GROVE CITY, OH —
OSHA Inspection: FABCON, LLC
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of FABCON, LLC in 4751 BIG RUN SOUTH ROAD, GROVE CITY, OH 43123 (NAICS 000000). OSHA activity number 121910913.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- FABCON, LLC
- Site address
- 4751 BIG RUN SOUTH ROAD
- City
- GROVE CITY
- State
- OH
- ZIP
- 43123
- Mailing
- 3400 JACKSON PIKE, GROVE CITY, OH 43123
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3272
- Employees
- 107
- Ownership type
- A
Citations
76 citations on file for this inspection.
5(a)(1)
- Issued
- Oct 5, 2000
- Abate by
- Feb 7, 2001
- Penalty
- Initial $7,000 · Current $2,800 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees: a.In the production facility, employees performing setup, casting, cleanup, stripping, maintenance, quality assurance, and other jobs on and around rolling beds #1 and 2 were exposed to struck-by, caught-in, and fall hazards. The rolling beds #1 and 2 which were approximately 900 feet and 830 feet long, respectively, were unsafe to work on and around due to the following unsafe conditions: operators were not able to visibly see the entire bed or all employees who were in the area while the rolling beds were moving; the operators were not always at the controls to stop the beds in the event of an emergency; there were no emergency stops for the beds other than at the pendant controls; there were caught-in and pinch point hazards along the path of the rolling beds; the undercarriage/wheels and ends of the rolling beds were not guarded; the alarm for signaling the movement of bed #1 was not operational; the operators routinely circumvented the alarms on the rolling beds; the lighting was lacking in the areas of bed travel; safe access to and egress from the rolling beds was not adequate; employees were entering and exiting the beds while they were moving and were permitted to walk on the stress frame (side frame) of the rolling beds. Among other methods, feasible and acceptable abatement methods to correct these hazards include, but are not limited to, the following: *Since rolling beds #1 and 2 are approximately 900 feet long and 830 feet long, respectively, relocate the pendant controls or utilize remote controls to reduce the distance of the line of sight for safe operation. This method addresses struck-by and caught-in hazards. *Ensure that the rolling bed operator is at the operational controls at all times in the event that an emergency stop is required. This method addresses struck-by and caught-in hazards. *Provide spotters that are in direct communication visually or by radio with the operator. This method addresses struck-by and caught-in hazards. *Provide other means for employees to stop the rolling beds in the event of an emergency situation such as light curtains, pressure plates, and/or trip wires. This method addresses struck-by and caught-in hazards. *Remove all caught-in hazards and pinch points along the path of the rolling beds such as columns, equipment, and other obstructions. This method addresses caught-in hazards. *Paint obstructions that could create a caught-in hazard or pinch point along the path of the rolling beds yellow or some other bright color. This method addresses caught-in hazards. *Provide guarding for the undercarriage/wheels and ends of the rolling beds such as barrier guards, light curtains, pressure plates, and/or trip wires. This method addresses struck-by and caught-in hazards. *Repair the inoperative alarm for bed #1 with a unique sound to distinguish it readily from bed #2. This method addresses struck-by and caught-in hazards. *Design the operational controls so that an alarm sounds for a certain period of time prior to bed movement and eliminates the possibility of the operator circumventing the alarm as in the current configuration. This method addresses struck-by and caught-in hazards. *Install a visual indicator which is unique to each bed such as a flashing light or strobe light to indicate when each bed is moving. This method addresses struck-by and caught-in hazards. *Install new or additional lighting in all areas of bed travel. This method addresses struck-by, caught-in, and fall hazards. *Provide and enforce employees working on and around the rolling beds to wear brightly colored reflective vests and/or clothing, such as orange or lime green, so that operators can easily spot them. This method addresses struck-by and caught-in hazards. *Improve methods and install new means of safe access to and egress from the rolling beds. This method addresses struck-by, caught-in, and fall hazards. *Ensure and enforce that the rolling beds have completely stopped before employees are permitted to enter or exit the beds. This method addresses struck-by, caught-in, and fall hazards. *Enforce that employees do not walk on the stress frame (side frame) of the rolling beds unless the fall hazard has been eliminated by installing an adjacent guarded platform at the same height along the sides of the beds. This method addresses fall hazards.s
