HARRISVILLE, RI ·
OSHA Inspection: EBASCO CONSTRUCTORS
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of EBASCO CONSTRUCTORS in POWER PLANT, ROUTE 98, HARRISVILLE, RI 02830 (NAICS 000000). OSHA activity number 18262089.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- EBASCO CONSTRUCTORS
- Site address
- POWER PLANT, ROUTE 98
- City
- HARRISVILLE
- State
- RI
- ZIP
- 02830
- Mailing
- P.O. BOX 611, HARRISVILLE, RI 02830
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Union (A)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 1629
- Employees
- 430
- Ownership type
- Private (A)
- Industry flags
- Construction safety.
Citations
31 citations on file for this inspection.
5(a)(1)
- Issued
- May 8, 1990
- Abate by
- May 15, 1990
- Penalty
- Initial $600 · Current $300 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees: a) Jobsite: Employees were exposed to the hazard of impalement from unprotected vertically-protruding reinforcing steel bars used as grade stakes and barrier guards.
Recent events (2)
- · I (S) $300.00
- · Z (S) $600.00
1926.25 A
- Issued
- May 8, 1990
- Abate by
- May 25, 1990
- Penalty
- Initial $400 · Current $200 Reduced
Recent events (2)
- · I (S) $200.00
- · Z (S) $400.00
1926.59 G08
- Issued
- May 8, 1990
- Abate by
- May 18, 1990
- Penalty
- Initial $300 · Current $150 Reduced
Recent events (2)
- · I (S) $150.00
- · Z (S) $300.00
1926.152 A01
- Issued
- May 8, 1990
- Abate by
- May 14, 1990
- Penalty
- Initial $200 · Current $100 Reduced
Recent events (2)
- · I (S) $100.00
- · Z (S) $200.00
1926.303 B
- Issued
- May 8, 1990
- Abate by
- May 15, 1990
- Penalty
- Initial $300 · Current $150 Reduced
Recent events (2)
- · I (S) $150.00
- · Z (S) $300.00
1926.303 C02
- Issued
- May 8, 1990
- Abate by
- May 15, 1990
Recent events (2)
- · I (S)
- · Z (S)
1926.350 A01
- Issued
- May 8, 1990
- Abate by
- May 15, 1990
- Penalty
- Initial $500 · Current $250 Reduced
Recent events (2)
- · I (S) $250.00
- · Z (S) $500.00
1926.350 A09
- Issued
- May 8, 1990
- Abate by
- May 15, 1990
Recent events (2)
- · I (S)
- · Z (S)
1926.350 J
- Issued
- May 8, 1990
- Abate by
- May 15, 1990
Recent events (2)
- · I (S)
- · Z (S)
1926.404 B01 IIIB
- Issued
- May 8, 1990
- Abate by
- May 18, 1990
- Penalty
- Initial $1,000 · Current $500 Reduced
Recent events (2)
- · I (S) $500.00
- · Z (S) $1000.00
1926.404 B01 IIIC
- Issued
- May 8, 1990
- Abate by
- May 18, 1990
Recent events (2)
- · I (S)
- · Z (S)
1926.404 B01 IIID
- Issued
- May 8, 1990
- Abate by
- May 18, 1990
Recent events (2)
- · I (S)
- · Z (S)
1926.404 F06
- Issued
- May 8, 1990
- Abate by
- May 14, 1990
- Penalty
- Initial $300 · Current $150 Reduced
Recent events (2)
- · I (S) $150.00
- · Z (S) $300.00
1926.405 A02 IIA
- Issued
- May 8, 1990
- Abate by
- May 18, 1990
- Penalty
- Initial $700 · Current $350 Reduced
Recent events (2)
- · I (S) $350.00
- · Z (S) $700.00
1926.405 A02 IIE
- Issued
- May 8, 1990
- Abate by
- May 18, 1990
- Penalty
- Initial $400 · Current $200 Reduced
Recent events (2)
- · I (S) $200.00
- · Z (S) $400.00
1926.405 A02 IIF
- Issued
- May 8, 1990
- Abate by
- May 18, 1990
Recent events (2)
- · I (S)
- · Z (S)
