE BETANCES
City
HATO REY
State
PR
ZIP
00919
Mailing
SUITE 288 PMC SAN PATRICIO PLAZA, GUAYNABO, PR 00968
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Non-union (N)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
000000
SIC code (legacy)
1542
Employees
31
Ownership type
Private (A)
Industry flags
Construction safety.

20 citations on file for this inspection.

1926.21 B02

Serious Gravity 10 1 instance 31 exposed
Issued
Apr 6, 1995
Abate by
Apr 25, 1995
Penalty
Initial $2,500 · Current $1,250 Reduced
Recent events (2)
  • · I (S) $1250.00
  • · Z (S) $2500.00

1926.28 A

Serious Gravity 10 2 instances 2 exposed
Issued
Apr 6, 1995
Abate by
Apr 12, 1995
Penalty
Initial $2,500 · Current $1,250 Reduced
Recent events (2)
  • · I (S) $1250.00
  • · Z (S) $2500.00

1926.28 A

Serious Gravity 01 1 instance 2 exposed
Issued
Apr 6, 1995
Abate by
Apr 18, 1995
Penalty
Initial $750 · Current $375 Reduced
Recent events (2)
  • · I (S) $375.00
  • · Z (S) $750.00

1926.102 A01

Serious Gravity 01 3 instances 2 exposed
Issued
Apr 6, 1995
Abate by
Apr 12, 1995
Penalty
Initial $750 · Current $375 Reduced
Recent events (2)
  • · I (S) $375.00
  • · Z (S) $750.00

1926.150 A01

Serious Gravity 02 1 instance 31 exposed
Issued
Apr 6, 1995
Abate by
Apr 25, 1995
Penalty
Initial $1,000 · Current $500 Reduced
Recent events (2)
  • · I (S) $500.00
  • · Z (S) $1000.00

1926.350 J

Serious Gravity 02 1 instance 2 exposed
Issued
Apr 6, 1995
Abate by
Apr 11, 1995
Penalty
Initial $1,000 · Current $500 Reduced
Recent events (2)
  • · I (S) $500.00
  • · Z (S) $1000.00

1926.404 F06

Serious Gravity 03 1 instance 2 exposed
Issued
Apr 6, 1995
Abate by
Apr 11, 1995
Penalty
Initial $1,250 · Current $625 Reduced
Recent events (2)
  • · I (S) $625.00
  • · Z (S) $1250.00

1926.500 D01

Serious Gravity 01 1 instance 6 exposed
Issued
Apr 6, 1995
Abate by
Apr 12, 1995
Penalty
Initial $750 · Current $375 Reduced
Recent events (2)
  • · I (S) $375.00
  • · Z (S) $750.00

1926.550 A06

Serious Gravity 01 1 instance 1 exposed
Issued
Apr 6, 1995
Abate by
Apr 11, 1995
Penalty
Initial $750 · Current $375 Reduced
Recent events (2)
  • · I (S) $375.00
  • · Z (S) $750.00

1926.550 A09

Serious Gravity 01 1 instance 31 exposed
Issued
Apr 6, 1995
Abate by
Apr 12, 1995
Penalty
Initial $750 · Current $375 Reduced
Recent events (2)
  • · I (S) $375.00
  • · Z (S) $750.00

1903.2 A01

Other-than-serious Gravity 03 1 instance 31 exposed
Issued
Apr 6, 1995
Abate by
Apr 11, 1995
Penalty
Initial $500 · Current $250 Reduced
Recent events (2)
  • · I (O) $250.00
  • · Z (O) $500.00

SPECRULE 1

Other-than-serious Gravity 03 1 instance 2 exposed
Issued
Apr 6, 1995
Abate by
Apr 14, 1995
Penalty
Initial $250 · Current $250

1926.25 A

Other-than-serious Gravity 01 1 instance 31 exposed
Issued
Apr 6, 1995
Abate by
Apr 12, 1995

1926.50 F

Other-than-serious Gravity 01 1 instance 31 exposed
Issued
Apr 6, 1995
Abate by
Apr 12, 1995

1926.51 C01

Other-than-serious Gravity 01 1 instance 31 exposed
Issued
Apr 6, 1995
Abate by
Apr 14, 1995

1926.100 A

Serious Gravity 01 1 instance 3 exposed
Issued
Apr 6, 1995
Abate by
Apr 12, 1995
Penalty
Initial $750 · Current $125 Reduced
Recent events (2)
  • · I (S) $125.00
  • · Z (S) $750.00

1926.150 C01 I

Other-than-serious Gravity 01 1 instance 31 exposed
Issued
Apr 6, 1995
Abate by
Apr 12, 1995

1926.150 C01 VI

Other-than-serious Gravity 03 1 instance 31 exposed
Issued
Apr 6, 1995
Abate by
Apr 12, 1995
Penalty
Initial $500 · Current $375 Reduced
Recent events (2)
  • · I (O) $375.00
  • · Z (O) $500.00

1926.152 G09

Other-than-serious Gravity 01 1 instance 31 exposed
Issued
Apr 6, 1995
Abate by
Apr 12, 1995

1926.1053 B05 1

Other-than-serious Gravity 01 1 instance 1 exposed
Issued
Apr 6, 1995
Abate by
Apr 11, 1995

View Concrete Engineering Company's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 119471761.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.