OSHA Inspection: U.S. STEEL CORP.

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of U.S. STEEL CORP. in U S S FAIRLESS WORKS, FAIRLESS HILLS, PA 19030 (NAICS 000000). OSHA activity number 18252858.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch U.S. Steel Corp. for free Get an email when a new federal OSHA severe-injury report for U.S. Steel Corp. is published. One employer, no account, unsubscribe in one click.
Establishment
U.S. STEEL CORP.
Site address
U S S FAIRLESS WORKS
City
FAIRLESS HILLS
State
PA
ZIP
19030
Inspection type
Complaint (B)
Scope
Complete (A)
Discipline
Safety
Advance notice
Yes
Union status
Union (Y)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
000000
SIC code (legacy)
3312
Employees
4000
Ownership type
Private (A)

200 citations on file for this inspection.

5(a)(1)

Willful Gravity 09 2 instances 700 exposed
Issued
Nov 2, 1989
Abate by
May 11, 1991
Penalty
Initial $9,000 · Current $4,500 Reduced
Emphasis program
X
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
%%
employer did not furnish emoloyment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to
death or major fracture hazards while working on structures that were
corroded, deteriorated and missing structural member that were in danger
of collapse:
a) Iron and Transportation Division
1) Blast Furnace Department - Coke Breeze loading-out station - The
entire structure had severe structural damage including; damaged
base structures, cross-bracing angles missing and steel members
corroded, observed August 8, 1989.
2) Blast Furnace Department - Junction House for #9 and #10 conveyor,
the entire structure had angles missing and steel members severely
corroded, observed August 8, 1989.
Among other methods, one feasible and acceptable abatement method to
correct this hazard would be to correct all structural deficiencies as
noted in the in-house structural survey conducted by Orbital
Engineering.
Recent events (2)
  • · F (W) $4500.00
  • · Z (W) $9000.00

5(a)(1)

Deleted Willful Gravity 09 2 instances 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $9,000 · Current $9,000
Emphasis program
X
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to
death and crushing hazards due to unplanned collapse of an overhead
structure due to the severe corrosion and deterioration of the base
supports:
a) Iron and Transportation Division
1) Blast Furnace Department;  Blast Furnace #2 Precipator area,
outside pyrometer room - there was severe deterioration of the
concrete supporting piers exposing the reinforcing rods and base
plate bolts which were also severely damaged by corrosion,
observed August 9, 1989.
2) Transportation Department:  North end of the ore yard, stacker
conveyor or the supporting foundation structure for the overhead
conveyor was severely deteriorated in that the top of the concrete
foundation piers had concrete missing, exposing verical and
horizontal reinforcing rods and base support bolts, which were
also severely damaged by corrosion, observed August 8,1989.
Among other methods, one feasible and acceptable abatement method to
correct this hazard would be to repair structural damage to the
foundation to comply with its original design specifications.
Recent events (2)
  • · F (W) $9000.00
  • · Z (W) $9000.00

5(a)(1)

Willful Gravity 09 1 instance 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $4,500 · Current $2,250 Reduced
Emphasis program
X
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to
major fracture and concussion hazards due to material falling from over
head structures due to the severe corrosion and deterioration of the
roof structure:
a) Iron Transportation Division
1) Sinter Plant Department - There were several areas of the Sinter
Plant roof that were severely deteriorated and in danger of
collapse. Steel sheeting sections that collapsed in some areas
pieces dangling overhead above active work areas, observed August
8, 1989.
Among other methods, one feasable and acceptable abatement methodto
correct this hazard would be to correct all structural deficiencies as
noted in the in-house structural survey conductedby Orbital
Engineering.
Recent events (2)
  • · F (W) $2250.00
  • · Z (W) $4500.00

5(a)(1)

Deleted Willful Gravity 08 1 instance 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $4,000 · Current $4,000
Emphasis program
X
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to
death and crushing hazards due to unplanned collapse of an overhead
structure due to the severe corrosion and deterioration of its cross
bracing support members:
a) Iron Transportation Division
1) Blast Furnace Department - There was structural damage to the
overhead blast furnace gas line supporting structure in that there
was total separation of cross bracing members and damage to the
web of the vertical support columns, observed August 9, 1989.
Among other methods, one feasable and acceptable abatement method to
correct hazard would be to repair and/or replace the damaged structural
members is to comply with its original design specifications.
Recent events (2)
  • · F (W) $4000.00
  • · Z (W) $4000.00

1910.22 A01

Willful Gravity 05 104 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $364,000 · Current $171,500 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $171500.00
  • · Z (W) $364000.00

1910.22 A02

Willful Gravity 04 30 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $105,000 · Current $50,750 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $50750.00
  • · Z (W) $105000.00

1910.22 C

Willful Gravity 05 42 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $168,000 · Current $60,800 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $60800.00
  • · Z (W) $168000.00

1910.22 C

Willful Gravity 04 5 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $20,000 · Current $5,400 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $5400.00
  • · Z (W) $20000.00

1910.22 C

Willful Gravity 05 14 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $56,000 · Current $25,200 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $25200.00
  • · Z (W) $56000.00

1910.23 A08

Willful Gravity 02 35 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $122,500 · Current $31,500 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $31500.00
  • · Z (W) $122500.00

1910.23 C01

Willful Gravity 06 22 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $77,000 · Current $24,500 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $24500.00
  • · Z (W) $77000.00

1910.23 C02

Willful Gravity 02 17 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $59,500 · Current $22,750 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $22750.00
  • · Z (W) $59500.00

1910.23 C03

Willful Gravity 06 20 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $70,000 · Current $31,500 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $31500.00
  • · Z (W) $70000.00

1910.132 A

Willful Gravity 07 18 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $81,000 · Current $10,000 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $10000.00
  • · Z (W) $81000.00

1910.179 J02 III

Other-than-serious Gravity 07 6 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Aug 11, 1992
Penalty
Initial $6,000 · Current $1,000 Reduced
Emphasis program
X
Recent events (2)
  • · F (O) $1000.00
  • · Z (W) $6000.00

1910.179 L03 IIA

Willful Gravity 09 7 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $24,500 · Current $1,400 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $1400.00
  • · Z (W) $24500.00

1910.179 L03 IIB

Willful Gravity 06 3 instances 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $10,500 · Current $1,400 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $1400.00
  • · Z (W) $10500.00

1910.179 L03 IIC

Willful Gravity 07 8 instances 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $28,000 · Current $5,600 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $5600.00
  • · Z (W) $28000.00

1910.179 L03 IID

Willful Gravity 03 87 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $304,500 · Current $60,200 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $60200.00
  • · Z (W) $304500.00

1910.179 L03 IIE

Other-than-serious Gravity 08 1 instance 400 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $3,500 · Current $1,000 Reduced
Emphasis program
X
Recent events (2)
  • · F (O) $1000.00
  • · Z (W) $3500.00

1910.179 L03 III

Willful Gravity 08 185 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $647,500 · Current $137,200 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $137200.00
  • · Z (W) $647500.00

1910.212 A01

Willful Gravity 07 31 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $77,500 · Current $22,000 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $22000.00
  • · Z (W) $77500.00

1910.212 A01

Willful Gravity 06 1 instance 1 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $2,500 · Current $1,000 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $1000.00
  • · Z (W) $2500.00

1910.212 A01

Willful Gravity 05 40 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $100,000 · Current $29,000 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $29000.00
  • · Z (W) $100000.00

1910.219 I02

Willful Gravity 06 54 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $108,000 · Current $52,000 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $52000.00
  • · Z (W) $108000.00

1910.219 I02

Willful Gravity 06 9 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $18,000 · Current $9,000 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $9000.00
  • · Z (W) $18000.00

1910.303 B01

Willful Gravity 05 32 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $64,000 · Current $21,000 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $21000.00
  • · Z (W) $64000.00

1910.303 G02 II

Willful Gravity 06 11 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $44,000 · Current $18,000 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $18000.00
  • · Z (W) $44000.00

1910.304 F04

Willful Gravity 06 7 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $24,500 · Current $12,250 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $12250.00
  • · Z (W) $24500.00

