FERGUS FALLS, MN —
OSHA Inspection: SHOREMASTER, INC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of SHOREMASTER, INC in 1 SHOREMASTER DRIVE, FERGUS FALLS, MN 56538 (NAICS 000000). OSHA activity number 126589480.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- SHOREMASTER, INC
- Site address
- 1 SHOREMASTER DRIVE
- City
- FERGUS FALLS
- State
- MN
- ZIP
- 56538
- Mailing
- P O BOX 358, 1 SHOREMASTER DRIVE, FERGUS FALLS, MN 56538
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3448
- Employees
- 74
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
29 citations on file for this inspection.
182065302
- Issued
- Mar 30, 1998
- Abate by
- Apr 3, 1998
- Penalty
- Initial $800 · Current $280 Reduced
General-duty citation text
Minn. Stat. 182.653 subd. 2: The employer did not furnish to each employee, conditions of employment and a place of employment free from recognized hazards which caused or were likely to cause death or serious injury to employees: The work platform used on the forks of a forklift to elevate employees, which was available for use at the main building storage area, did not have a means to secure the platform to the forklift mast on the right side and the left side had a chain that was not securely attached in a manner that would prevent it from being torn loose from the platform. The platform could be displaced from the forks allowing it to fall to the ground with the employee aboard.e
Recent events (2)
- — F (S) $280.00
- — Z (S) $800.00
1910.37 Q01
- Issued
- Mar 30, 1998
- Abate by
- Apr 16, 1998
- Penalty
- Initial $600 · Current $210 Reduced
Recent events (2)
- — F (S) $210.00
- — Z (S) $600.00
1910.110 B16
- Issued
- Mar 30, 1998
- Abate by
- Apr 27, 1998
- Penalty
- Initial $600 · Current $210 Reduced
Recent events (2)
- — F (S) $210.00
- — Z (S) $600.00
1910.110 E04 III
- Issued
- Mar 30, 1998
- Abate by
- Apr 3, 1998
- Penalty
- Initial $600 · Current $210 Reduced
Recent events (2)
- — F (S) $210.00
- — Z (S) $600.00
1910.110 E07 II
- Issued
- Mar 30, 1998
- Abate by
- Apr 9, 1998
- Penalty
- Initial $600 · Current $210 Reduced
Recent events (2)
- — F (S) $210.00
- — Z (S) $600.00
1910.133 A01
- Issued
- Mar 30, 1998
- Abate by
- Apr 27, 1998
- Penalty
- Initial $600 · Current $210 Reduced
Recent events (2)
- — F (S) $210.00
- — Z (S) $600.00
1910.178 P01
- Issued
- Mar 30, 1998
- Abate by
- Apr 3, 1998
- Penalty
- Initial $600 · Current $210 Reduced
Recent events (2)
- — F (S) $210.00
- — Z (S) $600.00
1910.212 A01
- Issued
- Mar 30, 1998
- Abate by
- Apr 27, 1998
- Penalty
- Initial $1,600 · Current $460 Reduced
Recent events (2)
- — F (S) $460.00
- — Z (S) $1600.00
1910.212 B
- Issued
- Mar 30, 1998
- Abate by
- Apr 16, 1998
- Penalty
- Initial $600 · Current $210 Reduced
Recent events (2)
- — F (S) $210.00
- — Z (S) $600.00
1910.213 B03
- Issued
- Mar 30, 1998
- Abate by
- Apr 16, 1998
- Penalty
- Initial $800 · Current $280 Reduced
Recent events (2)
- — F (S) $280.00
- — Z (S) $800.00
1910.217 C01 I
- Issued
- Mar 30, 1998
- Abate by
- Apr 3, 1998
- Penalty
- Initial $1,600 · Current $462 Reduced
Recent events (2)
- — F (S) $462.00
