Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: CONTROL POWER SYSTEMS INC.

Special Programs inspection · Safety discipline

On , OSHA opened a special Programs safety inspection of CONTROL POWER SYSTEMS INC. in 1010 E. 31 ST., HIALEAH, FL 33013 (NAICS 000000). OSHA activity number 18397679.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Control Power Systems INC. — free Get an email when a new federal OSHA severe-injury report for Control Power Systems INC. is published. One employer, no account, unsubscribe in one click.
Site address
1010 E. 31 ST.
City
HIALEAH
State
FL
ZIP
33013
Inspection type
Special Programs (K)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
3825
Employees
65
Ownership type
A

17 citations on file for this inspection.

1910.23 C01

Serious Gravity 02 1 instance 2 exposed
Issued
Oct 5, 1989
Abate by
Oct 23, 1989
Penalty
Initial $140 · Current $140

1910.23 D01 III

Serious Gravity 02 1 instance 2 exposed
Issued
Oct 5, 1989
Abate by
Oct 23, 1989

1910.37 Q01

Serious Gravity 02 2 instances 25 exposed
Issued
Oct 5, 1989
Abate by
Oct 16, 1989
Penalty
Initial $140 · Current $140

1910.37 Q02

Serious Gravity 02 2 instances 25 exposed
Issued
Oct 5, 1989
Abate by
Oct 16, 1989

1910.215 A02

Serious Gravity 02 1 instance 1 exposed
Issued
Oct 5, 1989
Abate by
Oct 19, 1989
Penalty
Initial $140 · Current $140

1910.215 A04

Serious Gravity 02 1 instance 1 exposed
Issued
Oct 5, 1989
Abate by
Oct 19, 1989

1910.304 A02

Serious Gravity 07 1 instance 17 exposed
Issued
Oct 5, 1989
Abate by
Oct 19, 1989
Penalty
Initial $350 · Current $350

1910.305 G01 III

Serious Gravity 05 1 instance 25 exposed
Issued
Oct 5, 1989
Abate by
Oct 19, 1989

1910.305 B01

Serious Gravity 03 2 instances 1 exposed
Issued
Oct 5, 1989
Abate by
Oct 16, 1989
Penalty
Initial $280 · Current $280

1910.305 B02

Serious Gravity 04 1 instance 3 exposed
Issued
Oct 5, 1989
Abate by
Oct 19, 1989

1910.1200 E01

Serious Gravity 04 1 instance 25 exposed
Issued
Oct 5, 1989
Abate by
Nov 8, 1989
Penalty
Initial $280 · Current $280

1910.1200 F05 I

Serious Gravity 04 1 instance 25 exposed
Issued
Oct 5, 1989
Abate by
Nov 8, 1989

1910.1200 F05 II

Serious Gravity 04 1 instance 25 exposed
Issued
Oct 5, 1989
Abate by
Nov 8, 1989

1910.1200 H

Serious Gravity 04 1 instance 25 exposed
Issued
Oct 5, 1989
Abate by
Nov 8, 1989

1903.2 A01

Other-than-serious Gravity 00 1 instance 25 exposed
Issued
Oct 5, 1989
Abate by
Oct 10, 1989

1904.2 A

Other-than-serious Gravity 00 1 instance 25 exposed
Issued
Oct 5, 1989
Abate by
Oct 16, 1989

1910.303 F

Other-than-serious Gravity 02 1 instance 25 exposed
Issued
Oct 5, 1989
Abate by
Oct 16, 1989

View Control Power Systems INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 18397679.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.