NEW BRITAIN, CT —
OSHA Inspection: CONNECTICUT STAMPING AND BENDING COMPANY
Unprogrammed Related inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Related safety inspection of CONNECTICUT STAMPING AND BENDING COMPANY in 206 NEWINGTON AVENUE, NEW BRITAIN, CT 06050 (NAICS 000000). OSHA activity number 300087731.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- CONNECTICUT STAMPING AND BENDING COMPANY
- Site address
- 206 NEWINGTON AVENUE
- City
- NEW BRITAIN
- State
- CT
- ZIP
- 06050
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3498
- Employees
- 180
- Ownership type
- A
Citations
43 citations on file for this inspection.
5(a)(1)
- Issued
- Jun 20, 2002
- Abate by
- Jun 25, 2002
- Penalty
- Initial $2,000 · Current $1,600 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to fire and explosion hazards: A.HAND SOLDERING STATION: A FLASH ARRESTOR/BACKFLOW PREVENTER WAS NOT PROVIDED ON THE GAS/AIR PIPING THAT SUPPLIED TWO HAND SOLDER TORCHES. AMONG OTHER METHODS, ONE FEASIBLE AND ACCEPTABLE ABATEMENT METHOD TO CORRECT THIS HAZARD IS TO: 1.INSTALL A PROPER FLASH ARRESTOR/BACK FLOW DEVICE ON ALL GAS/AIR MIXTURE PIPING, AS CLOSE TO THE OUTLET AS POSSIBLE. 2.IMPLEMENT A PROGRAM OF REGULAR INSPECTIONS OF ALL GAS PIPING PROTECTIVE DEVICES TO ENSURE PROPER WORKING ORDER. ABATEMENT DOCUMENTATION IS NOT REQUIRED
Recent events (2)
- — I (S) $1600.00
- — Z (S) $2000.00
5(a)(1)
- Issued
- Jun 20, 2002
- Abate by
- Aug 7, 2002
- Penalty
- Initial $2,800 · Current $2,240 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to falling plating racks and falling die sets: A.PLATING LINE #1: THE WIRE ROPE PROVIDED ON THE R+M HOIST WAS RUSTED, CRUSHED AND DAMAGED. THE CHAIN PROVIDED ON THE CM LODESTAR HOIST WAS SCRAPED AND GOUGED. B.PRESS ROOM: THE WIRE ROPE ON A TAN DIE CART WAS FRAYED AND SEVERAL STRANDS HAD COMPLETELY BROKEN THROUGH. AMONG OTHER METHODS, ONE FEASIBLE AND ACCEPTABLE ABATEMENT METHOD TO CORRECT THIS HAZARD IS TO HAVE A QUALIFIED PERSON CONDUCT REGULAR (MONTHLY) INSPECTIONS OF HOIST EQUIPMENT AND MAKE REPAIRS AS NEEDED. SPECIFIC ABATEMENT DOCUMENTATION IS REQUIRED
Recent events (2)
- — I (S) $2240.00
- — Z (S) $2800.00
1910.23 A04
- Issued
- Jun 20, 2002
- Abate by
- Aug 7, 2002
- Penalty
- Initial $2,000 · Current $1,600 Reduced
Recent events (2)
- — I (S) $1600.00
- — Z (S) $2000.00
1910.23 C01
- Issued
- Jun 20, 2002
- Abate by
- Aug 7, 2002
Recent events (2)
- — I (S)
- — Z (S)
1910.24 F
- Issued
- Jun 20, 2002
- Abate by
- May 31, 2002
- Penalty
- Initial $1,020 · Current $816 Reduced
Recent events (2)
- — I (S) $816.00
- — Z (S) $1020.00
1910.36 B05
- Issued
- Jun 20, 2002
- Abate by
- Aug 7, 2002
- Penalty
- Initial $1,200 · Current $960 Reduced