- — Z (S) $1600.00
1910.217 D09 II
- Issued
- Mar 30, 1998
- Abate by
- Apr 9, 1998
- Penalty
- Initial $600 · Current $210 Reduced
Recent events (2)
- — F (S) $210.00
- — Z (S) $600.00
1910.217 E01 I
- Issued
- Mar 30, 1998
- Abate by
- Apr 9, 1998
- Penalty
- Initial $800 · Current $280 Reduced
Recent events (2)
- — F (S) $280.00
- — Z (S) $800.00
1910.217 E03
- Issued
- Mar 30, 1998
- Abate by
- Apr 27, 1998
- Penalty
- Initial $800 · Current $280 Reduced
Recent events (2)
- — F (S) $280.00
- — Z (S) $800.00
1910.219 C02 I
- Issued
- Mar 30, 1998
- Abate by
- Apr 16, 1998
- Penalty
- Initial $800 · Current $280 Reduced
Recent events (2)
- — F (S) $280.00
- — Z (S) $800.00
1910.219 C04 I
- Issued
- Mar 30, 1998
- Abate by
- Apr 16, 1998
- Penalty
- Initial $800 · Current $280 Reduced
Recent events (2)
- — F (S) $280.00
- — Z (S) $800.00
1910.219 D01
- Issued
- Mar 30, 1998
- Abate by
- Apr 16, 1998
- Penalty
- Initial $600 · Current $210 Reduced
Recent events (2)
- — F (S) $210.00
- — Z (S) $600.00
1910.254 A03
- Issued
- Mar 30, 1998
- Abate by
- Jun 1, 1998
- Penalty
- Initial $1,200 · Current $420 Reduced
Recent events (2)
- — F (S) $420.00
- — Z (S) $1200.00
1910.303 B01 I
- Issued
- Mar 30, 1998
- Abate by
- Apr 9, 1998
- Penalty
- Initial $600 · Current $210 Reduced
Recent events (2)
- — F (S) $210.00
- — Z (S) $600.00
1910.303 G02 I
- Issued
- Mar 30, 1998
- Abate by
- Apr 3, 1998
- Penalty
- Initial $800 · Current $280 Reduced
Recent events (2)
- — F (S) $280.00
- — Z (S) $800.00
1910.304 F05 V
- Issued
- Mar 30, 1998
- Abate by
- Apr 3, 1998
- Penalty
- Initial $1,200 · Current $420 Reduced
Recent events (2)
- — F (S) $420.00
- — Z (S) $1200.00
5205011601
- Issued
- Mar 30, 1998
- Abate by
- Apr 27, 1998
- Penalty
- Initial $800 · Current $280 Reduced
Recent events (2)
- — F (S) $280.00
- — Z (S) $800.00
5205067502
- Issued
- Mar 30, 1998
- Abate by
- Apr 9, 1998
- Penalty
- Initial $800 · Current $280 Reduced
Recent events (2)
- — F (S) $280.00
- — Z (S) $800.00
1910.22 A01
- Issued
- Mar 30, 1998
- Abate by
- Apr 27, 1998
- Penalty
- Initial $200 · Current $70 Reduced
Recent events (2)
- — F (O) $70.00
- — Z (O) $200.00
1910.303 F
- Issued
- Mar 30, 1998
- Abate by
- Apr 16, 1998
Recent events (2)
- — F (O)
- — Z (O)
52050870
- Issued
- Mar 30, 1998
- Abate by
- Apr 16, 1998
- Penalty
- Initial $200 · Current $70 Reduced
Recent events (2)
- — F (O) $70.00
- — Z (O) $200.00
5205120003
- Issued
- Mar 30, 1998
- Abate by
- Apr 16, 1998
- Penalty
- Initial $200 · Current $70 Reduced
Recent events (2)
- — F (O) $70.00
- — Z (O) $200.00
5210063001
- Issued
- Mar 30, 1998
- Abate by
- Apr 9, 1998
- Penalty
- Initial $400 · Current $140 Reduced
Recent events (2)
- — F (O) $140.00
- — Z (O) $400.00
5210063001
- Issued
- Mar 30, 1998
- Abate by
- Apr 9, 1998
- Penalty
- Initial $400 · Current $400
Recent events (2)
- — F (O) $400.00
- — Z (O) $400.00
More inspections at Shoremaster, INC
View Shoremaster, INC's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in MN
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 126589480.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.