Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,191,871Inspections Most recent open 2026-07-30 Last loaded 2026-08-03

OSHA Inspection: FRANK'S SERVICE & EQUIPMENT

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of FRANK'S SERVICE & EQUIPMENT in COUNTRY ROAD 52 & FM 666, BANQUETE, TX 78339 (NAICS 000000). OSHA activity number 300187770.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Frank'S Service & Equipment for free Get an email when a new federal OSHA severe-injury report for Frank'S Service & Equipment is published. One employer, no account, unsubscribe in one click.
Site address
COUNTRY ROAD 52 & FM 666
City
BANQUETE
State
TX
ZIP
78339
Mailing
P.O. BOX 1552, ALICE, TX 78333
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
1311
Employees
2
Ownership type
A
Industry flags
Manufacturing safety.

1 citation on file for this inspection.

5(a)(1)

Serious Gravity 10 1 instance 2 exposed
Issued
Aug 6, 1997
Abate by
Aug 10, 1997
Penalty
Initial $1,500 · Current $750 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing or likely to cause death or serious physical harm to
employees in that employees
were exposed to high pressure explosion:
Employees were exposed to the hazard of an explosion resulting from high
pressure settling in a low pressure drip bottle which exploded on June 16,
1997.
One feasible and acceptable abatement method, among others, to correct the
hazards is to assure that the drip bottle is designed, installed, and used
in
accordance with Section VIII of ASME Boiler and Pressure Vessel code.
Proper
steps should be taken to install and operate safely under pressure before
commencing operations such as specified by API RP 54-92, Section 8.13 Page
20.
*** Certification and Documentation of Abatement required ***uired
Recent events (2)
  • · I (S) $750.00
  • · Z (S) $1500.00

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 300187770.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.