Recent events (2)
- — I (S) $960.00
- — Z (S) $1200.00
1910.37 Q02
- Issued
- Jun 20, 2002
- Abate by
- Aug 7, 2002
Recent events (2)
- — I (S)
- — Z (S)
1910.176 B
- Issued
- Jun 20, 2002
- Abate by
- Aug 7, 2002
- Penalty
- Initial $1,200 · Current $960 Reduced
Recent events (2)
- — I (S) $960.00
- — Z (S) $1200.00
1910.184 I09 III
- Issued
- Jun 20, 2002
- Abate by
- May 7, 2002
- Penalty
- Initial $1,020 · Current $816 Reduced
Recent events (2)
- — I (S) $816.00
- — Z (S) $1020.00
1910.212 A01
- Issued
- Jun 20, 2002
- Abate by
- Sep 3, 2002
- Penalty
- Initial $5,600 · Current $4,480 Reduced
Recent events (2)
- — I (S) $4480.00
- — Z (S) $5600.00
1910.212 A03 II
- Issued
- Jun 20, 2002
- Abate by
- Sep 3, 2002
- Penalty
- Initial $4,000 · Current $3,200 Reduced
Recent events (2)
- — I (S) $3200.00
- — Z (S) $4000.00
1910.212 A04
- Issued
- Jun 20, 2002
- Abate by
- Sep 3, 2002
- Penalty
- Initial $1,200 · Current $960 Reduced
Recent events (2)
- — I (S) $960.00
- — Z (S) $1200.00
1910.215 A01
- Issued
- Jun 20, 2002
- Abate by
- Jun 25, 2002
- Penalty
- Initial $1,600 · Current $1,280 Reduced
Recent events (2)
- — I (S) $1280.00
- — Z (S) $1600.00
1910.215 A02
- Issued
- Jun 20, 2002
- Abate by
- Jun 25, 2002
Recent events (2)
- — I (S)
- — Z (S)
1910.215 B05
- Issued
- Jun 20, 2002
- Abate by
- Jun 25, 2002
Recent events (2)
- — I (S)
- — Z (S)
1910.215 B09
- Issued
- Jun 20, 2002
- Abate by
- Jun 25, 2002
Recent events (2)
- — I (S)
- — Z (S)
1910.217 B03 I
- Issued
- Jun 20, 2002
- Abate by
- Aug 7, 2002
- Penalty
- Initial $1,600 · Current $1,280 Reduced
Recent events (2)
- — I (S) $1280.00
- — Z (S) $1600.00
1910.217 B04 II
- Issued
- Jun 20, 2002
- Abate by
- Aug 7, 2002
Recent events (2)
- — I (S)
- — Z (S)
1910.217 B04 III
- Issued
- Jun 20, 2002
- Abate by
- Sep 3, 2002
Recent events (2)
- — I (S)
- — Z (S)
1910.217 B06 I
- Issued
- Jun 20, 2002
- Abate by
- Aug 7, 2002
- Penalty
- Initial $2,000 · Current $1,600 Reduced
Recent events (2)
- — I (S) $1600.00
- — Z (S) $2000.00
1910.217 C03 VIIIC
- Issued
- Jun 20, 2002
- Abate by
- Sep 3, 2002
Recent events (2)
- — I (S)
- — Z (S)
1910.217 C01 I
- Issued
- Jun 20, 2002
- Abate by
- Sep 3, 2002
- Penalty
- Initial $4,000 · Current $3,200 Reduced
Recent events (2)
- — I (S) $3200.00
- — Z (S) $4000.00
1910.217 C02 IA
- Issued
- Jun 20, 2002
- Abate by
- Sep 3, 2002
Recent events (2)
- — I (S)
- — Z (S)
1910.217 C03 IVD
- Issued
- Jun 20, 2002
- Abate by
- Aug 7, 2002
- Penalty
- Initial $4,000 · Current $3,200 Reduced
Recent events (2)
- — I (S) $3200.00
- — Z (S) $4000.00
1910.217 E01 I
- Issued
- Jun 20, 2002
- Abate by
- Aug 7, 2002
- Penalty
- Initial $1,200 · Current $960 Reduced
