Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,194,531Inspections Most recent open 2026-08-11 Last loaded 2026-08-14

OSHA Inspection: STEPHEN MINE CONTRACTING

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of STEPHEN MINE CONTRACTING in 175 MAIN STREET, CHESHIRE, CT 06410 (NAICS 000000). OSHA activity number 123294373.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Stephen Mine Contracting for free Get an email when a new federal OSHA severe-injury report for Stephen Mine Contracting is published. One employer, no account, unsubscribe in one click.
Site address
175 MAIN STREET
City
CHESHIRE
State
CT
ZIP
06410
Mailing
PO BOX 310, TERRYVILLE, CT 06786
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
1542
Employees
4
Ownership type
A

1 citation on file for this inspection.

5(a)(1)

Serious Gravity 03 1 instance 3 exposed
Issued
Sep 15, 1997
Abate by
Sep 18, 1997
Penalty
Initial $375 · Current $375
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing or likely to cause death or serious physical harm to
employees in that employees
were exposed to a collapsing roof of the center structure of a three
structure modular class room
unit.
Worksite: St. Bridget's Church, 175 Main Street, Cheshire Ct: On or about
27 August 1997,
during the assembly of a three section modular classroom building, the
roof structure of the
center modular unit collapsed onto a construction worker.  The temporary
bracing used to
stabilize the structure was removed before the modular section could be
anchored to the adjacent
modular section.
A feasible method of abatement existed if the employer had maintained the
temporary braces in
place until such time as the modular unit was supported to the adjacent
modular
section.

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 123294373.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.