1926.405 B01
- Issued
- May 8, 1990
- Abate by
- May 14, 1990
- Penalty
- Initial $300 · Current $150 Reduced
Recent events (2)
- · I (S) $150.00
- · Z (S) $300.00
1926.450 A01
- Issued
- May 8, 1990
- Abate by
- May 11, 1990
- Penalty
- Initial $400 · Current $200 Reduced
Recent events (2)
- · I (S) $200.00
- · Z (S) $400.00
1926.451 D10
- Issued
- May 8, 1990
- Abate by
- May 14, 1990
- Penalty
- Initial $300 · Current $150 Reduced
Recent events (2)
- · I (S) $150.00
- · Z (S) $300.00
1926.500 B01
- Issued
- May 8, 1990
- Abate by
- May 15, 1990
- Penalty
- Initial $600 · Current $300 Reduced
Recent events (2)
- · I (S) $300.00
- · Z (S) $600.00
1926.500 D01
- Issued
- May 8, 1990
- Abate by
- May 14, 1990
- Penalty
- Initial $500 · Current $250 Reduced
Recent events (2)
- · I (S) $250.00
- · Z (S) $500.00
1926.500 D01
- Issued
- May 8, 1990
- Abate by
- May 15, 1990
- Penalty
- Initial $300 · Current $150 Reduced
Recent events (2)
- · I (S) $150.00
- · Z (S) $300.00
1926.556 B02 V
- Issued
- May 8, 1990
- Abate by
- May 14, 1990
- Penalty
- Initial $500 · Current $250 Reduced
Recent events (2)
- · I (S) $250.00
- · Z (S) $500.00
1926.651 L02
- Issued
- May 8, 1990
- Abate by
- May 14, 1990
- Penalty
- Initial $600 · Current $300 Reduced
Recent events (2)
- · I (S) $300.00
- · Z (S) $600.00
5(a)(1)
- Issued
- May 8, 1990
- Abate by
- May 14, 1990
- Penalty
- Initial $1,000 · Current $500 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees: a) Jobsite: Employees were exposed to uncontrolled loads during hoisting or rebar, scaffold planking, and welding shields. One feasible and acceptable abatement method would be the establishment of a work rule requiring the use of tag lines during hoisting operations. EBASCO was previously cited for a violation of this Occupational Safety and Health standard 5(a)(1) which was contained in OSHA inspection numbe r 18259655 citation number 1, item number 1, issued on 10/23/89.
Recent events (2)
- · I (R) $500.00
- · Z (R) $1000.00
1926.59 F05
- Issued
- May 8, 1990
- Abate by
- May 14, 1990
- Penalty
- Initial $400 · Current $200 Reduced
Recent events (2)
- · I (R) $200.00
- · Z (R) $400.00
1926.403 I02 I
- Issued
- May 8, 1990
- Abate by
- May 14, 1990
- Penalty
- Initial $1,400 · Current $700 Reduced
Recent events (2)
- · I (R) $700.00
- · Z (R) $1400.00
1926.403 I02 II
- Issued
- May 8, 1990
- Abate by
- May 14, 1990
- Penalty
- Initial $800 · Current $400 Reduced
Recent events (2)
- · I (R) $400.00
- · Z (R) $800.00
1926.405 A02 IIII
- Issued
- May 8, 1990
- Abate by
- May 14, 1990
- Penalty
- Initial $800 · Current $400 Reduced
Recent events (2)
- · I (R) $400.00
- · Z (R) $800.00
1926.601 B04
- Issued
- May 8, 1990
- Abate by
- May 14, 1990
- Penalty
- Initial $800 · Current $400 Reduced
Recent events (2)
- · I (R) $400.00
- · Z (R) $800.00
1926.20 B03
- Issued
- May 8, 1990
- Abate by
- May 15, 1990
Recent events (2)
- · I (O)
- · Z (O)
More inspections at Ebasco Constructors
View Ebasco Constructors's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in RI
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 18262089.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.