Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,195,903Inspections Most recent open 2026-08-18 Last loaded 2026-08-21

OSHA Inspection: COLUMBIA MACHINE INC

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of COLUMBIA MACHINE INC in E RT 316 PO BOX 84, Mattoon, IL 61938 (NAICS 000000). OSHA activity number 214724353.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Columbia Machine INC for free Get an email when a new federal OSHA severe-injury report for Columbia Machine INC is published. One employer, no account, unsubscribe in one click.
Site address
E RT 316 PO BOX 84
City
Mattoon
State
IL
ZIP
61938
Inspection type
Complaint (B)
Scope
Complete (A)
Discipline
Safety
Union status
Non-union (B)
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
3559
Employees
124

39 citations on file for this inspection.

1910.179 L03 III

Other-than-serious 2 instances
Issued
Mar 20, 1974
Abate by
Mar 22, 1974
Penalty
Initial $35 · Current $35

1910.242 A

Other-than-serious 2 instances
Issued
Mar 20, 1974
Abate by
Apr 20, 1974

1910.309 A 004005

Other-than-serious 1 instance
Issued
Mar 20, 1974
Abate by
Mar 22, 1974

1910.252 A02 IV

Other-than-serious 1 instance
Issued
Mar 20, 1974
Abate by
Mar 22, 1974

1910.212 A01

Other-than-serious 2 instances
Issued
Mar 20, 1974
Abate by
Jun 1, 1974

1910.106 D04 I

Other-than-serious 1 instance
Issued
Mar 20, 1974
Abate by
Jul 1, 1974
Penalty
Initial $70 · Current $70

1910.106 D04 III

Other-than-serious 3 instances
Issued
Mar 20, 1974
Abate by
Jul 1, 1974
Penalty
Initial $70 · Current $70

1910.106 D04 IV

Other-than-serious 1 instance
Issued
Mar 20, 1974
Abate by
Jul 1, 1974
Penalty
Initial $35 · Current $35

1910.106 E06 I

Other-than-serious 1 instance
Issued
Mar 20, 1974
Abate by
Mar 22, 1974
Penalty
Initial $70 · Current $70

1910.22 B01

Other-than-serious 1 instance
Issued
Mar 20, 1974
Abate by
Mar 22, 1974

1910.94 C02

Other-than-serious 1 instance
Issued
Mar 20, 1974
Abate by
Mar 22, 1974
Penalty
Initial $35 · Current $35

1910.178 C02 III

Other-than-serious 1 instance
Issued
Mar 20, 1974
Abate by
Mar 22, 1974
Penalty
Initial $35 · Current $35

1910.107 G02

Other-than-serious 2 instances
Issued
Mar 20, 1974
Abate by
Jul 1, 1974
Penalty
Initial $35 · Current $35

1910.107 C02

Other-than-serious 2 instances
Issued
Mar 20, 1974
Abate by
Apr 20, 1974
Penalty
Initial $105 · Current $105

1910.107 B05 I

Other-than-serious 1 instance
Issued
Mar 20, 1974
Abate by
Mar 22, 1974

1910.107 D06

Other-than-serious 1 instance
Issued
Mar 20, 1974
Abate by
Oct 1, 1974
Penalty
Initial $35 · Current $35

1910.107 E09

Other-than-serious 6 instances
Issued
Mar 20, 1974
Abate by
Oct 1, 1974

1910.106 E02 IV

Other-than-serious 6 instances
Issued
Mar 20, 1974
Abate by
Apr 20, 1974

1910.107 A05

Other-than-serious 1 instance
Issued
Mar 20, 1974
Abate by
Apr 20, 1974

1910.179 G01 IV

Other-than-serious 1 instance
Issued
Mar 20, 1974
Abate by
Oct 1, 1974

1910.179 L03 III

Other-than-serious 2 instances
Issued
Mar 20, 1974
Abate by
Apr 20, 1974

1910.179 F04 VII

Other-than-serious 2 instances
Issued
Mar 20, 1974
Abate by
Aug 1, 1974
Penalty
Initial $35 · Current $35

1910.179 E02

Other-than-serious 2 instances
Issued
Mar 20, 1974
Abate by
Aug 1, 1974

1910.176 A

Other-than-serious 1 instance
Issued
Mar 20, 1974
Abate by
Apr 20, 1974

1910.22 B02

Other-than-serious 1 instance
Issued
Mar 20, 1974
Abate by
Jun 1, 1974

1910.179 B08

Other-than-serious 1 instance
Issued
Mar 20, 1974
Abate by
Apr 20, 1974

1910.25 D01 X

Other-than-serious 1 instance
Issued
Mar 20, 1974
Abate by
Mar 22, 1974

1910.215 B09

Other-than-serious 4 instances
Issued
Mar 20, 1974
Abate by
Apr 20, 1974

1910.215 A02

Other-than-serious 3 instances
Issued
Mar 20, 1974
Abate by
Jun 1, 1974

1910.215 A04

Other-than-serious 2 instances
Issued
Mar 20, 1974
Abate by
Jun 1, 1974

1910.252 E03 I

Other-than-serious 2 instances
Issued
Mar 20, 1974
Abate by
Apr 20, 1974

1910.176 B

Other-than-serious 1 instance
Issued
Mar 20, 1974
Abate by
Jun 1, 1974
Penalty
Initial $35 · Current $35

1910.37 Q01

Other-than-serious 6 instances
Issued
Mar 20, 1974
Abate by
Apr 20, 1974

1910.219 D01

Other-than-serious 3 instances
Issued
Mar 20, 1974
Abate by
Jun 1, 1974
Penalty
Initial $35 · Current $35

1910.309 A 025045

Other-than-serious 4 instances
Issued
Mar 20, 1974
Abate by
Mar 22, 1974
Penalty
Initial $70 · Current $70

1910.244 B

Other-than-serious 1 instance
Issued
Mar 20, 1974
Abate by
Jun 1, 1974
Penalty
Initial $35 · Current $35

1910.213 H01

Other-than-serious 1 instance
Issued
Mar 20, 1974
Abate by
Jun 1, 1974
Penalty
Initial $35 · Current $35

1910.213 H04

Other-than-serious 1 instance
Issued
Mar 20, 1974
Abate by
Apr 20, 1974

1910.178 L

Other-than-serious 1 instance
Issued
Mar 20, 1974
Abate by
Oct 10, 1974

View Columbia Machine INC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 214724353.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.