FRANKLIN, NH ·
OSHA Inspection: WEBSTER VALVE CO.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of WEBSTER VALVE CO. in SOUTH MAIN ST., FRANKLIN, NH 03235 (NAICS 000000). OSHA activity number 300440765.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- WEBSTER VALVE CO.
- Site address
- SOUTH MAIN ST.
- City
- FRANKLIN
- State
- NH
- ZIP
- 03235
- Mailing
- P. O. BOX 6431, FRANKLIN, NH 03235
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (N)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3494
- Employees
- 500
- Ownership type
- Private (A)
- Industry flags
- Manufacturing safety.
Citations
68 citations on file for this inspection.
5(a)(1)
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
- Penalty
- Initial $2,500 · Current $1,250 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to hazards of being hit/crushed from falling loads: a.Dept. 99, Valve Assembly Bench - Employees were exposed to the hazards of falling loads due to failure of the lifting device. The capacity of the lifting device was unknown, there were no markings, and was not load tested. b.Dept. 80, Barrett Centrifuge - Employees were exposed to the hazards of falling loads due the failure of lifting devices. There were three lifting devices in the area with unknown capacities, there were no markings, and were not load tested. c.Dept. 73, Black Oxide Line - Employees were exposed to the hazards of falling loads due to the failure of lifting device. The capacity of the lifting device was unknown, there were no markings, and was not load tested. d.Dept. 91, Aqueous Degreaser - Employees were exposed to the hazards of falling loads due to the failure of the lifting device. The capacity of the lifting device was unknown, there were no markings, and was not load tested. e.Dept. 77, Therm Lift - Employee exposed to the hazards of being hit/crushed by a falling load due to the failure of the lifting unit. The lifting unit was not being operated in accordance with the manufacturer's recommendations in that a counter weight was not in place. f.Dept.78G, Barrett Portable Elevator - Employee exposed to the hazards of being hit/crushed by a falling load due to the failure of the lifting unit. The lifting unit had a damaged wire rope lifting line and the wire rope clips on the lifting line were not installed properly. g.Foundry, Grinding Dept., Finish Wheelabrator - Employee exposed to the hazards of being hit/crushed by a falling load due to the skip loader. The skip loader lifting rope was not adequately secured in that there were inadequate number of wire rope clips were used to connect the lifting rope. h.Crane #25 - Employees were exposed to being hit/crushed by the crane system and/or load due to a crane failure. The crane was installed without adequate checks being made to determine if the building structure the crane system was attached to was adequate to support the crane bridge, crane trolley, crane, and loads being serviced. i.Crane #51 - Employees were exposed to being hit/crushed by the crane system and/or load due to a crane failure. The crane was installed without adequate checks being made to determine if the building structure the crane system was attached to was adequate to support the crane system and loads being serviced. j.Jib-type cranes throughout the facility - Employees were exposed to being hit/crushed by the crane system and/or load due to a crane failure. The jib-type cranes were not installed in accordance with the manufacturer's recommendations. ABATEMENT NOTE: Crane and hoist systems must be installed, used, and maintained in accordance with the manufacturer's recommendations or be certified by a person competent in crane and hoist systems and structural design to ensure they are installed properly to support anticipated uses.
Recent events (2)
- · I (S) $1250.00
- · Z (S) $2500.00
1910.22 A01
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
- Penalty
- Initial $2,500 · Current $1,250 Reduced
Recent events (2)
- · I (S) $1250.00
- · Z (S) $2500.00
1910.23 C01
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
- Penalty
- Initial $2,000 · Current $1,000 Reduced
Recent events (2)
- · I (S) $1000.00
- · Z (S) $2000.00