1910.304 F05 V

Willful Gravity 06 5 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $17,500 · Current $7,000 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $7000.00
  • · Z (W) $17500.00

1910.305 G02 III

Willful Gravity 06 40 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $40,000 · Current $27,100 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $27100.00
  • · Z (W) $40000.00

1910.307 B

Willful Gravity 07 3 instances 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $6,000 · Current $1,000 Reduced
Emphasis program
X
Recent events (2)
  • · F (W) $1000.00
  • · Z (W) $6000.00

5(a)(1)

Willful Gravity 09 27 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $9,000 · Current $3,000 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to
a crushing hazard due to defective or missing cutters:
a) Iron and Transporation Division
1) Track #w-6 - W-Yard - Rail car #2596 had defective or missing
cutting levers, observed August 31, 1989.
2) Track #W-4 - W-Yard - Rail car #8647 had defective or missing
cutting levers, observed August 31, 1989.
3) Track #D-1 - W-Yard - Rail car #8522 had defective or missing
cutting levers, observed August 31, 1989.
4) Track #A-14 - Stripper Area - Rail car #2310 had defective or
missing cutting levers, observed August 31, 1989.
5) Track #S-12 - Stripper Area - Rail car #2121 had defective or
missing cutting levers, observed August 31, 1989.
6) Track #S-6 - Stripper Building - Rail cars #372, #128 and #3 had
defective or missing cutting levers, observed August 31, 1989.
7) Track #S-4 - Stripper Building - Rail cars #2025, #2247, #127,
#2247, #2022, #2287, #2200 and #16 had defective or missing
cutting levers, observed August 31, 1989.
8) Track #S-1 - Stripper Area - Rail cars #406, #24, #2129, #2265 and
#34 had defective or missing cutting levers, observed August 31,
1989.
9) Track #RA-2 - North Yard Area - Rail cars #2212, #2275, #1948 and
#2626 had defective or missing cutting levers, observed August 29,
1989.
10) Track #R2-9 - Bridge Yard Area - Rail cars #1446, #2218. #2584
and #1989 had defective or missing cutting levers, observed
August 29, 1989.
b) Steel Producing Division
1) Open Hearth Department - Track #H-18 - Stock House Yard - Rail
car #1186 had defective or missing cutting levers, observed
August 28, 1989.
2) Open Hearth Department - Track #H-17 - Stock House Yard - Rail
cars #2679, #2034, #2344 had defective or missing cutting levers,
observed August 28, 1989.
3) Open Hearth Department - Track #H-16 - Stock House Yard - Rail
cars #1296, #1151, #1295 and #1005 had defective or missing
cutting levers, observed August 28, 1989.
4) Open Hearth Department - Track #H-14 - Stock House Yard - Rail
cars #2246, #2000 and #2721 had defective or missing cutting
levers, observed August 28, 1989.
5) Open Hearth Department - Track #H-12 - Stock House Yard - Rail
cars #2307, #2314, #2604, #1443, #2668 and #2509 had defective
or missing cutting levers, observed August 28, 1989.
6) Open Hearth Department - Track #H-2 Stock House Yard - Rail car
#1990 had defective or missing cutting levers, observed August
28, 1989.
7) Open Hearth Department - Track #H-26 - Open Hearth Lean-To Area -
Rail cars #049 and #1120 had defective or missing cutting levers,
observed August 23, 1989.
8) Open Hearth Department - Track #H-24 - Open Hearth Lean-To Area -
Rail cars #1129, #1314 and #1059 had defective or missing cutting
levers, observed August 23, 1989.
9) Open Hearth Department - Track #H-24 - Open Hearth Lean-To Area -
Rail car #1228 had defective or missing levers, observed August
23, 1989.
10) Open Hearth Department - Track #H-9 - Open Hearth Yard - North
End - Rail cars #1932 and #2618 had defective or missing levers,
observed August 29, 1989.
11) Open Hearth Department - Track #H-7 - Open levers, observed
August 29, 1989.
12) Open Hearth Department - Track #H-18 Open Hearth Yard - Sought
End - Rail cars #2137, #2299, #2418, #2224, #1918, #2343, #2371
and #4233 had defective or missing levers, observed August 29,
1989.
13) Open Hearth Department - Track #H-9 - Open Hearth Yard - South
End - Rail cars #1973, #2501, #2167 and #2185 had defective or
missing cutting levers, observed August 29, 1989.
14) Open Hearth Department - Track #H-8 - Open Hearth Yard - North
End - Rail cars #2650, #2379 and #2331 had defective or missing
cutting levers, observed August 29, 1989.
15) Open Hearth Department - Track #H-13 - Stock House Yard - Rail
cars #2219 and #2515 had defective or missing cutting levers,
observed August 28, 1989.
16) Track #H-50 - Open Hearth Pit Side - Rail cars #560, #304, #0045,
#384, #2, #2123, #2170, #629, #2011, #0014, #157, #121, #2192,
#335 and #2208 had defective or missing cutting levers, observed
August 31, 1989.
17) Track #H-26 - Open Hearth Pit Side - Rail Cars V.I.B. #1 and
#2271 had defective or missing cutting levers, observed August
31, 1989.
Abatement Note: One feasible and useful means of abatement among other
methods would be for the company to implement and enforce a safety
appliance repair program to ensure rail cars are not used unless they
are free from defects that may cause employees to become injured.
Recent events (2)
  • · F (W) $3000.00
  • · Z (W) $9000.00

5(a)(1)

Deleted Willful Gravity 09 7 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $9,000 · Current $9,000
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to
the hazard of possible falling under a moving railroad car while they
are attempting to mount it because the riding stirrups were defective or
missing:
a) Iron and Transporation Division
1) Transportation Department -
Track #RA-2 - North Yard Area - Rail car #3326 had defective or
missing riding stirrups, observed August 29, 1989.
2) Transportation Department -
Track #R2-9 - Bridge Yard - Rail car #2584 had defective or
missing riding stirrups, observed August 29, 1989.
3) Transportation Department -
Track #W-4 - W-Yard - Rail car #8647 had defective or riding
stirrups, observed August 31, 1989.
4) Transportation Department -
Track #W-5 - W-Yard - Rail car #38569 had defective or missing
riding stirrups, observed August 31, 1989.
5) Transportation Department -
Track #W-6 - W-Yard - Rail cars #2596, #7389 and #1953 had
defective or missing riding stirrups, observed August 31, 1989.
b) Steel Producing Division
1) Open Hearth Department - Track #H-9 - Open Hearth Yard - North
End - Rail car #2618 had defective or missing riding stirrups,
observed August 29, 1989.
2) Open Hearth Department - Track #H-12 - Stock House Yard - South
End - Rail cars #2604 and #2314 had defective or missing stirrups,
observed August 28, 1989.
Abatement Note: One feasible and useful means of abatement among other
methods, would be for the company to implement and enforce a safety
appliance repair program to ensure rail cars are not used unless they
are free from defects that may cause employees to become injured.
Recent events (2)
  • · F (W) $9000.00
  • · Z (W) $9000.00

5(a)(1)

Serious Gravity 09 5 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $9,000 · Current $1,000 Reduced
Section 5(a(1) of the Occupational Safety and Health Act of 1970:  The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to
being struck by material falling from the open end of railcars, that had
end gates that were defective or missing:
a) Iron and Transportation Division
1) Transportation Department - Track #RA-2 - North Yard - Rail cars
#2529 and #4254 had defective or missing end gates, observed
August 29, 1989.
b) Steel Producing Division
1) Open Hearth Department - South End - Track #H-9 -
Open Hearth Yard - Rail cars #1994 and #2101 had defective or
missing end a gates, observed August 2929, 1989.
2) Open Hearth Department - South End - Track #H-8 -
Open Hearth Yard - Rail cars had defective or missing end gates,
observed August 29, 1989.
3) Open Hearth Department - Open Hearth Yard - North End - Track #H-8
Rail car #1946 had defective or missing end gates, observed
August 29, 1989.
4) Open Hearth Department - Track #H-17 - Stock House Yard -
Rail car #4204 had defective or missing end gates, observed
August 23, 1989.
Abatement Note: One feasible and useful means of abatement among other
methods, would be for the company to implement and enforce a safety
appliance repair program to ensure rail cars are not used unless they
are free from defects that may cause employees to become injured.
Recent events (2)
  • · F (S) $1000.00
  • · Z (W) $9000.00