Recent events (2)
- — I (S) $960.00
- — Z (S) $1200.00
1910.217 E01 II
- Issued
- Jun 20, 2002
- Abate by
- Aug 7, 2002
Recent events (2)
- — I (S)
- — Z (S)
1910.219 D01
- Issued
- Jun 20, 2002
- Abate by
- May 31, 2002
- Penalty
- Initial $1,020 · Current $816 Reduced
Recent events (2)
- — I (S) $816.00
- — Z (S) $1020.00
1910.219 E01 I
- Issued
- Jun 20, 2002
- Abate by
- May 31, 2002
Recent events (2)
- — I (S)
- — Z (S)
1910.219 E03 I
- Issued
- Jun 20, 2002
- Abate by
- May 31, 2002
Recent events (2)
- — I (S)
- — Z (S)
1910.303 G02 I
- Issued
- Jun 20, 2002
- Abate by
- Jun 25, 2002
- Penalty
- Initial $1,600 · Current $1,280 Reduced
Recent events (2)
- — I (S) $1280.00
- — Z (S) $1600.00
1910.304 A02
- Issued
- Jun 20, 2002
- Abate by
- May 31, 2002
- Penalty
- Initial $1,020 · Current $816 Reduced
Recent events (2)
- — I (S) $816.00
- — Z (S) $1020.00
1910.305 A01 I
- Issued
- Jun 20, 2002
- Abate by
- May 31, 2002
Recent events (2)
- — I (S)
- — Z (S)
1910.305 B01
- Issued
- Jun 20, 2002
- Abate by
- May 31, 2002
Recent events (2)
- — I (S)
- — Z (S)
1910.304 F04
- Issued
- Jun 20, 2002
- Abate by
- Aug 7, 2002
- Penalty
- Initial $2,000 · Current $1,600 Reduced
Recent events (2)
- — I (S) $1600.00
- — Z (S) $2000.00
1910.305 G01 I
- Issued
- Jun 20, 2002
- Abate by
- May 31, 2002
- Penalty
- Initial $1,020 · Current $816 Reduced
Recent events (2)
- — I (S) $816.00
- — Z (S) $1020.00
1910.305 G01 III
- Issued
- Jun 20, 2002
- Abate by
- May 31, 2002
Recent events (2)
- — I (S)
- — Z (S)
1910.305 G02 III
- Issued
- Jun 20, 2002
- Abate by
- May 31, 2002
Recent events (2)
- — I (S)
- — Z (S)
1910.307 B
- Issued
- Jun 20, 2002
- Abate by
- Sep 3, 2002
- Penalty
- Initial $2,000 · Current $1,600 Reduced
Recent events (2)
- — I (S) $1600.00
- — Z (S) $2000.00
1910.332 B01
- Issued
- Jun 20, 2002
- Abate by
- Sep 3, 2002
- Penalty
- Initial $1,200 · Current $960 Reduced
Recent events (2)
- — I (S) $960.00
- — Z (S) $1200.00
1904.39 A
- Issued
- Jun 20, 2002
- Abate by
- Jun 25, 2002
- Penalty
- Initial $4,000
Recent events (2)
- — I (O)
- — Z (O) $4000.00
1910.95 D03
- Issued
- Jun 20, 2002
- Abate by
- Aug 7, 2002
Recent events (2)
- — I (O)
- — Z (O)
1910.212 B
- Issued
- Jun 20, 2002
- Abate by
- Jun 25, 2002
Recent events (2)
- — I (O)
- — Z (O)
1910.213 B03
- Issued
- Jun 20, 2002
- Abate by
- Aug 7, 2002
Recent events (2)
- — I (O)
- — Z (O)
More inspections at Connecticut Stamping and Bending Company
View Connecticut Stamping and Bending Company's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in CT
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 300087731.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.