1910.36 B04
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- · I (S) $750.00
- · Z (S) $1500.00
1910.37 F02
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
1910.37 F05
- Issued
- Jun 9, 1997
- Abate by
- Jun 17, 1997
- Penalty
- Initial $2,500 · Current $1,250 Reduced
Recent events (2)
- · I (S) $1250.00
- · Z (S) $2500.00
1910.106 D02 I
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- · I (S) $750.00
- · Z (S) $1500.00
1910.106 E06 II
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
- Penalty
- Initial $2,000 · Current $1,000 Reduced
Recent events (2)
- · I (S) $1000.00
- · Z (S) $2000.00
1910.107 E09
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
1910.107 E05
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
- Penalty
- Initial $2,000 · Current $1,000 Reduced
Recent events (2)
- · I (S) $1000.00
- · Z (S) $2000.00
1910.107 E05
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
1910.110 B20 I
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
- Penalty
- Initial $2,000 · Current $1,000 Reduced
Recent events (2)
- · I (S) $1000.00
- · Z (S) $2000.00
1910.110 D04 IC
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
- Penalty
- Initial $2,000 · Current $1,000 Reduced
Recent events (2)
- · I (S) $1000.00
- · Z (S) $2000.00
1910.110 D07 I
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
- Penalty
- Initial $2,500 · Current $1,250 Reduced
Recent events (2)
- · I (S) $1250.00
- · Z (S) $2500.00
1910.110 E04 III
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
- Penalty
- Initial $2,000 · Current $1,000 Reduced
Recent events (2)
- · I (S) $1000.00
- · Z (S) $2000.00
1910.110 F04 I
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
- Penalty
- Initial $2,000 · Current $1,000 Reduced
Recent events (2)
- · I (S) $1000.00
- · Z (S) $2000.00
1910.132 A
- Issued
- Jun 9, 1997
- Abate by
- Mar 16, 1998
- Penalty
- Initial $2,000 · Current $1,000 Reduced
Recent events (3)
- · P (S) $1000.00
- · I (S) $1000.00
- · Z (S) $2000.00
1910.132 D01
- Issued
- Jun 9, 1997
- Abate by
- Mar 16, 1998
Recent events (3)
- · P (S)
- · I (S)
- · Z (S)
1910.132 F01
- Issued
- Jun 9, 1997
- Abate by
- Mar 16, 1998
Recent events (3)
- · P (S)
- · I (S)
- · Z (S)
1910.132 E
- Issued
- Jun 9, 1997
- Abate by
- Jun 17, 1997
- Penalty
- Initial $2,000 · Current $1,000 Reduced
Recent events (2)
- · I (S) $1000.00
- · Z (S) $2000.00
1910.146 C01
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
- Penalty
- Initial $5,000 · Current $1,750 Reduced
Recent events (2)
- · I (S) $1750.00
- · Z (S) $5000.00
1910.146 C02
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
1910.146 C04
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
1910.146 G01
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
1910.147 C04 I
- Issued
- Jun 9, 1997
- Abate by
- Jun 25, 1998
- Penalty
- Initial $2,500 · Current $1,250 Reduced
Recent events (2)
- · I (S) $1250.00
- · Z (S) $2500.00
1910.147 F02 I
- Issued
- Jun 9, 1997
- Abate by
- Jun 17, 1997
- Penalty
- Initial $2,500 · Current $1,250 Reduced
Recent events (2)
- · I (S) $1250.00
- · Z (S) $2500.00
1910.176 B
- Issued
- Jun 9, 1997
- Abate by
- Jun 17, 1997
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- · I (S) $750.00
- · Z (S) $1500.00
1910.178 L
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
- Penalty
- Initial $2,000 · Current $1,000 Reduced
Recent events (2)
- · I (S) $1000.00
- · Z (S) $2000.00
1910.178 O01
- Issued
- Jun 9, 1997
- Abate by
- Jun 17, 1997
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- · I (S) $750.00
- · Z (S) $1500.00
1910.179 B05
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
- Penalty
- Initial $2,000 · Current $1,000 Reduced
Recent events (2)
- · I (S) $1000.00
- · Z (S) $2000.00
1910.179 J02 III
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
1910.179 L01
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
1910.179 L03 I
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
1910.184 E02 II
- Issued
- Jun 9, 1997
- Abate by
- Jun 17, 1997
- Penalty
- Initial $2,000 · Current $1,000 Reduced
Recent events (2)
- · I (S) $1000.00
- · Z (S) $2000.00
1910.212 A01
- Issued
- Jun 9, 1997
- Abate by
- Jun 25, 1999
- Penalty
