Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: AEROFAB CO INC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of AEROFAB CO INC in 2335 GOODRICH ST, FERNDALE, MI 48220 (NAICS 000000). OSHA activity number 125031567.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Aerofab CO INC — free Get an email when a new federal OSHA severe-injury report for Aerofab CO INC is published. One employer, no account, unsubscribe in one click.
Establishment
AEROFAB CO INC
Site address
2335 GOODRICH ST
City
FERNDALE
State
MI
ZIP
48220
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
000000
SIC code (legacy)
2241
Employees
40
Ownership type
A
Industry flags
Manufacturing safety.

23 citations on file for this inspection.

4081003410

Serious Gravity 00 1 instance 2 exposed
Issued
Aug 6, 1997
Abate by
Sep 12, 1997
Penalty
Initial $750 · Current $375 Reduced
Recent events (2)
  • — I (S) $375.00
  • — Z (S) $750.00

4081018701

Serious Gravity 00 8 instances 3 exposed
Issued
Aug 6, 1997
Abate by
Sep 12, 1997
Penalty
Initial $750 · Current $375 Reduced
Recent events (2)
  • — I (S) $375.00
  • — Z (S) $750.00

4081072701

Serious Gravity 00 3 instances 8 exposed
Issued
Aug 6, 1997
Abate by
Sep 12, 1997
Penalty
Initial $1,000 · Current $500 Reduced
Recent events (2)
  • — I (S) $500.00
  • — Z (S) $1000.00

40810716

Serious Gravity 00 5 instances 13 exposed
Issued
Aug 6, 1997
Abate by
Sep 12, 1997
Penalty
Initial $750 · Current $375 Reduced
Recent events (2)
  • — I (S) $375.00
  • — Z (S) $750.00

40810712

Serious Gravity 00 1 instance 5 exposed
Issued
Aug 6, 1997
Abate by
Sep 12, 1997
Penalty
Initial $750 · Current $375 Reduced
Recent events (2)
  • — I (S) $375.00
  • — Z (S) $750.00

4081111501

Serious Gravity 00 1 instance 1 exposed
Issued
Aug 6, 1997
Abate by
Sep 12, 1997
Penalty
Initial $750 · Current $375 Reduced
Recent events (2)
  • — I (S) $375.00
  • — Z (S) $750.00

4081215401

Serious Gravity 00 1 instance 2 exposed
Issued
Aug 6, 1997
Abate by
Sep 12, 1997
Penalty
Initial $750 · Current $375 Reduced
Recent events (2)
  • — I (S) $375.00
  • — Z (S) $750.00

4081264201

Serious Gravity 00 1 instance 1 exposed
Issued
Aug 6, 1997
Abate by
Oct 24, 1997
Penalty
Initial $750 · Current $375 Reduced
Recent events (3)
  • — P (S) $375.00
  • — I (S) $375.00
  • — Z (S) $750.00

4081273201

Serious Gravity 00 1 instance 2 exposed
Issued
Aug 6, 1997
Abate by
Sep 12, 1997
Penalty
Initial $750 · Current $375 Reduced
Recent events (2)
  • — I (S) $375.00
  • — Z (S) $750.00

4081331201

Serious Gravity 00 5 instances 6 exposed
Issued
Aug 6, 1997
Abate by
Sep 12, 1997
Penalty
Initial $1,000 · Current $500 Reduced
Recent events (2)
  • — I (S) $500.00
  • — Z (S) $1000.00

4081339201

Serious Gravity 00 2 instances 5 exposed
Issued
Aug 6, 1997
Abate by
Oct 24, 1997
Penalty
Initial $750 · Current $375 Reduced
Recent events (3)
  • — P (S) $375.00
  • — I (S) $375.00
  • — Z (S) $750.00

4081339401

Serious Gravity 00 1 instance 2 exposed
Issued
Aug 6, 1997
Abate by
Oct 24, 1997
Penalty
Initial $750 · Current $375 Reduced
Recent events (3)
  • — P (S) $375.00
  • — I (S) $375.00
  • — Z (S) $750.00

1910.303 G02 I

Serious Gravity 00 2 instances 3 exposed
Issued
Aug 6, 1997
Abate by
Sep 12, 1997
Penalty
Initial $750 · Current $375 Reduced
Recent events (2)
  • — I (S) $375.00
  • — Z (S) $750.00

1910.1200 E01

Serious Gravity 00 3 instances 20 exposed
Issued
Aug 6, 1997
Abate by
Sep 12, 1997
Penalty
Initial $750 · Current $375 Reduced
Recent events (2)
  • — I (S) $375.00
  • — Z (S) $750.00

4081003601

Other-than-serious Gravity 00 1 instance 7 exposed
Issued
Aug 6, 1997
Abate by
Sep 12, 1997

4081330801

Other-than-serious Gravity 00 1 instance 20 exposed
Issued
Aug 6, 1997
Abate by
Sep 12, 1997

4081400707

Other-than-serious Gravity 00 2 instances 1 exposed
Issued
Aug 6, 1997
Abate by
Sep 12, 1997

4081652702

Other-than-serious Gravity 00 1 instance 1 exposed
Issued
Aug 6, 1997
Abate by
Sep 12, 1997

1910.147 C07 IV

Other-than-serious Gravity 00 1 instance 3 exposed
Issued
Aug 6, 1997
Abate by
Sep 12, 1997

1910.147 C04 I

Other-than-serious Gravity 00 1 instance 3 exposed
Issued
Aug 6, 1997
Abate by
Sep 12, 1997

1910.106 E02 II

Other-than-serious Gravity 00 1 instance 3 exposed
Issued
Aug 6, 1997
Abate by
Sep 12, 1997

1910.106 E06 I

Other-than-serious Gravity 00 1 instance 3 exposed
Issued
Aug 6, 1997
Abate by
Sep 12, 1997

1910.106 E06 II

Other-than-serious Gravity 00 1 instance 3 exposed
Issued
Aug 6, 1997
Abate by
Sep 12, 1997

View Aerofab CO INC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 125031567.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.