Recent events (2)
- — I (S) $2800.00
- — Z (S) $7000.00
1910.23 A03
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $7,000 · Current $2,800 Reduced
Recent events (2)
- — I (S) $2800.00
- — Z (S) $7000.00
1910.23 A05
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $3,500 · Current $1,400 Reduced
Recent events (2)
- — I (S) $1400.00
- — Z (S) $3500.00
1910.23 C01
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $7,000 · Current $2,800 Reduced
Recent events (2)
- — I (S) $2800.00
- — Z (S) $7000.00
1910.23 C02
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $7,000 · Current $2,800 Reduced
Recent events (2)
- — I (S) $2800.00
- — Z (S) $7000.00
1910.23 D01 III
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $3,500 · Current $1,400 Reduced
Recent events (2)
- — I (S) $1400.00
- — Z (S) $3500.00
1910.24 B
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $7,000 · Current $2,800 Reduced
Recent events (2)
- — I (S) $2800.00
- — Z (S) $7000.00
1910.26 C01
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,000 · Current $800 Reduced
Recent events (2)
- — I (S) $800.00
- — Z (S) $2000.00
1910.27 D03
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.27 F
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.36 B04
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,000 · Current $800 Reduced
Recent events (2)
- — I (S) $800.00
- — Z (S) $2000.00
1910.36 B07
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,000 · Current $800 Reduced
Recent events (2)
- — I (S) $800.00
- — Z (S) $2000.00
1910.37 J
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,000 · Current $800 Reduced
Recent events (2)
- — I (S) $800.00
- — Z (S) $2000.00
1910.37 K02
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.37 Q01
- Issued
- Oct 5, 2000
- Abate by
- Dec 7, 2000
- Penalty
- Initial $2,000 · Current $800 Reduced
Recent events (2)
- — I (S) $800.00
- — Z (S) $2000.00
1910.37 Q06
- Issued
- Oct 5, 2000
- Abate by
- Dec 7, 2000
Recent events (2)
- — I (S)
- — Z (S)
1910.95 D01
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
81108111
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.95 G01
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
81108111
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.95 I02 I
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $7,000 · Current $2,800 Reduced
8110
Recent events (2)
- — I (S) $2800.00
- — Z (S) $7000.00
1910.95 K01
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
81108111
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.95 L01
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
81108111
Recent events (2)
- — I (S)
- — Z (S)
1910.146 C02
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.146 C04
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $7,000 · Current $2,800 Reduced
Recent events (2)
- — I (S) $2800.00
- — Z (S) $7000.00
1910.147 C04 II
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.147 C05 I
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $7,000 · Current $2,800 Reduced
Recent events (2)
- — I (S) $2800.00
- — Z (S) $7000.00
1910.147 C06 I
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.147 C07 I
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $7,000 · Current $2,800 Reduced
Recent events (2)
- — I (S) $2800.00
- — Z (S) $7000.00
1910.157 G01
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,000 · Current $800 Reduced
Recent events (2)
- — I (S) $800.00
- — Z (S) $2000.00
1910.178 L01 II
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.178 L04 IID
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
Recent events (2)
- — I (S)
- — Z (S)
1910.179 J02
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.179 J03
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
Recent events (2)
- — I (S)
- — Z (S)
5(a)(1)
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to struck-by hazard: a.In the yard, the employer did not conduct and document frequent and periodic inspections on the critical items of the mobile overhead hoists such as hooks, brakes, hoist limit switches, controls and operating mechanisms, and supporting structures for the Mijack 500 B Travelift (S/N: 30N5A350), Drott 500 AI travelift (S/N: 2193), ISL 30 Shuttlelift (S/N: 242.799), and ISL 30 Shuttlelift (S/N: 239.699) and did not correct any unsafe conditions identified, thereby exposing employees to a struck-by hazard. Among other methods, feasible and acceptable abatement methods to correct this hazard include, but are not limited to, the following: *Ensure that a qualified person performs inspections and maintains the safety of the hoisting equipment in accordance with ASME/ANSI B30.16 Overhead Hoists (Underhung). *Ensure that a qualified person performs inspections and maintains the safety of the hoisting equipment in accordance with the manufacturer's information and guidelines. *Contact a competent crane/hoist inspection company to perform the inspections and maintain the safety of the hoisting equipment.s