5(a)(1)

Deleted Willful Gravity 09 7 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $9,000 · Current $9,000
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to
the hazard of possibly falling under a moving railroad car while they
are attempting to mount it because the grab irons were defective or
missing:
a) Iron and Transportation Division
1) Transportation Department - Track #W-6 - W-Yard -
Rail cars #2596, #1953, #7389 and #2170 had defective or missing
grab irons, observed August 31, 1989.
2) Transportation Department - Track #W-5 - W-Yard -
Rail cars #8588 and #35079 had defective or missing grab irons,
observed August 31, 1989.
3) Transportation Department - Track #W-4 - W-Yard -
Rail car #8567 had defective or missing grab irons, observed
August 31, 1989.
4) Transportation Department - Track #R2-9 - Bridge Yard -
Rail car #2584 had defective or missing grab irons, observed
August 29, 1989.
b) Steel Producing Division
1) Open Hearth Department - Track #H-7 - Open Hearth Yard -
Rail car #3605 had defective or missing grab irons, observed
August 29, 1989.
2) Open Hearth Department - Track #H-9 - Open Hearth Yard -
Rail car #2618 had defective or missing grab irons, observed
August 29, 1989.
3) Open Hearth Department - Track #H-12 - Stock House Yard - South
End - Rail cars #2314 and #2604 had defective or missing grab
irons, observed August 28, 1989.
Abatement Note: One feasible and useful means of abatement among other
methods, would be for the company to implement and enforce a safety
appliance repair program to ensure rail cars are not used unless they
are free from defects that may cause employees to become injured.
Recent events (2)
  • · F (W) $9000.00
  • · Z (W) $9000.00

5(a)(1)

Other-than-serious Gravity 08 7 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $9,000 · Current $1,000 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to
the hazard of being struck by moving trains and/or particular traffic,
due to insufficient illumination provided in the work area:
a) Iron and transportation division
1) Transportation Department - Employees were exposed to the hazard
of being struck by moving trains and/or vehicular traffic due to
insufficient illumination provided in the work area. Illumination
reading indicated 0.2 foot candles of lighting at N-80 extension
north end railroad crossing, observed September 12, 1989.
2) Transportation Department - Employees were exposed to the hazard
of being struck by moving trains and/or vehicular traffic due to
insufficient illumination provided in the work area. Illumination
reading indicated 2.0 footcandles of lighting at the north end of
the Stockhouse adjacent to the #3 Larryman Station, observed
September 12, 1989.
3) Blast Furnace Department - Employees were exposed to the hazard of
being struck by moving trains and/or vehicular traffic due to
insufficient illumination provided in the work area. Illumination
reading indicated 2.0 footcandles of lighting at the trestle
between #2 and #3 Blast Furnace, observed September 12, 1989.
4) Blast Furnace Department - Employees were exposed to the hazard of
being struck by moving trains and/or vehicular traffic due to
insufficient illumination provided in the work area. Illumination
reading indicated 0.10 footcandles of lighting at the pedestrian
accessway to #3 Blast Furnace, observed September 12, 1989.
5) Transportation Department - Employees were exposed to the hazard
of being struck by moving trains and/or vehicular traffic due to
insufficient illumination provided in the work area. Illumination
reading indicated .28 footcandles of lighting at the east end of
E-96, south end of the arc furnace, observed September 12, 1989.
6) Transportation Department - Employees were exposed to the hazard
of being struck by moving trains and/or vehicular traffic due to
insufficient illumination provided in the work area. Illumination
reading indicated 0.1 footcandles of lighting at the railroad
crossing adjacent to the Water Treatment Plant, observed
September 12, 1989.
b) Steel Producing Division
1) Open Hearth Department - Employees were exposed to the hazard of
being struck by moving trains and/or vehicular traffic due to
insufficient illumination provided in the work area. Illumination
reading indicated from 0.1 to 0.5 footcandles of lighting at the
south end of the line and ore bin - H23 Track, observed September
12, 1989.
Among other methods, one feasible and acceptable abatement method to
correct this hazard is to provide adequate illumination in the work
area, as recommended by the illumination Engineering Society, ANSI
11.1.
Recent events (2)
  • · F (O) $1000.00
  • · Z (W) $9000.00

5(a)(1)

Willful Gravity 04 9 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to
slips, trips, and falls due to insufficient illumination provided in the
work area:
a) Rolling Division
1) Slab Yard #2 and #3 - Second and third shift employees were
exposed to potential tripping hazards as the quality and quantity
of illumination was poor or almost nonexistent (e.g. slab yard #2
had approximately 52 burnt out light bulbs and the south end of
this yard had no lighting fixture installed; slab yard #3 had even
less illumination than yard #2), observed September 19, 1989.
b) Steel Producing Division
1) Open Hearth Department - Employees were exposed to the hazard of
slips, trips, and falls due to insufficient illumination provided
at Open Hearth employee walkway to parking lot. Illumination
readings indicated from 0.1 to 4.0 footcandles of lighting,
observed September 13, 1989.
2) Open Hearth Department - Employees were exposed to the hazard of
slips, trips, and falls due to insufficient illumination provided
at steps down from Open Hearth #8 and #9 furnaces. Illumination
readings indicated 0.1 footcandles of lighting, observed
September 13, 1989.
3) Open Hearth Department - Employees were exposed to the hazard of
slips, and falls due to insufficient illumination provided behind
#9 Open Hearth Furnace. Illumination reading indicated 0.5
footcandles of lighting, observed September 13, 1989.
4) Open Hearth Department - Employees were exposed to the hazard of
slips, trips, and falls due to insufficient illumination provided
at #8 Open Hearth Furnace facing east. Illumination reading
indicated from 6.0 to 2.0 footcandles of lighting, observed
September 13, 1989.
5) Open Hearth Department - Employees were exposed to the hazard of
slips, trips, and falls due to insufficient illumination provided
at #3 turnout at #9 Open Hearth Furnace. Illumination reading
indicated 8.0 footcandles of lighting, observed September 13,
1989.
6) Open Hearth Department - Employees were exposed to the hazard of
slips, trips, and falls due to insufficient illumination provided
south of material bin #22 bin. Illumination reading indicated from
0.2 to 14.0 footcandles of lighting, observed September 13, 1989.
7) Open Hearth Department - Employees were exposed to the hazard of
of slips, trips, and falls due to insufficient illumination
provided in the work area. Illumination readings indicated from
5.0 to 8.0 footcandles of lighting at the south end walkway of
the Stockhouse, observed September 12, 1989.
c) Parking Lot
1) Outside Parking Lot Area Adjacent to Outside Plant Entrance Gate -
Employees were exposed to the hazard of slips, trips and falls due
to insufficient illumination provided in the work area.
Illumination readings indicated 0.1 to 2.5 footcandles of lighting
observed September 13, 1989.
Among other methods, one feasible and acceptable abatement method to
correct this hazard is to provide adequate illumination in the area, as
recommended by the Illumination Engineering Society, A11.1
Recent events (2)
  • · F (W)
  • · Z (W)

5(a)(1)

