BRISTOL, CT —
OSHA Inspection: BARDON TOOL AND MANUFACTURING COMPANY, INC.
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of BARDON TOOL AND MANUFACTURING COMPANY, INC. in 409 LAKE AVENUE, BRISTOL, CT 06010 (NAICS 000000). OSHA activity number 123210924.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- BARDON TOOL AND MANUFACTURING COMPANY, INC.
- Site address
- 409 LAKE AVENUE
- City
- BRISTOL
- State
- CT
- ZIP
- 06010
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3541
- Employees
- 60
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
10 citations on file for this inspection.
1910.106 E02 IVD
- Issued
- Mar 14, 1994
- Abate by
- Mar 17, 1994
- Penalty
- Initial $1,500 · Current $615 Reduced
Recent events (2)
- — I (S) $615.00
- — Z (S) $1500.00
1910.212 A01
- Issued
- Mar 14, 1994
- Abate by
- Apr 28, 1994
- Penalty
- Initial $1,125 · Current $460 Reduced
Recent events (2)
- — I (S) $460.00
- — Z (S) $1125.00
1910.219 E01 I
- Issued
- Mar 14, 1994
- Abate by
- Apr 28, 1994
- Penalty
- Initial $1,125 · Current $460 Reduced
Recent events (2)
- — I (S) $460.00
- — Z (S) $1125.00
1910.219 E03 I
- Issued
- Mar 14, 1994
- Abate by
- Apr 28, 1994
1910.1200 E01
- Issued
- Mar 14, 1994
- Abate by
- Apr 28, 1994
- Penalty
- Initial $1,125 · Current $460 Reduced
Recent events (2)
- — I (S) $460.00
- — Z (S) $1125.00
1910.1200 H
- Issued
- Mar 14, 1994
- Abate by
- Apr 28, 1994
1910.37 Q02
- Issued
- Mar 14, 1994
- Abate by
- Mar 31, 1994
- Penalty
- Initial $750 · Current $310 Reduced
Recent events (2)
- — I (O) $310.00
- — Z (O) $750.00
1910.151 C
- Issued
- Mar 14, 1994
- Abate by
- Apr 28, 1994
- Penalty
- Initial $750 · Current $320 Reduced
Recent events (2)
- — I (O) $320.00
- — Z (O) $750.00
1910.157 C04
- Issued
- Mar 14, 1994
- Abate by
- Mar 31, 1994
1910.305 G01 III
- Issued
- Mar 14, 1994
- Abate by
- Apr 28, 1994
More inspections at Bardon Tool and Manufacturing Company, INC.
View Bardon Tool and Manufacturing Company, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in CT
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 123210924.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.