PENUELAS, PR ·
OSHA Inspection: PDM ENGINEERED CONSTRUCTION INC
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of PDM ENGINEERED CONSTRUCTION INC in CARR 337 KM.3.7 INTERIOR BO TALLABOA, PENUELAS, PR 00624 (NAICS 000000). OSHA activity number 300427630.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PDM ENGINEERED CONSTRUCTION INC
- Site address
- CARR 337 KM.3.7 INTERIOR BO TALLABOA
- City
- PENUELAS
- State
- PR
- ZIP
- 00624
- Mailing
- P O BOX 561265, GUAYANILLA, PR 00656
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (N)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 1791
- Employees
- 180
- Ownership type
- Private (A)
- Industry flags
- Construction safety.
Citations
2 citations on file for this inspection.
6A0001
- Issued
- Feb 29, 2000
- Abate by
- Mar 8, 2000
- Penalty
- Initial $3,500 · Current $1,750 Reduced
General-duty citation text
Section 6(a) of the Puerto Rico Occupational Safety and Health Act: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or physical harm to employees in that employees were exposed to: Seccion 6(a) de la Ley de Seguridad y Salud en el Trabajo de Puerto Rico: El patrono no proveyo empleo y un sitio de empleo libre de riesgos reconocidos que esten causando o que puedan causar muerte o dano fisico a los empleados, por cuanto empleados estaban expuestos a: a. Receive serious injuries due to falls while employees work in steel erection activities installing pipe wearing structure over wood platform fourteen feet wide and fourteen feet lenght, twenty feet high and over two pipes eight inches of diameter, ten feet long and thirteen feet high; employees did not tied-off their body harnesses to a life line or a safe area of the structure. Among other methods one feasible and acceptable abatement method to correct this hazard is using a complete personal fall arrest system. a. Recibir lessiones serias debido a caidas mientras se trabaja en actividad de ereccion de acero instalando estructura de soporte de tuberias sobre plataforma de madera catorce pies de ancho y largo, veinte pies de alto y sobre dos tubos de ocho pulgadas de diametro, diez pies de largo y a trece pies de alto; empleados no estaban atando sus arneses a una linea de salvamento o a un area segura de la estructura. Entre otros metodos, un metodo para corregir aceptable y viable es el uso de un sistema personal completo de proteccion a caidas.
Recent events (2)
- · I (S) $1750.00
- · Z (S) $3500.00
1926.1053 A19
- Issued
- Feb 29, 2000
- Abate by
- Mar 8, 2000
- Penalty
- Initial $3,500 · Current $1,750 Reduced
Recent events (2)
- · I (S) $1750.00
- · Z (S) $3500.00
More inspections at PDM Engineered Construction INC
View PDM Engineered Construction INC's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in PR
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 300427630.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.