Deleted Willful Gravity 10 22 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $10,000 · Current $10,000
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to
explosion hazards associated with tank failure due to pressure vessels
operating without a certificate of operation:
a) Iron and Transportation Division
1) Blast Furnace #3 Pump House - An air tank (NB12039) with a
nominal operating pressure of 60 psig, did not have a current
certificate of operation from the Commonwealth of Pennsylvania,
observed September 12, 1989.
2) Blast Furnace Department - Stockhouse - Three larry car air tanks
operating at 60 psig nominal, were unlawfully operated without
having a current certificate of operation from the Commonwealth
of Pennsylvania, observed June 20, 1989.
b) Rolling Division
1) 30" Motor Room - The oil surge tank for the horizontal oil system
with an operating pressure of 50 psig nominal was unlawfully
operated without having a current certificate of operation from
the Commonwealth of Pennsylvania, observed August 10, 1989.
2) 30" Motor Room - The oil surge tank for the pinion and bevel
system with an operating pressure of 50 psig nominal, was
unlawfully operated without having a current certificate of
operation from the Commonwealth of Pennsylvania, observed August
10, 1989.
3) 40" Mill - North end of Oil Cellar - Two oil surge tanks with an
operating pressure of 30 psig nominal, were unlawfully operated
without having a current certificate of operation from the
Commonwealth of Pennsylvania, observed August 10, 1989.
4) 45" Mill - Oil and Pump Cellar - An oil separation surge tank
(operating pressure was unknown as pressure gauge was not
provided) was unlawfully operated as the certificate of operation
from the Commonwealth of Pennsylvania posted on the wall was for
the period 1971 through 1973, observed August 7, 1989.
5) 80" Mill Basement - The scaling accumulator with an operating
pressure of 1000 psig nominal, was unlawfully operated without
having a current certificate of operation from the Commonwealth
of Pennsylvania, observed August 29, 1989.
6) 80" Mill - West side of Roughers #3 and #4 Three air compressor
storage tanks with operating pressures of 90 psig nominal, were
unlawfully operated without having a current certificate of
operation from the Commonwealth of Pennsylvania, observed August
29, 1989.
7) 80" Mill - #1, #2, and #3 Coiler Air Tanks - Three air tanks
(operating pressure was unknown as pressure gauges were not
installed) were unlawfully operated without having a current
certificate of operation from the Commonwealth of Pennsylvania,
observed August 22, 1989.
8) 80" Mill - Coiler Area - The coiler oil surge tank observed at 22
psig nominal, was unlawfully operated without having a current
certificate of operation from the Commonwealth of Pennsylvania,
observed August 28, 1989.
9) 80" Mill - Oil Cellar - The Bowser Inc. surge tank with an
operating pressure of 60 psig nominal, was unlawfully operated
without having a current certificate of operation from the
Commonwealth of Pennsylvania, observed August 29, 1989.
10) 80" Mill - Oil Cellar - The back up filter tank operating at 50
psig nominal, was unlawfully operated without having a current
certificate of operation from the Commonwealth of Pennsylvania,
observed August 29, 1989.
11) 80" Mill - Oil Cellar - the gear drive surge tank operating at 60
psig nominal, was unlawfully operated without having a current
certificate of operation from the Commonwealth of Pennsylvania,
observed August 29, 1989.
12) 80" Mill - Oil Cellar - the gear drive filter tank with an
operating pressure of 50 psig nominal, was unlawfully operated
without having a current certificate of operation from the
Commonwealth of Pennsylvania, observed August 29, 1989.
13) 80" Mill - Oil Cellar - The pinon oil surge tank operating at 60
psig nominal, was unlawfully operated without a current
certificate of operation from the Commonwealth of Pennsylvania,
observed August 29, 1989.
14) 80" Mill - Oil Cellar - The pinon oil filter tank operating at 50
psig nominal, was unlawfully operated without having a current
certificate of operation from the Commonwealth of Pennsylvania,
observed August 29, 1989.
15) 80" Mill - Oil Cellar - The motor oil surge tank with an
operating pressure of 60 psig nominal, was unlawfully operated
without having a current certificate of operation from the
Commonwealth of Pennsylvania, observed August 29, 1989.
16) 80" Mill - Oil Cellar - The motor oil filter tank with an
operating pressure of 50 psig nominal, was unlawfully operated
without having a current certificate of operation from the
Commonwealth of Pennsylvania, observed August 29, 1989.
17) 80" Mill - Oil Cellar - The vertical edger surge tank operating
at 60 psig nominal, was unlawfullyoperated without a current
certificate of operation from the Commonwealth of Pennsylvania,
observed August 29, 1989.
18) 80" Mill - Oil Cellar - The vertical edger system filter tank
operating at 50 psig nominal, was unlawfully operated without a
current certificate of operation from the Commonwealth of
Pennsylvania, observed August 29, 1989.
19) The cardox storage tanks for the carbon dioxide total flooding
systems were unlawfully operated without having a current
certificate of operation from the Commonwealth of Pennsylvania,
observed August 31, 1989.
c) Steel Producing Division
1) Open Hearth - Two fire tube waste heat boilers (serial numbers
B015583 and B015584) were unlawfully operating without having a
current certificate of operation from the Commonwealth of
Pennsylvania, observed July 28, 1989.
Among other methods, one feasible and acceptable abatement method to
correct this hazard is for the employer to comply with all the rules
and regulations of the Commonwealth of Pennsylvania Department of Labor
and Industry, Bureau of Occupational and Industrial Safety Boiler Law
(Act No. 451) for all pressure vessels. The pressure vessel inspection
log-book, that was maintained by Mr. O'Brien, indicated approximately
750 or more vessels that were not inspected within the timeframes of the
34 PA Code, Chapter 3, Section 3.12.
Recent events (2)
  • · F (W) $10000.00
  • · Z (W) $10000.00

5(a)(1)

Willful Gravity 10 3 instances 800 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Current $1,000
Section 5(a0(1) of the Occupational Safety and Health Act of 1970: The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to
explosion hazards associated with unsafe operation of pressure vessels:
a) Rolling Division
1) 45" Mill, Oil and Pump Cellar - The oil separation surge tank was
not provided with a pressue gauge on or in the near proximity of
the vessel to determine its operating pressure. An intervening
stop valve was installed between the pressure relief device and
vessel creating a potential hazard in the event the valve was in
the closed position, observed August 7, 1989.
2) 40" Mill, North End of Oil Cellar - Two oil surge tanks with an
operating pressure of 30 p.s.i.g. nominal, were not provided with
pressure relief devices and the nameplates on each vessel were not
legible, observed August 10, 1989.
3) 80" Mill, Coiler Area - The coiler oil surge tank with an
operating pressure observed at 22 p.s.i.g. nominal, had two
intervening stop valves installed between the vessel and the
pressure relief devices creating a potential hazard in the event
the valves were in the closed position. The system's pressure
relief devices that were located on the two oil pumps were not
marked or tagged with the required data, observed August 28, 1989.
Among other methods, one feasible and acceptable abatement method would
be to recognized and meet Commonwealth of Pennsylvania Act No. 451
(Boiler Law) and regulations governing unfired pressure vessels.
Recent events (2)
  • · F (W) $1000.00
  • · Z (W)

1910.169 B02

Willful Gravity 05 1 instance 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Recent events (2)
  • · F (W)
  • · Z (W)

1910.169 B03 I

Willful Gravity 06 3 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Recent events (2)
  • · F (W)
  • · Z (W)

1910.169 B03 III

Deleted Willful Gravity 10 1 instance 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Recent events (2)
  • · F (W)
  • · Z (W)

1910.169 B03 IV

Willful Gravity 06 5 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Recent events (2)
  • · F (W)
  • · Z (W)

1910.179 J02 III

Other-than-serious Gravity 02 90 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $2,000 · Current $6,000
Recent events (2)
  • · F (O) $6000.00
  • · Z (W) $2000.00

1910.179 M01

Other-than-serious Gravity 10 54 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $2,000 · Current $6,000
Recent events (2)
  • · F (O) $6000.00
  • · Z (W) $2000.00

1910.179 M01

Other-than-serious Gravity 10 6 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Recent events (2)
  • · F (O)
  • · Z (W)

1910.180 H01 I

Other-than-serious Gravity 08 1 instance 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $8,000 · Current $1,000 Reduced
Recent events (2)
  • · F (O) $1000.00
  • · Z (W) $8000.00

1910.180 H01 I

Deleted Willful Gravity 09 1 instance 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $9,000 · Current $9,000
Recent events (2)
  • · F (W) $9000.00
  • · Z (W) $9000.00

1910.184 E01

Willful Gravity 04 33 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $1,000 · Current $800 Reduced
Recent events (2)
  • · F (W) $800.00
  • · Z (W) $1000.00

1910.184 E03 I

Willful Gravity 08 30 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $5,000 · Current $1,000 Reduced
Recent events (2)
  • · F (W) $1000.00
  • · Z (W) $5000.00

