Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: CHURCH PLASTERING CO

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of CHURCH PLASTERING CO in DRUID CITY HOSPITAL, Tuscaloosa, AL 35401 (NAICS 000000). OSHA activity number 13244850.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Church Plastering CO — free Get an email when a new federal OSHA severe-injury report for Church Plastering CO is published. One employer, no account, unsubscribe in one click.
Site address
DRUID CITY HOSPITAL
City
Tuscaloosa
State
AL
ZIP
35401
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Union status
A
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
1742
Employees
9
Industry flags
Construction safety.

1 citation on file for this inspection.

1910.212 A01

Other-than-serious 1 instance
Issued
Jul 29, 1975
Abate by
Aug 6, 1975

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 13244850.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.