Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,645Inspections Most recent open 2026-07-16 Last loaded 2026-07-20

OSHA Inspection: LENZ DECORATING

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of LENZ DECORATING in NE STATE & PERRYVILLE RD., ROCKFORD, IL 61107 (NAICS 000000). OSHA activity number 122305915.

Watch Lenz Decorating — free Get an email when a new federal OSHA severe-injury report for Lenz Decorating is published. One employer, no account, unsubscribe in one click.
Establishment
LENZ DECORATING
Site address
NE STATE & PERRYVILLE RD.
City
ROCKFORD
State
IL
ZIP
61107
Mailing
4006 HIGHCREST ROAD, ROCKFORD, IL 61107
Inspection type
Unprogrammed Related (G)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Y
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
1721
Employees
3
Ownership type
A
Industry flags
Construction safety.

5 citations on file for this inspection.

5(a)(1)

Serious Gravity 10 1 instance
Issued
Abate by
Penalty
Initial $2000.00 · Current $800.00 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing or likely to cause death or serious physical harm to
employees in that employees
were exposed to falls from aerial lifts:
Lowes construction site, As controlling employer, did not ensure that
aerial lifts used on the site
were used in accordance with ANSI A92.6 and ANSI A92.5.
a)Employees climbed on midrails to gain additional height on aerial lifts
used by Lenz
Decorating.
b)Aerial lift used by Lenz Decorating did not have safety instructions
from the rental
company or aerial lift manufacturer.
Feasible and acceptable abatement methods include but are not necessary
limited to:
1.Provide directional controls that are clearly marked to the function and
of the type that
return to the off or neutral position.
2.Provide each platform with an appropriate operating/maintenance manual.
3.Provide daily inspection on the aerial lift for cracked welds, hydraulic
leaks, damaged
control cable, loose wire connection, and tire damage. Inspect control
daily for proper
operation.
4.All modifications and alterations to work platforms shall be certified
in writing by the
manufacturer or by equivalent entity.
5.Provide fall arrest when employee must gain additional height on aerial
lifts.
6.Provide operator training in the manufacturer's instruction and safety
rules.
Recent events (2)
  • — F (S) $800.00
  • — Z (S) $2000.00

1926.20 B01

Serious Gravity 03 3 instances
Issued
Abate by
Penalty
Initial $1000.00 · Current $400.00 Reduced
Recent events (2)
  • — F (S) $400.00
  • — Z (S) $1000.00

1926.20 B02

Serious Gravity 03 1 instance
Issued
Abate by
Recent events (2)
  • — F (S)
  • — Z (S)

1926.21 B02

Serious Gravity 03 3 instances
Issued
Abate by
Penalty
Initial $1000.00 · Current $400.00 Reduced
Recent events (2)
  • — F (S) $400.00
  • — Z (S) $1000.00

1926.95 C

Serious Gravity 10 1 instance
Issued
Abate by
Penalty
Initial $2000.00 · Current $800.00 Reduced
Recent events (2)
  • — F (S) $800.00
  • — Z (S) $2000.00

KGC, INC.

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 122305915.