1910.184 E03 II

Willful Gravity 03 1 instance 400 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Recent events (2)
  • · F (W)
  • · Z (W)

1910.184 F01

Deleted Willful Gravity 08 1 instance 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $8,000 · Current $8,000
Recent events (2)
  • · F (W) $8000.00
  • · Z (W) $8000.00

1910.252 B04 IX

Deleted Willful Gravity 07 1 instance 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $7,000 · Current $7,000
Recent events (2)
  • · F (W) $7000.00
  • · Z (W) $7000.00

1910.303 G02 I

Repeat Gravity 05 1 instance
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $1,700,000 · Current $1,120,000 Reduced
Recent events (2)
  • · F (R) $1120000.00
  • · Z (R) $1700000.00

1910.303 G02 I

Repeat Gravity 08 12 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $1,000 · Current $900 Reduced
Emphasis program
X
Recent events (2)
  • · F (R) $900.00
  • · Z (R) $1000.00

1910.305 G01 III

Repeat Gravity 06 77 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $15,400 · Current $10,250 Reduced
Emphasis program
X
Recent events (2)
  • · F (R) $10250.00
  • · Z (R) $15400.00

1910.37 K02

Repeat Gravity 07 29 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $7,000 · Current $3,000 Reduced
Recent events (2)
  • · F (R) $3000.00
  • · Z (R) $7000.00

1910.101 B

Repeat Gravity 04 2 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $2,400 · Current $1,500 Reduced
Recent events (2)
  • · F (R) $1500.00
  • · Z (R) $2400.00

1910.101 B

Repeat Gravity 06 2 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Recent events (2)
  • · F (R)
  • · Z (R)

1910.101 B

Repeat Gravity 04 4 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Recent events (2)
  • · F (R)
  • · Z (R)

1910.157 E03

Repeat Gravity 03 8 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $400 · Current $300 Reduced
Recent events (2)
  • · F (R) $300.00
  • · Z (R) $400.00

1910.157 E03

Repeat Gravity 01 3 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Recent events (2)
  • · F (R)
  • · Z (R)

1910.176 A

Repeat Gravity 03 3 instances 600 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $1,000 · Current $600 Reduced
Recent events (2)
  • · F (R) $600.00
  • · Z (R) $1000.00

1910.178 P01

Repeat Gravity 07 5 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $2,800 · Current $2,000 Reduced
Recent events (2)
  • · F (R) $2000.00
  • · Z (R) $2800.00

1910.242 B

Repeat Gravity 05 9 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $2,800 · Current $2,000 Reduced
Recent events (2)
  • · F (R) $2000.00
  • · Z (R) $2800.00

1910.252 A02 IIB

Repeat Gravity 03 24 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $2,400 · Current $1,500 Reduced
Recent events (2)
  • · F (R) $1500.00
  • · Z (R) $2400.00

1910.252 A02 IID

Repeat Gravity 06 11 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $6,000 · Current $3,000 Reduced
Recent events (2)
  • · F (R) $3000.00
  • · Z (R) $6000.00

1910.252 A02 IVC

Repeat Gravity 06 17 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $6,000 · Current $3,000 Reduced
Recent events (2)
  • · F (R) $3000.00
  • · Z (R) $6000.00

1910.252 A02 IVC

Repeat Gravity 06 1 instance 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Recent events (2)
  • · F (R)
  • · Z (R)

5(a)(1)

Serious Gravity 05 2 instances 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to
crushing and amputation hazards due to the possible inadvertent
activation of unguarded palm buttons:
a) Pipe Division
1) Between Continuous Welding Lines Number One and Two - Employees
crush test sections of pipe with a hydraulic press. The press
operating palm buttons are not protected from unintended operation
thus exposing employees to injury from the closing press ram,
observed June 22, 1989.
b) Utilities, Shops, and Services
1) Central Maintenance Shop - Fabrication Department - The two
(mushroom type) palm buttons used to initiate stroke on the
Steelweld (large) shear, serial number M4850, located in the
Fabrication Department were not protected by ring guards (or the
equivalent). The shear blade was inadequately guarded, also,
observed August 15, 1989.
Among other feasible and acceptable methods to correct this hazard would
be to provide guards for the palm buttoms.
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

5(a)(1)

Deleted Serious Gravity 06 1 instance 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that the two hand controls were
not arranged by design or construction or separation or both to require
concurrent use of both hands:
a) Utilities, Shop, and Services
1) Central Maintenance Shop - Fabrication Department - The two
(mushroom type) palm buttons used to initiate stroke of the
Steelweld (large) shear, serial number M4850, were only separated
13 and one-half inches. The shear blade was also inadequately
guarded, observed August 15, 1989.
Among other feasible and acceptable methods to correct this hazard
would be to arrange controls to require concurrent use of both hands.
Recent events (2)
  • · F (S)
  • · Z (S)

5(a)(1)

Serious Gravity 06 4 instances 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $700 · Current $350 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to
crushing and amputation hazards by foot petal/treadle mechanism(s) on
machinery that were not protected or were inadequately protected to
prevent unintended operations from falling or moving objects or by
accidental stepping onto the pedals/treadles:
a. Utilities, Shops, and Services
1) Central Maintenance Shop - The two foot pedals (independent) on
the Thomas double head ironworking angle shear, serial number A151
located in the department were not guarded, observed August 15,
1989.
2) Fabrication Shop - Employees use a Steelweld press brake (serial
number M4995) to form metal. The foot pedal control is unguarded
thus exposing employees to injury, observed August 11, 1989.
3) Fabrication Shop - Employees bend sheet/plate metal on a Verson
press brake (serial number 96911). The machine operating foot
treadle is unguarded thus exposing employees to injury if the
machine were inadvertently actuated, observed August 11, 1989.
4) Fabrication Shop - Employees shear corrugated sheet metal on a
Peck, Stow, and Wilcox shear (serial number K9072). The machine
operating foot treadle is unguarded thus exposing employees to
injury if the machine were inadvertently actuated, observed
August 11, 1989.
Among other feasible and acceptable methods to correct this hazard
would be to provide guard for foot treadle.
Recent events (2)
  • · F (S) $350.00
  • · Z (S) $700.00

5(a)(1)

Serious Gravity 06 3 instances 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to
fracture and amputation hazards from remotely and automatically
controlled conveyors with potentially hazardous locations on the
conveyor path:
a) Iron and Transportation Division
1) Blast Furnace Department - Blast Furnace #2 - Coke Feeder Conveyor
The conveyor that was remotely located from its controls did not
have emergency stop devices in the immediate vicinity of the
hazardous ingoing nip points created by the conveyor belt and
roller, observed June 19, 1989.
2) Blast Furnace Department - Blast Furnace #2 - Coke Breeze Conveyor
The belt conveyor that was remotely located from its controls did
not have emergency stop devices and the conveyor path had
potentially hazardous locations (e.g. ingoing nip points between
the conveyor belt and rollers), observed June 19, 1989.
3) Blast Furnace Department - Blast Furnace #3 - Coke Breeze Conveyor
The belt conveyor section approximately 9 feet, at the coke refill
pit that was remotely located from its controls did not have
emergency stop devices and the conveyor path had potentially
hazardous locations (e.g. ingoing nip points between the conveyor
belt and rollers), observed June 19, 1989.
Among other methods, one feasible and acceptable abatement method to
correct this hazard is to install an emergency stop device in the
immediate vicinity of the hazardous locations so that the device acts
directly on the control of the conveyor. The emergency stop device shall
not depend on the stopping of any other equipment and the devcie shall
be installed so that they cannot be over-ridden from other location(s).
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

5(a)(1)

Serious Gravity 06 3 instances 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to
crushing hazard due to failure of the flat car frame due to coil weight
and the existing cracks in the car frame(s):
a) Sheet and Tin Division
1) Anneal Area - Batch anneal transfer car #5, cracks in both sides
of the car frame, observed August 8, 1989.
2) Anneal Area - Batch anneal transfer car #4, cracks in both sides
of the car frame, observed August 8, 1989.
3) Anneal Area - Batch anneal transfer car #24, cracks in both sides
of the car frame, observed August 1, 1989.
Among other methods, one feasible and acceptable abatement method to
correct this hazard is to properly repair the cracks or replace the
cars.
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

