Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: PURCELL CONSTRUCTION CORP.

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of PURCELL CONSTRUCTION CORP. in FORT DRUM BCTII 10600 AREA, WATERTOWN, NY 13601 (NAICS 000000). OSHA activity number 18151944.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Purcell Construction Corp. — free Get an email when a new federal OSHA severe-injury report for Purcell Construction Corp. is published. One employer, no account, unsubscribe in one click.
Site address
FORT DRUM BCTII 10600 AREA
City
WATERTOWN
State
NY
ZIP
13601
Mailing
566 COFFEEN STREET, WATERTOWN, NY 13601
Inspection type
Referral (C)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
000000
SIC code (legacy)
1522
Employees
18
Ownership type
A
Industry flags
Construction safety.

14 citations on file for this inspection.

1926.59 F09

Serious Gravity 04 1 instance 5 exposed
Issued
Jun 13, 1990
Abate by
Jun 22, 1990
Penalty
Initial $280 · Current $195 Reduced
Recent events (2)
  • — I (S) $195.00
  • — Z (S) $280.00

1926.59 H

Serious Gravity 06 1 instance 18 exposed
Issued
Jun 13, 1990
Abate by
Jul 18, 1990
Penalty
Initial $420 · Current $295 Reduced
Recent events (2)
  • — I (S) $295.00
  • — Z (S) $420.00

1926.152 A01

Serious Gravity 06 1 instance 1 exposed
Issued
Jun 13, 1990
Abate by
Jun 16, 1990
Penalty
Initial $420 · Current $295 Reduced
Recent events (2)
  • — I (S) $295.00
  • — Z (S) $420.00

1926.152 G09

Serious Gravity 04 1 instance 5 exposed
Issued
Jun 13, 1990
Abate by
Jun 22, 1990
Penalty
Initial $280 · Current $195 Reduced
Recent events (2)
  • — I (S) $195.00
  • — Z (S) $280.00

1926.350 A09

Serious Gravity 05 1 instance 2 exposed
Issued
Jun 13, 1990
Abate by
Jun 18, 1990
Penalty
Initial $350 · Current $250 Reduced
Recent events (2)
  • — I (S) $250.00
  • — Z (S) $350.00

1926.350 J

Serious Gravity 05 1 instance 2 exposed
Issued
Jun 13, 1990
Abate by
Jun 18, 1990
Penalty
Initial $350 · Current $250 Reduced
Recent events (2)
  • — I (S) $250.00
  • — Z (S) $350.00

1926.450 A09

Serious Gravity 03 1 instance 2 exposed
Issued
Jun 13, 1990
Abate by
Jun 16, 1990
Penalty
Initial $210 · Current $145 Reduced
Recent events (2)
  • — I (S) $145.00
  • — Z (S) $210.00

1926.450 A10

Serious Gravity 03 1 instance 2 exposed
Issued
Jun 13, 1990
Abate by
Jun 16, 1990
Penalty
Initial $210 · Current $145 Reduced
Recent events (2)
  • — I (S) $145.00
  • — Z (S) $210.00

1926.451 D03

Serious Gravity 06 1 instance 2 exposed
Issued
Jun 13, 1990
Abate by
Jun 21, 1990
Penalty
Initial $420 · Current $295 Reduced
Recent events (2)
  • — I (S) $295.00
  • — Z (S) $420.00

1926.451 D04

Serious Gravity 06 1 instance 2 exposed
Issued
Jun 13, 1990
Abate by
Jun 21, 1990
Penalty
Initial $420 · Current $295 Reduced
Recent events (2)
  • — I (S) $295.00
  • — Z (S) $420.00

1926.451 D10

Serious Gravity 06 1 instance 2 exposed
Issued
Jun 13, 1990
Abate by
Jun 21, 1990
Penalty
Initial $420 · Current $295 Reduced
Recent events (2)
  • — I (S) $295.00
  • — Z (S) $420.00

1926.500 E01 IV

Serious Gravity 05 1 instance 5 exposed
Issued
Jun 13, 1990
Abate by
Jun 18, 1990
Penalty
Initial $350 · Current $250 Reduced
Recent events (2)
  • — I (S) $250.00
  • — Z (S) $350.00

1926.501 F

Serious Gravity 03 1 instance 2 exposed
Issued
Jun 13, 1990
Abate by
Jun 18, 1990
Penalty
Initial $210 · Current $145 Reduced
Recent events (2)
  • — I (S) $145.00
  • — Z (S) $210.00

1926.601 B09

Serious Gravity 05 1 instance 1 exposed
Issued
Jun 13, 1990
Abate by
Jun 27, 1990
Penalty
Initial $350 · Current $250 Reduced
Recent events (2)
  • — I (S) $250.00
  • — Z (S) $350.00

View Purcell Construction Corp.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 18151944.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.