BRIDGEPORT, CT ·
OSHA Inspection: BUSHWICK IRON & STEEL CO., INC.
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of BUSHWICK IRON & STEEL CO., INC. in 560 NORTH WASHINGTON AVENUE, BRIDGEPORT, CT 06604 (NAICS 000000). OSHA activity number 123297970.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- BUSHWICK IRON & STEEL CO., INC.
- Site address
- 560 NORTH WASHINGTON AVENUE
- City
- BRIDGEPORT
- State
- CT
- ZIP
- 06604
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Union (Y)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3325
- Employees
- 50
- Ownership type
- Private (A)
- Industry flags
- Manufacturing safety.
Citations
41 citations on file for this inspection.
5(a)(1)
- Issued
- Dec 8, 1998
- Abate by
- Jan 10, 1999
- Penalty
- Initial $3,500 · Current $2,000 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to possible load failure from a lack of inspections: ESTABLISHMENT: In the following instances, workers who are allowed to operate the overhead hoists located throughout the facility, are exposed to injury from load failure while operating hoists which have not had a complete periodic inspection in several years. These included but are not limited to: Bay 2 (Torch Bay) a)Ingersoll Rand 1/2 TON Monorail Hoist SN: Q50-20412. BAY 4 b)Burlington 1/2 TON Hoist, SN: 490X. c)Dwight Foote 3 TON Hoist, SN: 798. Amongst others, one feasible method of abatement would be to set-up and conduct periodic inspections based on the requirements set forth in the ASME/ANSI Overhead Hoists (Underhung), Number B30.16.
Recent events (2)
- · I (S) $2000.00
- · Z (S) $3500.00
5(a)(1)
- Issued
- Dec 8, 1998
- Abate by
- Jan 10, 1999
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to possible load failure from a lack of inspections: ESTABLISHMENT: In the following instance, workers who are allowed to operate hoists are exposed to injury from load failure while operating the hoists which have not had frequent (daily to weekly) visual inspections for any defects or damage that might occur between periodic inspections, during the several years since the company has moved to the Bridgeport, Ct. facility. Bay 4 a) Burlington 1/2 TON Hoist SN: 490X. The running rope was observed to have seven (7) broken outer wires in one strand, of one rope lay. Amongst others, one feasible method of abatement would be to set-up and conduct frequent visual inspections based on the requirements set forth in the ASME/ANSI Overhead Hoists (Underhung), Number B30.16.
Recent events (2)
- · I (S)
- · Z (S)
1910.22 B02
- Issued
- Dec 8, 1998
- Abate by
- Feb 10, 1999
- Penalty
- Initial $1,250 · Current $600 Reduced
Recent events (2)
- · I (S) $600.00
- · Z (S) $1250.00
1910.36 B04
- Issued
- Dec 8, 1998
- Abate by
- Dec 11, 1998
- Penalty
- Initial $1,750 · Current $900 Reduced
Recent events (2)
- · I (S) $900.00
- · Z (S) $1750.00
1910.37 J
- Issued
- Dec 8, 1998
- Abate by
- Dec 11, 1998
Recent events (2)
- · I (S)
- · Z (S)
1910.37 Q02
- Issued
- Dec 8, 1998
- Abate by
- Dec 16, 1998
- Penalty
- Initial $750 · Current $400 Reduced
Recent events (2)
- · I (S) $400.00
- · Z (S) $750.00
1910.132 D02
- Issued
- Dec 8, 1998
- Abate by
- Jan 10, 1999
- Penalty
- Initial $1,750 · Current $800 Reduced
Recent events (2)
- · I (S) $800.00
- · Z (S) $1750.00
1910.133 A01
- Issued
- Dec 8, 1998
- Abate by
- Dec 16, 1998
Recent events (2)
- · I (S)
- · Z (S)
1910.135 A01
- Issued
- Dec 8, 1998
- Abate by
- Dec 16, 1998
Recent events (2)
- · I (S)
- · Z (S)
1910.141 A03 I
- Issued
- Dec 8, 1998
- Abate by
- Dec 25, 1998
- Penalty
- Initial $750 · Current $200 Reduced
Recent events (2)
- · I (S) $200.00
- · Z (S) $750.00
1910.147 C04 I
- Issued
- Dec 8, 1998
- Abate by
- Jan 10, 1999
- Penalty
- Initial $2,500 · Current $1,500 Reduced
Recent events (2)
- · I (S) $1500.00
- · Z (S) $2500.00
1910.147 C05 I
- Issued
- Dec 8, 1998
- Abate by
- Feb 10, 1999
Recent events (2)
- · I (S)
- · Z (S)
1910.147 C07 I
- Issued
- Dec 8, 1998
- Abate by
- Feb 10, 1999
- Penalty
- Initial $2,500 · Current $1,500 Reduced
Recent events (2)
- · I (S) $1500.00
- · Z (S) $2500.00
1910.176 B
- Issued
- Dec 8, 1998
- Abate by
- Jan 10, 1999
- Penalty
- Initial $1,250 · Current $600 Reduced