5(a)(1)

Deleted Serious Gravity 09 1 instance 400 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $900
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to
the hazard of fractures, lacerations, contusions, abrasions, burns and
possible death while handling explosive devices (jet-tappers):
a) Steel Producing Division
1) Open Hearth Department - Employees are permitted to handle and
detonate explosive (jet-tappers) as part of their daily work
acitivity in order to tap the furnaces throughout the open hearth
department, several times a day. No employees are blaster,
licensed by the Commonwealth of Pennsylvania, observed August
23, 1989.
Among other methods one feasible and acceptable method to correct this
hazard would be to have the employees acquire a blasters license as
required under Title 25, Rules and Regulations; Part 1, Department of
Environmental Resources; Subpart D, Environmental Health and Safety:
Article IV, Occupational Health and Safety, Chapter 210 "Use of
Explosives", Subchapter A - Section 210.5(a) and Chapter 11 "Storage,
Handling, and Use of Explosives", Section 211.51(3).
Recent events (2)
  • · F (S)
  • · Z (S) $900.00

5(a)(1)

Deleted Serious Gravity 08 1 instance 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $800
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to
death or crushing hazards from falling loads caused an improper
combination of equipment:
a) Sheet and Tin Division
1) Tin Free Steel Entry Tower, North Side - A 3/4 inch sheave was
placed in service where 7/8 inch wire rope was used thus imposing
excessive strain and abrasive wear on the wire rope, observed
August 10, 1989.
A feasible and acceptable abatement method to correct the hazard is to
replace the improperly used sheave with an appropriate one.
Recent events (2)
  • · F (S) $800.00
  • · Z (S) $800.00

5(a)(1)

Serious Gravity 09 1 instance 900 exposed
Issued
Nov 2, 1989
Abate by
Mar 31, 1991
Penalty
Initial $900 · Current $450 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to
increased risk of cumulative trauma disorders from the tasks that they
were performing and administrative or engineering controls were not
provided.
a) Sheet and Tin Division
1) Four and Five Stand - Employees must lift a 227 pound shim, one
side at a time, in preparation for installing new rolls, and an
evaluation of these manual lifting tasks indicates that employees
are exposed to an increased risk of musculoskeletal injuries based
upon studies of populations exposed to similar lifting conditions,
observed July 17, 1989.
Among other methods, one feasible and acceptable method to correct this
hazard is to employ the use of mechanical handling aids and/or the
redesign of working station heights.
Step 1: Effective administrative protection, such as employee training,
physical assessment, job rotation, etc. shall be provided as an
interim protective measure until feasible engineering or permanent
administrative controls can be implemented which will reduce employee
exposure to nominal risk.
Step 2: Submit to the Area Director a written, detailed plan of
abatement outlining a schedule for the implementation of engineering
or administrative measures to control employee injury due to manual
lifting tasks. Engineering controls to reduce musculoskeletal
stresses include, but are not limited to, job redesign, reduction
of the horizontal and vertical load distance from the body, reduction
of the lifting frequency or weight, and use of mechanical lifting
aids. This plan shall include at a minimum, target dates for the
following actions which must be consistent with the dates required
by this citation:
1) Evaluation of the conditions, locations and manual lifting
activities that the employees are performing at the onset of
musculoskeletal injuries.
2) Evaluation of applicable control measures.
3) Procurement, installation and operation of selected control
measures.
All proposed control measures shall be approved for each particular use
by a person trained in the evaluation of workplace conditions which
cause musculoskeletal disorders. Thirty day progress reports are
required during the abatement period.
Step 3: Develop a rehabilitation program for injured workers. The
program is expected to include exercise, building stamina, training
in safe lifting techniques, work conditioning and demonstration that
the worker is able to resume work.
Step 4: Abatement shall have been completed by the implementation of
feasible engineering and/or administrative controls.
Recent events (2)
  • · F (S) $450.00
  • · Z (S) $900.00

5(a)(1)

Deleted Serious Gravity 08 1 instance 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $800
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
%%
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to
major contusions and fractures from rope failure due to 15 wires broken
in one lay of a wire rope used to pull the looper while steel is being
run through the galvanized line:
a) Sheet and Tin Division
1) Galvanize Line - Top Pass Entry Looper - broken wires in the wire
rope created a hazard, observed August 15, 1989.
Among other methods, one feasible and acceptable abatement method to
correct this hazard is the replacement of the wire rope.
Recent events (2)
  • · F (S) $800.00
  • · Z (S) $800.00

5(a)(1)

Deleted Serious Gravity 06 1 instance 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $600
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to
crushing hazards from the possibility of the load shifting or the
operator loosing control from the king pin or other major part failing
due to tractor-trailer overloading:
a) Sheet and Tin Division
1) Roadways - Mack Truck and Semi-trailer with Yeager Trucking
stenciled on the side, observed 6/29/89.
Among other method, one feasible and acceptable abatement method to
correct this hazard is to load less than the manufactures gross weight
on the unit.
Recent events (2)
  • · F (S) $600.00
  • · Z (S) $600.00

5(a)(1)

Serious Gravity 05 1 instance 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $500 · Current $250 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
%%
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to
fracture and contusion hazards from an air hose which can flagellate if
damaged:
a) Utilities, Shops, and Services
1) Steam Cleaning Booth in Machine Shop - Employees operate a
transfer car in the booth. The car is powered by a pneumatic motor
supplied by an umbilical air line. The air line is not fitted with
a safety device exposing employees to the flagellating air line
when the car wheels sever the line, observed August 8, 1989.
Among other methods, one feasible and acceptable abatement method to
correct this hazard is to install air line check valves.
Recent events (2)
  • · F (S) $250.00
  • · Z (S) $500.00

5(a)(1)

Serious Gravity 08 2 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $400 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to
death or crushing hazards from falling loads caused by bolt or shackle
failure:
a) Sheet and Tin Division
1) On numerous occasions case hardened bolts have been used to
replace shackle screw pins. The bolts will shear rather than bend
as would the original pin. This shearing action would eliminate
all forewarning of failure and a possible falling load, observed
June 20, 1989.
b) Iron and Transportation Division
1) Open Hearth Mobile Shop - Clevis 7/8" regular bolt replaced by a
3/4" hardened bolt and nut, observed August 31, 1989.
Among other methods, one feasible and acceptable abatement method is to
use only those pins designed for use with shackles.
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

5(a)(1)

Serious Gravity 08 8 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $400 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to
death or crushing hazards from possible failure of defective or improper
lifting devices:
a. Rolling Division
1) 80" Mill - Coiler Area - The Heppenstall (V-10) 50,000 pound
capacity vertical axis coil grab had the keeper plat bolts sheared
off at a pivot joint creating a potential safety hazard while
liftng 7 to 15 ton coils, observed August 22, 1989.
2) 80" Mill - Slay Yard #2 - The four magnet lifting beam assembly
had one of its two main support bolts significantly backed out
of its nut creating a potential safety hazard at the #42 semi-
gantry crane while lifting slabs weighing 7 to 15 tons, observed
August 14, 1989.
3) 80" Mill - Slab Yard #1 - The Heppenstall (used on crane #34) 80
ton capacity automatic slab tong (four-point type) had six bolts
missing from keeper plates at pivot points and a cotter pin
missing from the loose "monkey hoist" bolt (bolt could be backed
off by hand) creating a potential safety hazard while lifting 5 to
6 slabs (each weighing 7 to 15 tons) at a time, observed August
11, 1989.
4) 80" Mill - Coiler Area - The Heppenstall (#4447) 40,000 pound
capacity vertical axis coil grab had one of two keeper plate bolts
backed out at a pivot joint creating a potential safety hazard
while lifting 7 to 15 ton coils, observed August 22, 1989.
5) 80" Mill - Slab Yard #2 - The Heppenstall (#45) 80 ton capacity
automatic slab tong (four point type) three loose keeper ring
bolts on the lower stabilizer beam with a bolt missing on keeper
ring located at the other end of the beam creating a potential
safety hazard while lifting 5 to 6 slabs (each weighing between
7 to 15 tons) at a time, observed August 14, 1989.
6) Central Maintenance Division - #2 Soaking Pit - The alloy chain
lifting beam assembly used to lift pallets of materials (e.g.
refractory, mortar) had one of the two lifting bars bent
significantly creating a potential safety hazard, observed July
31, 1989.
b) Sheet and Tin Division
1) Roll Shop #1 - The homemade spindle lifting device was not tested
before it was used to hoist 200 pound rolls onto the lathe,.
observed August 7, 1989.
2) C Hooks are used to hoist coils of steel weighing from several
pounds to 50,000 pounds. Numerous nuts were found to be loose on
the plates or lifting eye. Failure of these securing devices could
cause the load to drop 20-30 feet, observed June 28, 1989.
Among other methods, one feasible and acceptable abatement method to
correct this hazard is to implement a below-the-hook lifting device
safety program as described in ANSI B30.20-1985. This program should,
at a minimum, include:
1) Marking, construction, and installation;
2) Inspection, testing, and maintenance; and,
3) Operation requirements for structural/mechanical and remotely
operated lifting devices, etc.
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

