CHESHIRE, CT ·
OSHA Inspection: STEPHEN MINE CONTRACTING
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of STEPHEN MINE CONTRACTING in 175 MAIN STREET, CHESHIRE, CT 06410 (NAICS 000000). OSHA activity number 123294373.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- STEPHEN MINE CONTRACTING
- Site address
- 175 MAIN STREET
- City
- CHESHIRE
- State
- CT
- ZIP
- 06410
- Mailing
- PO BOX 310, TERRYVILLE, CT 06786
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 1542
- Employees
- 4
- Ownership type
- A
Citations
1 citation on file for this inspection.
5(a)(1)
- Issued
- Sep 15, 1997
- Abate by
- Sep 18, 1997
- Penalty
- Initial $375 · Current $375
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to a collapsing roof of the center structure of a three structure modular class room unit. Worksite: St. Bridget's Church, 175 Main Street, Cheshire Ct: On or about 27 August 1997, during the assembly of a three section modular classroom building, the roof structure of the center modular unit collapsed onto a construction worker. The temporary bracing used to stabilize the structure was removed before the modular section could be anchored to the adjacent modular section. A feasible method of abatement existed if the employer had maintained the temporary braces in place until such time as the modular unit was supported to the adjacent modular section.
More inspections in this industry (NAICS 000000)
More inspections in CT
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 123294373.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.