Recent events (2)
- — I (S)
- — Z (S)
1910.179 L03 III
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.179 N04 I
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.184 C02
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.184 C06
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
Recent events (2)
- — I (S)
- — Z (S)
1910.184 E01
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
Recent events (2)
- — I (S)
- — Z (S)
1910.184 D
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.184 E03 I
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
Recent events (2)
- — I (S)
- — Z (S)
1910.215 A04
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.215 B09
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.219 D01
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.219 E03 I
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.243 C01
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.253 B02 II
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.253 B02 IV
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.253 B04 III
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.303 B02
- Issued
- Oct 5, 2000
- Abate by
- Feb 7, 2001
- Penalty
- Initial $1,500 · Current $600 Reduced
Recent events (2)
- — I (S) $600.00
- — Z (S) $1500.00
1910.303 E
- Issued
- Oct 5, 2000
- Abate by
- Feb 7, 2001
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.303 F
- Issued
- Oct 5, 2000
- Abate by
- Feb 7, 2001
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.304 F04
- Issued
- Oct 5, 2000
- Abate by
- Feb 7, 2001
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.305 A02 I
- Issued
- Oct 5, 2000
- Abate by
- Feb 7, 2001
- Penalty
- Initial $1,500 · Current $600 Reduced
Recent events (2)
- — I (S) $600.00
- — Z (S) $1500.00
1910.305 B01
- Issued
- Oct 5, 2000
- Abate by
- Feb 7, 2001
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.305 B02
- Issued
- Oct 5, 2000
- Abate by
- Feb 7, 2001
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.305 D
- Issued
- Oct 5, 2000
- Abate by
- Feb 7, 2001
- Penalty
- Initial $7,000 · Current $2,800 Reduced
Recent events (2)
- — I (S) $2800.00
- — Z (S) $7000.00
1910.333 A01
- Issued
- Oct 5, 2000
- Abate by
- Feb 7, 2001
Recent events (2)
- — I (S)
- — Z (S)
1910.305 G01 III
- Issued
- Oct 5, 2000
- Abate by
- Feb 7, 2001
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.305 G02 II
- Issued
- Oct 5, 2000
- Abate by
- Feb 7, 2001
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.305 G02 III
- Issued
- Oct 5, 2000
- Abate by
- Feb 7, 2001
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.305 J01 I
- Issued
- Oct 5, 2000
- Abate by
- Feb 7, 2001
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.332 B01
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $7,000 · Current $2,800 Reduced
Recent events (2)
- — I (S) $2800.00
- — Z (S) $7000.00
1910.333 B02 I
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1910.334 A02 I
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $2500.00
1904.2 A
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $1,000 · Current $400 Reduced
Recent events (2)
- — I (O) $400.00
- — Z (O) $1000.00
1904.5 C
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $1,000 · Current $400 Reduced
Recent events (2)
- — I (O) $400.00
- — Z (O) $1000.00
1904.5 D01
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
- Penalty
- Initial $1,000 · Current $400 Reduced
Recent events (2)
- — I (O) $400.00
- — Z (O) $1000.00
1910.22 D01
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
Recent events (2)
- — I (O)
- — Z (O)
1910.132 D02
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
Recent events (2)
- — I (O)
- — Z (O)
1910.132 F04
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
Recent events (2)
- — I (O)
- — Z (O)
1910.134 C02 I
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
Recent events (2)
- — I (O)
- — Z (O)
1910.141 D02 III
- Issued
- Oct 5, 2000
- Abate by
- Oct 15, 2000
Recent events (2)
- — I (O)
- — Z (O)
1910.141 D02 IV
- Issued
- Oct 5, 2000
- Abate by
- Oct 15, 2000
Recent events (2)
- — I (O)
- — Z (O)
1910.1200 F05
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
Recent events (2)
- — I (O)
- — Z (O)
1910.1200 G01
- Issued
- Oct 5, 2000
- Abate by
- Oct 11, 2000
Recent events (2)
- — I (O)
- — Z (O)
1910.1200 H01
- Issued
- Oct 5, 2000
- Abate by
- Nov 7, 2000
Recent events (2)
- — I (O)
- — Z (O)
More inspections at Fabcon, LLC
View Fabcon, LLC's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in OH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 121910913.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.