1910.22 B01

Serious Gravity 06 1 instance 400 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.23 A01

Serious Gravity 04 2 instances 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.23 A02

Serious Gravity 05 1 instance 10 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $500 · Current $250 Reduced
Recent events (2)
  • · F (S) $250.00
  • · Z (S) $500.00

1910.23 A03

Serious Gravity 05 4 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $700 · Current $350 Reduced
Recent events (2)
  • · F (S) $350.00
  • · Z (S) $700.00

1910.23 A05

Serious Gravity 06 5 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.23 A06

Serious Gravity 06 1 instance 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.23 A07

Serious Gravity 07 6 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $900 · Current $450 Reduced
Recent events (2)
  • · F (S) $450.00
  • · Z (S) $900.00

1910.23 A08

Serious Gravity 08 2 instances 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $400 Reduced
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

1910.23 B01 I

Serious Gravity 03 6 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $700 · Current $350 Reduced
Recent events (2)
  • · F (S) $350.00
  • · Z (S) $700.00

1910.23 C01

Serious Gravity 09 23 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $900 · Current $450 Reduced
Recent events (2)
  • · F (S) $450.00
  • · Z (S) $900.00

1910.23 D01 III

Serious Gravity 04 1 instance 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $400 · Current $200 Reduced
Recent events (2)
  • · F (S) $200.00
  • · Z (S) $400.00

1910.23 E03 IV

Serious Gravity 04 1 instance 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $400 · Current $200 Reduced
Recent events (2)
  • · F (S) $200.00
  • · Z (S) $400.00

1910.24 B

Serious Gravity 04 2 instances 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $400 Reduced
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

1910.24 D

Serious Gravity 05 1 instance 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $500 · Current $250 Reduced
Recent events (2)
  • · F (S) $250.00
  • · Z (S) $500.00

1910.24 F

Serious Gravity 05 1 instance 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $500 · Current $250 Reduced
Recent events (2)
  • · F (S) $250.00
  • · Z (S) $500.00

1910.24 H

Serious Gravity 03 1 instance 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $300 · Current $150 Reduced
Recent events (2)
  • · F (S) $150.00
  • · Z (S) $300.00

1910.25 D01 X

Serious Gravity 04 14 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $700 · Current $350 Reduced
Recent events (2)
  • · F (S) $350.00
  • · Z (S) $700.00

1910.25 D02 I

Serious Gravity 03 1 instance 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $300 · Current $150 Reduced
Recent events (2)
  • · F (S) $150.00
  • · Z (S) $300.00

1910.26 C02 VII

Serious Gravity 04 9 instances 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $500 · Current $250 Reduced
Recent events (2)
  • · F (S) $250.00
  • · Z (S) $500.00

1910.27 B01 II

Serious Gravity 04 5 instances 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $400 Reduced
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

1910.27 F

Serious Gravity 06 6 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.27 D02

Serious Gravity 07 2 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $400 Reduced
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

1910.28 A01

Serious Gravity 06 4 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $400 Reduced
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

1910.28 A04

Deleted Serious Gravity 07 1 instance 400 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $700 · Current $700
Recent events (2)
  • · F (S) $700.00
  • · Z (S) $700.00

1910.28 A12

Deleted Serious Gravity 07 1 instance 400 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $700 · Current $700
Recent events (2)
  • · F (S) $700.00
  • · Z (S) $700.00

1910.28 D07

Serious Gravity 07 1 instance 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $700 · Current $350 Reduced
Recent events (2)
  • · F (S) $350.00
  • · Z (S) $700.00

1910.28 N08

Serious Gravity 08 2 instances 400 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $400 Reduced
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

1910.29 A02 IIB

Serious Gravity 06 1 instance 800 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.29 A03 V

Serious Gravity 05 2 instances 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $500 · Current $250 Reduced
Recent events (2)
  • · F (S) $250.00
  • · Z (S) $500.00

1910.29 A03 VII

Serious Gravity 05 1 instance 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $500 · Current $250 Reduced
Recent events (2)
  • · F (S) $250.00
  • · Z (S) $500.00

1910.29 A04 II

Serious Gravity 06 2 instances 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.36 B02

Serious Gravity 08 1 instance 800 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $400 Reduced
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

1910.36 B04

Serious Gravity 06 1 instance 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.36 B06

Serious Gravity 05 1 instance 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $500 · Current $250 Reduced
Recent events (2)
  • · F (S) $250.00
  • · Z (S) $500.00

1910.37 F02

Serious Gravity 07 1 instance 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $700 · Current $350 Reduced
Recent events (2)
  • · F (S) $350.00
  • · Z (S) $700.00

1910.37 F06

Serious Gravity 06 2 instances 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $400 Reduced
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

1910.37 H01

Serious Gravity 07 1 instance 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $700 · Current $400 Reduced
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $700.00

1910.37 Q01

Serious Gravity 08 6 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $400 Reduced
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

1910.37 Q05

Serious Gravity 10 1 instance 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $500 · Current $250 Reduced
Recent events (2)
  • · F (S) $250.00
  • · Z (S) $500.00

1910.106 B02 IVB

Serious Gravity 04 1 instance 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $400 · Current $200 Reduced
Recent events (2)
  • · F (S) $200.00
  • · Z (S) $400.00

1910.106 B02 IVG

Serious Gravity 07 1 instance 800 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $700 · Current $350 Reduced
Recent events (2)
  • · F (S) $350.00
  • · Z (S) $700.00

1910.106 B02 VC

Serious Gravity 07 1 instance 800 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $700 · Current $350 Reduced
Recent events (2)
  • · F (S) $350.00
  • · Z (S) $700.00

1910.106 D03 I

Serious Gravity 06 1 instance 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $700 · Current $350 Reduced
Recent events (2)
  • · F (S) $350.00
  • · Z (S) $700.00

1910.106 D03 II

Serious Gravity 05 1 instance 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $500 · Current $250 Reduced
Recent events (2)
  • · F (S) $250.00
  • · Z (S) $500.00

1910.106 D04 I

Deleted Serious Gravity 06 1 instance 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $600
Recent events (2)
  • · F (S) $600.00
  • · Z (S) $600.00

1910.106 D04 III

Serious Gravity 06 1 instance 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.106 D07 IA

Serious Gravity 06 1 instance 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.106 E02 II

Serious Gravity 05 1 instance 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.106 E02 IIB

Serious Gravity 05 4 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.106 E02 IIB

Serious Gravity 06 1 instance 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.106 E02 IVA

Serious Gravity 05 4 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.106 E02 IVD

Other-than-serious Gravity 06 10 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (O) $300.00
  • · Z (S) $600.00

1910.106 E02 IVD

Serious Gravity 06 1 instance 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Recent events (2)
  • · F (S)
  • · Z (S)

1910.106 E06 I

Serious Gravity 06 1 instance 800 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.106 E06 II

Serious Gravity 06 2 instances 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.106 E09 III

Serious Gravity 05 8 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.106 G03 IVD

Serious Gravity 06 2 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.108 C02 I

