CAGUAS, PR —
OSHA Inspection: CENTRO PIEZAS FEDERAL MOGUR DE PR
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of CENTRO PIEZAS FEDERAL MOGUR DE PR in CALLE GEORGETTI 15, CAGUAS, PR 00725 (NAICS 000000). OSHA activity number 126916691.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- CENTRO PIEZAS FEDERAL MOGUR DE PR
- Site address
- CALLE GEORGETTI 15
- City
- CAGUAS
- State
- PR
- ZIP
- 00725
- Mailing
- PO BOX 11969, SAN JUAN, PR 00922
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 5531
- Employees
- 12
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
10 citations on file for this inspection.
1910.22 A01
- Issued
- Nov 24, 1997
- Abate by
- Dec 5, 1997
- Penalty
- Initial $1,350 · Current $675 Reduced
Recent events (2)
- — I (S) $675.00
- — Z (S) $1350.00
1910.138 B
- Issued
- Nov 24, 1997
- Abate by
- Dec 5, 1997
- Penalty
- Initial $1,350 · Current $675 Reduced
Recent events (2)
- — I (S) $675.00
- — Z (S) $1350.00
1910.141 A03 I
- Issued
- Nov 24, 1997
- Abate by
- Dec 2, 1997
- Penalty
- Initial $1,350 · Current $675 Reduced
Recent events (2)
- — I (S) $675.00
- — Z (S) $1350.00
1910.212 A03 II
- Issued
- Nov 24, 1997
- Abate by
- Dec 5, 1997
- Penalty
- Initial $1,350 · Current $675 Reduced
Recent events (2)
- — I (S) $675.00
- — Z (S) $1350.00
1910.215 A04
- Issued
- Nov 24, 1997
- Abate by
- Dec 2, 1997
- Penalty
- Initial $1,350 · Current $675 Reduced
Recent events (2)
- — I (S) $675.00
- — Z (S) $1350.00
1910.303 G02 I
- Issued
- Nov 24, 1997
- Abate by
- Dec 5, 1997
- Penalty
- Initial $1,350 · Current $675 Reduced
Recent events (2)
- — I (S) $675.00
- — Z (S) $1350.00
1910.304 F04
- Issued
- Nov 24, 1997
- Abate by
- Dec 5, 1997
- Penalty
- Initial $1,350 · Current $675 Reduced
Recent events (2)
- — I (S) $675.00
- — Z (S) $1350.00
1910.305 G01 II
- Issued
- Nov 24, 1997
- Abate by
- Dec 5, 1997
- Penalty
- Initial $1,350 · Current $675 Reduced
Recent events (2)
- — I (S) $675.00
- — Z (S) $1350.00
SPECRULE 1
- Issued
- Nov 24, 1997
- Abate by
- Dec 19, 1997
- Penalty
- Initial $450 · Current $225 Reduced
Recent events (2)
- — I (O) $225.00
- — Z (O) $450.00
1904.2 A
- Issued
- Nov 24, 1997
- Abate by
- Dec 19, 1997
More inspections at Centro Piezas Federal Mogur DE PR
View Centro Piezas Federal Mogur DE PR's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in PR
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 126916691.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.