Recent events (2)
- · I (S) $600.00
- · Z (S) $1250.00
1910.178 L
- Issued
- Dec 8, 1998
- Abate by
- Feb 10, 1999
- Penalty
- Initial $1,750 · Current $800 Reduced
Recent events (2)
- · I (S) $800.00
- · Z (S) $1750.00
1910.179 E01 I
- Issued
- Dec 8, 1998
- Abate by
- Mar 15, 1999
- Penalty
- Initial $3,500 · Current $2,000 Reduced
Recent events (2)
- · I (S) $2000.00
- · Z (S) $3500.00
1910.179 E02 I
- Issued
- Dec 8, 1998
- Abate by
- Mar 15, 1999
Recent events (2)
- · I (S)
- · Z (S)
1910.179 H01 I
- Issued
- Dec 8, 1998
- Abate by
- Mar 15, 1999
- Penalty
- Initial $3,500 · Current $2,000 Reduced
Recent events (2)
- · I (S) $2000.00
- · Z (S) $3500.00
1910.179 H02 IIIA
- Issued
- Dec 8, 1998
- Abate by
- Jan 24, 1999
- Penalty
- Initial $3,500 · Current $2,000 Reduced
Recent events (2)
- · I (S) $2000.00
- · Z (S) $3500.00
1910.179 J01 I
- Issued
- Dec 8, 1998
- Abate by
- Jan 10, 1999
- Penalty
- Initial $3,500 · Current $2,000 Reduced
Recent events (2)
- · I (S) $2000.00
- · Z (S) $3500.00
1910.179 J02
- Issued
- Dec 8, 1998
- Abate by
- Jan 10, 1999
Recent events (2)
- · I (S)
- · Z (S)
1910.179 J03
- Issued
- Dec 8, 1998
- Abate by
- Jan 10, 1999
Recent events (2)
- · I (S)
- · Z (S)
1910.212 A01
- Issued
- Dec 8, 1998
- Abate by
- Dec 25, 1998
- Penalty
- Initial $1,000 · Current $500 Reduced
Recent events (2)
- · I (S) $500.00
- · Z (S) $1000.00
1910.212 A03 II
- Issued
- Dec 8, 1998
- Abate by
- Jan 10, 1999
- Penalty
- Initial $750 · Current $375 Reduced
Recent events (2)
- · I (S) $375.00
- · Z (S) $750.00
1910.213 H01
- Issued
- Dec 8, 1998
- Abate by
- Jan 31, 1999
- Penalty
- Initial $1,000 · Current $500 Reduced
Recent events (2)
- · I (S) $500.00
- · Z (S) $1000.00
1910.219 D01
- Issued
- Dec 8, 1998
- Abate by
- Dec 11, 1998
- Penalty
- Initial $750 · Current $375 Reduced
Recent events (2)
- · I (S) $375.00
- · Z (S) $750.00
1910.219 E01 I
- Issued
- Dec 8, 1998
- Abate by
- Dec 11, 1998
Recent events (2)
- · I (S)
- · Z (S)
1910.303 B02
- Issued
- Dec 8, 1998
- Abate by
- Dec 11, 1998
- Penalty
- Initial $750 · Current $375 Reduced
Recent events (2)
- · I (S) $375.00
- · Z (S) $750.00
1910.303 F
- Issued
- Dec 8, 1998
- Abate by
- Jan 10, 1999
- Penalty
- Initial $750 · Current $375 Reduced
Recent events (2)
- · I (S) $375.00
- · Z (S) $750.00
1910.303 G01 I
- Issued
- Dec 8, 1998
- Abate by
- Feb 10, 1999
- Penalty
- Initial $1,250 · Current $625 Reduced
Recent events (2)
- · I (S) $625.00
- · Z (S) $1250.00
1910.303 G02 I
- Issued
- Dec 8, 1998
- Abate by
- Dec 25, 1998
- Penalty
- Initial $1,750 · Current $875 Reduced
Recent events (2)
- · I (S) $875.00
- · Z (S) $1750.00
1910.304 F04
- Issued
- Dec 8, 1998
- Abate by
- Dec 11, 1998
Recent events (2)
- · I (S)
- · Z (S)
1910.305 A01 I
- Issued
- Dec 8, 1998
- Abate by
- Jan 10, 1999
- Penalty
- Initial $750 · Current $375 Reduced
Recent events (2)
- · I (S) $375.00
- · Z (S) $750.00
1910.305 G01 III
- Issued
- Dec 8, 1998
- Abate by
- Dec 11, 1998
- Penalty
- Initial $750 · Current $375 Reduced
Recent events (2)
- · I (S) $375.00
- · Z (S) $750.00
1910.1200 E01
- Issued
- Dec 8, 1998
- Abate by
- Jan 10, 1999
- Penalty
- Initial $750 · Current $375 Reduced
Recent events (2)
- · I (S) $375.00
- · Z (S) $750.00
1910.1200 G01
- Issued
- Dec 8, 1998
- Abate by
- Jan 10, 1999
Recent events (2)
- · I (S)
- · Z (S)
1910.1200 H
- Issued
- Dec 8, 1998
- Abate by
- Jan 10, 1999
- Penalty
- Initial $750 · Current $375 Reduced
Recent events (2)
- · I (S) $375.00
- · Z (S) $750.00
1904.2 A
- Issued
- Dec 4, 1998
- Abate by
- Jan 6, 1999
- Penalty
- Initial $500 · Current $100 Reduced
Recent events (2)
- · I (O) $100.00
- · Z (O) $500.00
1904.2 B01
- Issued
- Dec 4, 1998
- Abate by
- Jan 6, 1999
- Penalty
- Initial $500 · Current $100 Reduced
Recent events (2)
- · I (O) $100.00
- · Z (O) $500.00
1904.5 C
- Issued
- Dec 4, 1998
- Abate by
- Jan 6, 1999
- Penalty
- Initial $500 · Current $100 Reduced
Recent events (2)
- · I (O) $100.00
- · Z (O) $500.00
1910.179 G01 V
- Issued
- Dec 4, 1998
- Abate by
- Dec 12, 1998
Recent events (2)
- · I (O)
- · Z (O)
More inspections in this industry (NAICS 000000)
More inspections in CT
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 123297970.