OSHA Inspection: CHROMA TECHNOLOGY CORP.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of CHROMA TECHNOLOGY CORP. in 72 COTTON MILL HILL, BRATTLEBORO, VT 05301 (NAICS 000000). OSHA activity number 124434010.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Chroma Technology Corp. — free Get an email when a new federal OSHA severe-injury report for Chroma Technology Corp. is published. One employer, no account, unsubscribe in one click.
Site address
72 COTTON MILL HILL
City
BRATTLEBORO
State
VT
ZIP
05301
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
3229
Employees
22
Ownership type
A
Industry flags
Manufacturing safety.

23 citations on file for this inspection.

1910.23 C01

Serious Gravity 02 1 instance 10 exposed
Issued
Mar 20, 1996
Abate by
Apr 12, 1996
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • — A (S) $300.00
  • — Z (S) $600.00

1910.24 H

Serious Gravity 01 1 instance 10 exposed
Issued
Mar 20, 1996
Abate by
Apr 12, 1996
Penalty
Initial $450 · Current $225 Reduced
Recent events (2)
  • — A (S) $225.00
  • — Z (S) $450.00

1910.145 C03

Other-than-serious Gravity 01 1 instance 22 exposed
Issued
Mar 20, 1996
Abate by
Apr 2, 1996
Penalty
Initial $450
Recent events (2)
  • — A (O)
  • — Z (S) $450.00

1910.147 C01

Serious Gravity 05 1 instance 22 exposed
Issued
Mar 20, 1996
Abate by
Aug 15, 1996
Penalty
Initial $1,050 · Current $500 Reduced
Recent events (3)
  • — A (S) $500.00
  • — P (S) $1050.00
  • — Z (S) $1050.00

1910.157 E02

Serious Gravity 01 6 instances 22 exposed
Issued
Mar 20, 1996
Abate by
Apr 2, 1996
Penalty
Initial $450 · Current $225 Reduced
Recent events (2)
  • — A (S) $225.00
  • — Z (S) $450.00

1910.157 G01

Serious Gravity 01 1 instance 22 exposed
Issued
Mar 20, 1996
Abate by
May 15, 1996
Recent events (2)
  • — P (S)
  • — Z (S)

1910.212 A05

Serious Gravity 03 1 instance 5 exposed
Issued
Mar 20, 1996
Abate by
Apr 12, 1996
Penalty
Initial $750 · Current $100 Reduced
Recent events (2)
  • — A (S) $100.00
  • — Z (S) $750.00

1910.219 D01

Serious Gravity 01 2 instances 5 exposed
Issued
Mar 20, 1996
Abate by
May 15, 1996
Penalty
Initial $450 · Current $225 Reduced
Recent events (3)
  • — A (S) $225.00
  • — P (S) $450.00
  • — Z (S) $450.00

1910.219 E01 I

Serious Gravity 01 4 instances 5 exposed
Issued
Mar 20, 1996
Abate by
May 15, 1996
Recent events (2)
  • — P (S)
  • — Z (S)

1910.303 C

Serious Gravity 01 1 instance 4 exposed
Issued
Mar 20, 1996
Abate by
Apr 15, 1996
Penalty
Initial $450 · Current $250 Reduced
Recent events (3)
  • — A (S) $250.00
  • — P (S) $450.00
  • — Z (S) $450.00

1910.304 F04

Serious Gravity 01 1 instance 5 exposed
Issued
Mar 20, 1996
Abate by
Mar 28, 1996

1910.304 F05 V

Serious Gravity 01 2 instances 14 exposed
Issued
Mar 20, 1996
Abate by
Apr 15, 1996
Recent events (2)
  • — P (S)
  • — Z (S)

1910.305 B01

Serious Gravity 01 6 instances 15 exposed
Issued
Mar 20, 1996
Abate by
Apr 2, 1996

1910.305 B02

Serious Gravity 01 2 instances 5 exposed
Issued
Mar 20, 1996
Abate by
Mar 28, 1996

1910.305 G02 III

Serious Gravity 01 1 instance 5 exposed
Issued
Mar 20, 1996
Abate by
Mar 28, 1996

1910.1200 E01

Other-than-serious Gravity 05 1 instance 22 exposed
Issued
Mar 20, 1996
Abate by
Aug 15, 1996
Penalty
Initial $1,050
Recent events (3)
  • — A (O)
  • — P (S) $1050.00
  • — Z (S) $1050.00

1910.1200 F05 II

Other-than-serious Gravity 04 5 instances 22 exposed
Issued
Mar 20, 1996
Abate by
Aug 15, 1996
Recent events (3)
  • — A (O)
  • — P (S)
  • — Z (S)

1910.1200 H

Other-than-serious Gravity 05 1 instance 22 exposed
Issued
Mar 20, 1996
Abate by
Aug 15, 1996
Recent events (3)
  • — A (O)
  • — P (S)
  • — Z (S)

1904.2 B02

Other-than-serious Gravity 01 1 instance 22 exposed
Issued
Mar 20, 1996
Abate by
Apr 2, 1996
Penalty
Initial $300
Recent events (2)
  • — A (O)
  • — Z (O) $300.00

1904.5 A

Other-than-serious Gravity 01 1 instance 22 exposed
Issued
Mar 20, 1996
Abate by
Apr 12, 1996

1910.37 Q02

Other-than-serious Gravity 01 1 instance 5 exposed
Issued
Mar 20, 1996
Abate by
Apr 2, 1996

1910.37 Q06

Other-than-serious Gravity 01 1 instance 22 exposed
Issued
Mar 20, 1996
Abate by
Mar 28, 1996

1910.212 B

Other-than-serious Gravity 01 1 instance 6 exposed
Issued
Mar 20, 1996
Abate by
Apr 2, 1996

View Chroma Technology Corp.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 124434010.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.