Serious Gravity 05 1 instance 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $500 · Current $250 Reduced
Recent events (2)
  • · F (S) $250.00
  • · Z (S) $500.00

1910.108 C05

Serious Gravity 05 1 instance 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $500 · Current $250 Reduced
Recent events (2)
  • · F (S) $250.00
  • · Z (S) $500.00

1910.109 B01

Serious Gravity 08 1 instance 6 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $400 Reduced
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

1910.109 C04 IV

Serious Gravity 06 1 instance 10 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Recent events (2)
  • · F (S)
  • · Z (S)

1910.109 C05 III

Serious Gravity 06 1 instance 400 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.109 C05 VII

Serious Gravity 06 2 instances 400 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.110 F02 I

Serious Gravity 04 1 instance 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $400 · Current $200 Reduced
Recent events (2)
  • · F (S) $200.00
  • · Z (S) $400.00

1910.110 F02 IIIB

Serious Gravity 04 1 instance 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $400 · Current $200 Reduced
Recent events (2)
  • · F (S) $200.00
  • · Z (S) $400.00

1910.145 C02 I

Serious Gravity 07 1 instance 800 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $700 · Current $350 Reduced
Recent events (2)
  • · F (S) $350.00
  • · Z (S) $700.00

1910.145 C03

Serious Gravity 09 2 instances 400 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $900 · Current $450 Reduced
Recent events (2)
  • · F (S) $450.00
  • · Z (S) $900.00

1910.157 C01

Serious Gravity 07 4 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $700 · Current $350 Reduced
Recent events (2)
  • · F (S) $350.00
  • · Z (S) $700.00

1910.157 C04

Serious Gravity 05 3 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $500 · Current $250 Reduced
Recent events (2)
  • · F (S) $250.00
  • · Z (S) $500.00

1910.157 C04

Serious Gravity 05 1 instance 400 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Recent events (2)
  • · F (S)
  • · Z (S)

1910.157 D04

Deleted Serious Gravity 05 1 instance 400 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $500 · Current $500
Recent events (2)
  • · F (S) $500.00
  • · Z (S) $500.00

1910.157 E02

Serious Gravity 05 11 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $700 · Current $350 Reduced
Recent events (2)
  • · F (S) $350.00
  • · Z (S) $700.00

1910.157 G02

Serious Gravity 06 12 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.176 B

Serious Gravity 04 1 instance 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $700 · Current $350 Reduced
Recent events (2)
  • · F (S) $350.00
  • · Z (S) $700.00

1910.176 B

Serious Gravity 07 2 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Recent events (2)
  • · F (S)
  • · Z (S)

1910.176 C

Serious Gravity 04 1 instance 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $400 · Current $200 Reduced
Recent events (2)
  • · F (S) $200.00
  • · Z (S) $400.00

1910.176 F

Serious Gravity 07 3 instances 600 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $900 · Current $450 Reduced
Recent events (2)
  • · F (S) $450.00
  • · Z (S) $900.00

1910.178 A06

Serious Gravity 04 1 instance 400 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $400 · Current $200 Reduced
Recent events (2)
  • · F (S) $200.00
  • · Z (S) $400.00

1910.178 G10

Serious Gravity 06 7 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.178 G11

Serious Gravity 04 1 instance 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $400 · Current $200 Reduced
Recent events (2)
  • · F (S) $200.00
  • · Z (S) $400.00

1910.178 K02

Deleted Serious Gravity 05 1 instance 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $500 · Current $500
Recent events (2)
  • · F (S) $500.00
  • · Z (S) $500.00

1910.178 L

Serious Gravity 02 5 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $400 Reduced
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

1910.178 M03

Serious Gravity 05 1 instance 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $500 · Current $250 Reduced
Recent events (2)
  • · F (S) $250.00
  • · Z (S) $500.00

1910.178 M05 I

Serious Gravity 06 1 instance 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.178 N04

Serious Gravity 08 1 instance 400 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $400 Reduced
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

1910.178 Q07

Serious Gravity 08 1 instance 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $400 Reduced
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

1910.179 L01

Serious Gravity 05 5 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $500 · Current $250 Reduced
Recent events (2)
  • · F (S) $250.00
  • · Z (S) $500.00

1910.179 L02 II

Deleted Serious Gravity 04 88 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $1,000 · Current $1,000
Recent events (2)
  • · F (S) $1000.00
  • · Z (S) $1000.00

1910.179 L03 III

Serious Gravity 05 28 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $1,000 · Current $500 Reduced
Recent events (2)
  • · F (S) $500.00
  • · Z (S) $1000.00

1910.180 B02

Deleted Serious Gravity 06 2 instances 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $1,000 · Current $1,000
Recent events (2)
  • · F (S) $1000.00
  • · Z (S) $1000.00

1910.180 B02

Deleted Serious Gravity 06 7 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Recent events (2)
  • · F (S)
  • · Z (S)

1910.180 B02

Serious Gravity 06 3 instances 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Current $500
Recent events (2)
  • · F (S) $500.00
  • · Z (S)

1910.180 B02

Serious Gravity 08 1 instance 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Recent events (2)
  • · F (S)
  • · Z (S)

1910.180 B02

Serious Gravity 06 1 instance 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Recent events (2)
  • · F (S)
  • · Z (S)

1910.180 B02

Deleted Serious Gravity 06 2 instances 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Recent events (2)
  • · F (S)
  • · Z (S)

1910.180 B02

Deleted Serious Gravity 09 1 instance 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Recent events (2)
  • · F (S)
  • · Z (S)

1910.180 D03 VII

Serious Gravity 07 3 instances 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $400 Reduced
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

1910.180 D04

Deleted Serious Gravity 06 2 instances 700 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $600
Recent events (2)
  • · F (S) $600.00
  • · Z (S) $600.00

1910.180 H03 IV

Serious Gravity 06 3 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $400 Reduced
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

1910.180 I03 II

Serious Gravity 08 1 instance 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $400 Reduced
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

1910.184 C01

Serious Gravity 08 3 instances 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $400 Reduced
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

1910.184 C02

Serious Gravity 08 2 instances 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $400 Reduced
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

1910.184 C07

Serious Gravity 06 4 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $400 Reduced
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

1910.184 D

Serious Gravity 07 3 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 6, 1989
Penalty
Initial $800 · Current $400 Reduced
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

1910.184 E02 II

Serious Gravity 07 10 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $700 · Current $350 Reduced
Recent events (2)
  • · F (S) $350.00
  • · Z (S) $700.00

1910.184 E04

Serious Gravity 04 38 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $700 · Current $350 Reduced
Recent events (2)
  • · F (S) $350.00
  • · Z (S) $700.00

1910.184 E07 I

Serious Gravity 08 3 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $400 Reduced
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

1910.184 E09 I

Serious Gravity 08 4 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $400 Reduced
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

1910.184 E09 II

Serious Gravity 08 2 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $800 · Current $400 Reduced
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $800.00

1910.184 F05 I

Serious Gravity 04 6 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.184 F05 III

Serious Gravity 06 6 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $700 · Current $350 Reduced
Recent events (2)
  • · F (S) $350.00
  • · Z (S) $700.00

1910.184 F05 VII

Serious Gravity 07 1 instance 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $700 · Current $350 Reduced
Recent events (2)
  • · F (S) $350.00
  • · Z (S) $700.00

1910.184 I01

Serious Gravity 06 2 instances 600 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.184 I09 III

Serious Gravity 05 4 instances 999 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.212 A02

Serious Gravity 07 1 instance 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $700 · Current $350 Reduced
Recent events (2)
  • · F (S) $350.00
  • · Z (S) $700.00

1910.212 A03 II

Serious Gravity 07 13 instances 300 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $900 · Current $450 Reduced
Recent events (2)
  • · F (S) $450.00
  • · Z (S) $900.00

1910.212 A04

Serious Gravity 06 2 instances 900 exposed
Issued
Nov 2, 1989
Abate by
Dec 2, 1989
Penalty
Initial $700 · Current $350 Reduced
Recent events (2)
  • · F (S) $350.00
  • · Z (S) $700.00

View U.S. Steel Corp.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 18252858.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.