DELRAY BEACH, FL ·
OSHA Inspection: DAVID JONES BUILDER INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of DAVID JONES BUILDER INC. in 7563 GLENDOREN LANE, DELRAY BEACH, FL 33336 (NAICS 000000). OSHA activity number 2454833.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- DAVID JONES BUILDER INC.
- Site address
- 7563 GLENDOREN LANE
- City
- DELRAY BEACH
- State
- FL
- ZIP
- 33336
- Mailing
- 6064 VISTA LANE, BOCA RATON, FL 33432
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 1522
- Employees
- 8
- Ownership type
- Private (A)
- Industry flags
- Construction safety.
Citations
5 citations on file for this inspection.
5(a)(1)
- Issued
- Dec 2, 1985
- Abate by
- Dec 5, 1985
- Penalty
- Initial $200 · Current $100 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious harm to employees in that employees were exposed to: a) On or about October 10, 1985, employees were exposed to hazard of being struck by falling trusses and crushing injuries at building no. 13, west, Gleneagle Development located at or about 7563 Glendoren Lane, Delray Beach, Florida 33336. On October 10, 1985, trusses were overburdened when plywood sheeting was loaded on top chords. Bracing through chords, lateral and cross bracing, was not provided. Among other methods, feasible and acceptable abatement methods to correct this hazard would be: 1) Ensure that bundles of sheeting are broken down and/or placed on adequate load bearing members. 2) Ensure that lateral and cross bracing are carried out according to procedures as the job progresses. 3) Ensure the TPI 76 Commentary and Recommendations for truss erection is in possession of site foreman.
Recent events (2)
- · I (S) $100.00
- · Z (S) $200.00
1926.100 A
- Issued
- Dec 2, 1985
- Abate by
- Dec 5, 1985
- Penalty
- Initial $120 · Current $60 Reduced
Recent events (2)
- · I (S) $60.00
- · Z (S) $120.00
1926.500 D01
- Issued
- Dec 2, 1985
- Abate by
- Dec 5, 1985
- Penalty
- Initial $200 · Current $100 Reduced
Recent events (2)
- · I (S) $100.00
- · Z (S) $200.00
1926.500 E01 II
- Issued
- Dec 2, 1985
- Abate by
- Dec 5, 1985
- Penalty
- Initial $120 · Current $60 Reduced
Recent events (2)
- · I (S) $60.00
- · Z (S) $120.00
1926.700 B02
- Issued
- Dec 2, 1985
- Abate by
- Dec 5, 1985
- Penalty
- Initial $160 · Current $80 Reduced
Recent events (2)
- · I (S) $80.00
- · Z (S) $160.00
More inspections at David Jones Builder INC.
View David Jones Builder INC.'s full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in FL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA's own view of this case can be found through its Establishment Search.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.