PRESTON, ID ·
OSHA Inspection: TRAILS WEST MANUFACTURING OF IDAHO INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of TRAILS WEST MANUFACTURING OF IDAHO INC. in 65 NORTH 800 WEST, PRESTON, ID 83263 (NAICS 000000). OSHA activity number 300203221.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- TRAILS WEST MANUFACTURING OF IDAHO INC.
- Site address
- 65 NORTH 800 WEST
- City
- PRESTON
- State
- ID
- ZIP
- 83263
- Mailing
- POST OFFICE BOX 67, PRESTON, ID 83263
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3799
- Employees
- 82
- Ownership type
- A
Citations
10 citations on file for this inspection.
5(a)(1)
- Issued
- Mar 31, 1997
- Abate by
- Jul 2, 1997
- Penalty
- Initial $1,250
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to potential bursting of PVC piping. (a)In the Paint and Caulk Areas: On or about 01/28/97 and at times prior there to, compressed air was transported in PVC pipe attached to the walls and ceiling of the paint rooms and caulk area. Among others, one feasible and acceptable abatement method to correct this hazard is: Replace the PVC pipe with steel pipe listed for the use intended.
Recent events (2)
- · I (S)
- · Z (S) $1250.00
1910.36 B06
- Issued
- Mar 31, 1997
- Abate by
- Apr 24, 1997
- Penalty
- Initial $1,250
Recent events (2)
- · I (S)
- · Z (S) $1250.00
1910.37 F05
- Issued
- Mar 31, 1997
- Abate by
- Apr 24, 1997
Recent events (2)
- · I (S)
- · Z (S)
1910.37 Q06
- Issued
- Mar 31, 1997
- Abate by
- Apr 24, 1997
Recent events (2)
- · I (S)
- · Z (S)
1910.147 C04 II
- Issued
- Mar 31, 1997
- Abate by
- Apr 24, 1997
- Penalty
- Initial $2,500
Recent events (2)
- · I (S)
- · Z (S) $2500.00
1910.147 C06 I
- Issued
- Mar 31, 1997
- Abate by
- Apr 24, 1997
Recent events (2)
- · I (S)
- · Z (S)
1910.147 C07 I
- Issued
- Mar 31, 1997
- Abate by
- Apr 7, 1997
1910.147 D04 I
- Issued
- Mar 31, 1997
- Abate by
- Apr 7, 1997
Recent events (2)
- · I (S)
- · Z (S)
1910.212 A03 II
- Issued
- Mar 31, 1997
- Abate by
- Apr 24, 1997
- Penalty
- Initial $1,250
Recent events (2)
- · I (S)
- · Z (S) $1250.00
1910.157 G01
- Issued
- Mar 13, 1997
- Abate by
- Apr 8, 1997
Recent events (2)
- · I (S)
- · Z (S)
More inspections at Trails West Manufacturing of Idaho INC.
View Trails West Manufacturing of Idaho INC.'s full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in ID
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 300203221.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.