Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,191,288Inspections Most recent open 2026-07-24 Last loaded 2026-07-29

OSHA Inspection: GARDEN STATE CONCRETE CO.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of GARDEN STATE CONCRETE CO. in ALBANY ST. AT GOLDEN TRIANGLE, NEW BRUNSWICK, NJ 08901 (NAICS 000000). OSHA activity number 17858689.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Garden State Concrete CO. — free Get an email when a new federal OSHA severe-injury report for Garden State Concrete CO. is published. One employer, no account, unsubscribe in one click.
Site address
ALBANY ST. AT GOLDEN TRIANGLE
City
NEW BRUNSWICK
State
NJ
ZIP
08901
Mailing
4415 GLENWOOD ROAD, BROOKLYN, NY 11203
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
1741
Employees
35
Ownership type
A
Industry flags
Construction safety.

17 citations on file for this inspection.

1926.20 B01

Serious 1 instance 10 exposed
Issued
Nov 18, 1987
Abate by
Nov 24, 1987
Penalty
Initial $300 · Current $150 Reduced
Recent events (2)
  • — I (S) $150.00
  • — Z (S) $300.00

1926.21 B02

Serious 1 instance 10 exposed
Issued
Nov 18, 1987
Abate by
Nov 21, 1987
Penalty
Initial $420 · Current $210 Reduced
Recent events (2)
  • — I (S) $210.00
  • — Z (S) $420.00

1926.500 D01

Serious 2 instances 10 exposed
Issued
Nov 18, 1987
Abate by
Nov 23, 1987

1926.25 A

Serious 2 instances 10 exposed
Issued
Nov 18, 1987
Abate by
Nov 21, 1987
Penalty
Initial $360 · Current $180 Reduced
Recent events (2)
  • — I (S) $180.00
  • — Z (S) $360.00

1926.150 C01 IV

Serious 1 instance 10 exposed
Issued
Nov 18, 1987
Abate by
Nov 21, 1987
Penalty
Initial $360 · Current $180 Reduced
Recent events (2)
  • — I (S) $180.00
  • — Z (S) $360.00

1926.350 A09

Serious 1 instance 10 exposed
Issued
Nov 18, 1987
Abate by
Nov 21, 1987
Penalty
Initial $360 · Current $180 Reduced
Recent events (2)
  • — I (S) $180.00
  • — Z (S) $360.00

1926.500 B01

Serious 1 instance 10 exposed
Issued
Nov 18, 1987
Abate by
Nov 23, 1987
Penalty
Initial $420 · Current $210 Reduced
Recent events (2)
  • — I (S) $210.00
  • — Z (S) $420.00

1926.500 B08

Serious 1 instance 10 exposed
Issued
Nov 18, 1987
Abate by
Nov 23, 1987
Penalty
Initial $360 · Current $180 Reduced
Recent events (2)
  • — I (S) $180.00
  • — Z (S) $360.00

1926.500 D01

Serious 2 instances 10 exposed
Issued
Nov 18, 1987
Abate by
Nov 23, 1987
Penalty
Initial $420 · Current $210 Reduced
Recent events (2)
  • — I (S) $210.00
  • — Z (S) $420.00

1926.500 D02

Serious 1 instance 10 exposed
Issued
Nov 18, 1987
Abate by
Nov 21, 1987
Penalty
Initial $240 · Current $120 Reduced
Recent events (2)
  • — I (S) $120.00
  • — Z (S) $240.00

1926.500 E01 IV

Serious 2 instances 10 exposed
Issued
Nov 18, 1987
Abate by
Nov 23, 1987
Penalty
Initial $420 · Current $210 Reduced
Recent events (2)
  • — I (S) $210.00
  • — Z (S) $420.00

1926.500 F01

Serious 2 instances 10 exposed
Issued
Nov 18, 1987
Abate by
Nov 23, 1987
Penalty
Initial $360 · Current $180 Reduced
Recent events (2)
  • — I (S) $180.00
  • — Z (S) $360.00

1926.500 F01 VIB

Serious 1 instance 10 exposed
Issued
Nov 18, 1987
Abate by
Nov 23, 1987
Penalty
Initial $360 · Current $180 Reduced
Recent events (2)
  • — I (S) $180.00
  • — Z (S) $360.00

1926.501 F

Serious 2 instances 10 exposed
Issued
Nov 18, 1987
Abate by
Nov 23, 1987
Penalty
Initial $360 · Current $180 Reduced
Recent events (2)
  • — I (S) $180.00
  • — Z (S) $360.00

1926.700 B02

Serious 1 instance 1 exposed
Issued
Nov 18, 1987
Abate by
Nov 23, 1987
Penalty
Initial $180 · Current $90 Reduced
Recent events (2)
  • — I (S) $90.00
  • — Z (S) $180.00

1904.2 B02

Other-than-serious 1 instance 1 exposed
Issued
Nov 18, 1987
Abate by
Nov 23, 1987
Penalty
Initial $100 · Current $50 Reduced
Recent events (2)
  • — I (O) $50.00
  • — Z (O) $100.00

1904.4

Other-than-serious 4 instances 1 exposed
Issued
Nov 18, 1987
Abate by
Nov 21, 1987
Penalty
Initial $400 · Current $200 Reduced
Recent events (2)
  • — I (O) $200.00
  • — Z (O) $400.00

View Garden State Concrete CO.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 17858689.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.