Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,193,745Inspections Most recent open 2026-08-06 Last loaded 2026-08-10

OSHA Inspection: BECKER ELECTRICAL GROUP, INC.

Unprogrammed Related inspection · Health discipline

On , OSHA opened an unprogrammed Related health inspection of BECKER ELECTRICAL GROUP, INC. in 10901 38TH STREET, KENOSHA, WI 53144 (NAICS 238210). OSHA activity number 122395692.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Becker Electrical Group, INC. for free Get an email when a new federal OSHA severe-injury report for Becker Electrical Group, INC. is published. One employer, no account, unsubscribe in one click.
Site address
10901 38TH STREET
City
KENOSHA
State
WI
ZIP
53144
Mailing
4210 43RD AVENUE, KENOSHA, WI 53142
Inspection type
Unprogrammed Related (G)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
Y
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238210
SIC code (legacy)
1731
Employees
17
Ownership type
A

1 citation on file for this inspection.

5(a)(1)

Other-than-serious Gravity 05 1 instance 1 exposed
Issued
Mar 11, 2009
Abate by
Mar 17, 2009
Penalty
Initial $1,925

Hazardous substances 0560

29 CFR 1926.154(a)(1):  The employer shall supply fresh air in sufficient
quantities to maintain
the health and safety of workers:
(a)The building under construction was being heated by temporary heating
devices
that produce carbon monoxide.  Other sources of carbon monoxide include
trucks
concrete finishers, powered lifts and other fuel powered equipment.  A
fresh air
supply was not ensured in that carbon monoxide levels monitored exceeded 50
parts per million (ppm) throughout work areas of the building.
Certification, with date and method of abatement required.
Certification of abatement is required by 29 CFR Part 1903 and is to be
submitted within ten (10)
calendar days after the abatement date.ment
Recent events (2)
  • · I (O)
  • · Z (S) $1925.00

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 122395692.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.