OSHA Inspection: NORTH AMERICAN PRECAST COMPANY

Accident-driven inspection · Health discipline

On , OSHA opened an accident-driven health inspection of NORTH AMERICAN PRECAST COMPANY in 6949 LOW BID LANE, SAN ANTONIO, TX 78250 (NAICS 000000). OSHA activity number 300438074.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch North American Precast Company — free Get an email when a new federal OSHA severe-injury report for North American Precast Company is published. One employer, no account, unsubscribe in one click.
Site address
6949 LOW BID LANE
City
SAN ANTONIO
State
TX
ZIP
78250
Inspection type
Accident-driven (A)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
000000
SIC code (legacy)
3272
Employees
168
Ownership type
A

2 citations on file for this inspection.

5(a)(1)

Serious Gravity 05 2 instances 150 exposed
Issued
Sep 14, 1998
Abate by
Oct 30, 1998
Penalty
Initial $1,925 · Current $1,925

Hazardous substances 8320

Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not furnish
employment and a place of employment which were free from recognized
hazards that were
causing or likely to cause death or serious physical harm to employees in
that employees were
exposed to excessive levels of heat stress while working on  forming crews
and the  clean-up
crew.  Such exposure(s) may lead to the development of serious heat
induced illness(es), such
as heat stroke, heat exhaustion, heat cramps, heat syncope, heat rash and
transient heat
fatigue.
(a) for employees performing  heavy work while on the clean-up crew on
July 20th and
August 12, 1998, at 6949 Lowbid Lane, San Antonio, Texas.  The Wet Bulb
Globe Temperature
(WBGT) index in the production area ranged from 82$F to greater than 90$F
during the 45
minute and 5.5 hour sampling periods, respectively.  The estimated
metabolic workload for these
employees put them in the  heavy workload category as correlated with the
guidelines
established by the American Conference of Governmental Industrial
Hygienists (ACGIH) and the
National Institute for Occupational Safety and Health (NIOSH).  The
clean-up crew was
responsible for sweeping and raking the excess concrete and scrap metals
from between the
different beds and then shoveling the material into the bucket of a
back-hoe.
(b) for employees performing  moderate work while on the forming crews on
July 20th
and August 12, 1998, at 6949 Lowbid Lane, San Antonio, Texas.  The Wet
Bulb Globe
Temperature (WBGT) index in the production area ranged from 82$F to
greater than 90$F during
the 45 minute and 5.5 hour sampling periods, respectively.  The estimated
metabolic workload
for these employees put them in the  moderate workload category as
correlated with the
guidelines established by the American Conference of Governmental
Industrial Hygienists
(ACGIH) and the National Institute for Occupational Safety and Health
(NIOSH). The forming
crews were responsible for laying out rebar and wire mesh,  securing it
and then casting the
product.  Casting involves tasks such as: ensuring even distribution of
the concrete by guiding
the chute, raking and/or shoveling the concrete, operating the vibration
unit and/or operating the
mechanical floating devices.
Means of feasible abatement include, but may not be limited to:
1.)  Establishment of provisions for a work/rest regimen so that exposure
time to
high temperatures is decreased and/or the work rate is decreased.
2.)  Adjusting the work periods such that the more vigorous tasks (such as
casting
the concrete and sweeping and shoveling during clean-up) are NOT performed
during the peak
temperatures of the day.
3.)  Development of a formal heat stress program which incorporates: (a) a
training program informing employees about the effects of heat stress,
symptoms of heat-induced
illnesses, and prevention of heat-induced illnesses; (b) use of heat
stress instruments to monitor
the work environment; (c) an acclimation program for new employees and
employees returning
from periods of absence of three or more days; (d) a screening program to
identify health
conditions aggravated by elevated temperatures; (e) provisions for
providing cool drinking water
and/or electrolytes; and, (f) provisions to provide rest areas with cooler
temperatures.

1910.151 A

Serious Gravity 05 1 instance 100 exposed
Issued
Sep 14, 1998
Abate by
Sep 24, 1998
Penalty
Initial $1,925 · Current $1,925

Hazardous substances 8320

View North American Precast Company's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 300438074.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.