- Initial $5,000 · Current $1,750 Reduced
Recent events (3)
- · P (S) $1750.00
- · I (S) $1750.00
- · Z (S) $5000.00
1910.212 A02
- Issued
- Jun 9, 1997
- Abate by
- Jun 25, 1999
- Penalty
- Initial $2,500 · Current $1,250 Reduced
Recent events (3)
- · P (S) $1250.00
- · I (S) $1250.00
- · Z (S) $2500.00
1910.212 A03 II
- Issued
- Jun 9, 1997
- Abate by
- Jun 25, 1999
- Penalty
- Initial $2,500 · Current $1,250 Reduced
Recent events (3)
- · P (S) $1250.00
- · I (S) $1250.00
- · Z (S) $2500.00
1910.212 A04
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
- Penalty
- Initial $2,000 · Current $1,000 Reduced
Recent events (2)
- · I (S) $1000.00
- · Z (S) $2000.00
1910.212 A05
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- · I (S) $750.00
- · Z (S) $1500.00
1910.213 B03
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- · I (S) $750.00
- · Z (S) $1500.00
1910.213 I01
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- · I (S) $750.00
- · Z (S) $1500.00
1910.219 B01
- Issued
- Jun 9, 1997
- Abate by
- Jun 25, 1999
- Penalty
- Initial $2,000 · Current $1,000 Reduced
Recent events (3)
- · P (S) $1000.00
- · I (S) $1000.00
- · Z (S) $2000.00
1910.219 C02 I
- Issued
- Jun 9, 1997
- Abate by
- Jun 25, 1999
- Penalty
- Initial $2,000 · Current $1,000 Reduced
Recent events (3)
- · P (S) $1000.00
- · I (S) $1000.00
- · Z (S) $2000.00
1910.219 C03
- Issued
- Jun 9, 1997
- Abate by
- Jun 25, 1999
- Penalty
- Initial $2,000 · Current $1,000 Reduced
Recent events (3)
- · P (S) $1000.00
- · I (S) $1000.00
- · Z (S) $2000.00
1910.219 C04 I
- Issued
- Jun 9, 1997
- Abate by
- Jun 25, 1999
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (3)
- · P (S) $750.00
- · I (S) $750.00
- · Z (S) $1500.00
1910.219 D01
- Issued
- Jun 9, 1997
- Abate by
- Jun 25, 1999
- Penalty
- Initial $2,500 · Current $1,250 Reduced
Recent events (3)
- · P (S) $1250.00
- · I (S) $1250.00
- · Z (S) $2500.00
1910.219 E03 I
- Issued
- Jun 9, 1997
- Abate by
- Jun 25, 1999
Recent events (3)
- · P (S)
- · I (S)
- · Z (S)
1910.219 E05 I
- Issued
- Jun 9, 1997
- Abate by
- Jun 25, 1998
Recent events (2)
- · I (S)
- · Z (S)
1910.219 F01
- Issued
- Jun 9, 1997
- Abate by
- Jun 25, 1999
- Penalty
- Initial $2,500 · Current $1,250 Reduced
Recent events (3)
- · P (S) $1250.00
- · I (S) $1250.00
- · Z (S) $2500.00
1910.219 F03
- Issued
- Jun 9, 1997
- Abate by
- Jun 25, 1999
- Penalty
- Initial $2,500 · Current $1,250 Reduced
Recent events (3)
- · P (S) $1250.00
- · I (S) $1250.00
- · Z (S) $2500.00
1910.242 B
- Issued
- Jun 9, 1997
- Abate by
- Dec 30, 1998
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (3)
- · P (S) $750.00
- · I (S) $750.00
- · Z (S) $1500.00
1910.255 B04
- Issued
- Jun 9, 1997
- Abate by
- Aug 25, 1997
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- · I (S) $750.00
- · Z (S) $1500.00
1910.303 B01
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
- Penalty
- Initial $2,500 · Current $1,250 Reduced
Recent events (2)
- · I (S) $1250.00
- · Z (S) $2500.00
1910.303 F
- Issued
- Jun 9, 1997
- Abate by
- Dec 27, 1997
- Penalty
- Initial $2,500 · Current $1,250 Reduced
Recent events (3)
- · P (S) $1250.00
- · I (S) $1250.00
- · Z (S) $2500.00
1910.303 G01 I
- Issued
- Jun 9, 1997
- Abate by
- Dec 27, 1997
- Penalty
- Initial $2,500 · Current $1,250 Reduced
Recent events (3)
- · P (S) $1250.00
- · I (S) $1250.00
- · Z (S) $2500.00
1910.303 G02 I
- Issued
- Jun 9, 1997
- Abate by
- Jun 17, 1997
- Penalty
- Initial $2,500 · Current $1,250 Reduced
Recent events (2)
- · I (S) $1250.00
- · Z (S) $2500.00
1910.303 G02 II
- Issued
- Jun 9, 1997
- Abate by
- Dec 27, 1997
Recent events (2)
- · P (S)
- · Z (S)
1910.304 F04
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
- Penalty
- Initial $2,500 · Current $1,250 Reduced
Recent events (2)
- · I (S) $1250.00
- · Z (S) $2500.00
1910.307 B
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
- Penalty
- Initial $2,500 · Current $1,250 Reduced
Recent events (2)
- · I (S) $1250.00
- · Z (S) $2500.00
1910.332 B01
- Issued
- Jun 9, 1997
- Abate by
- Sep 15, 1997
- Penalty
- Initial $2,500 · Current $1,250 Reduced
Recent events (2)
- · I (S) $1250.00
- · Z (S) $2500.00
1910.333 A
- Issued
- Jun 9, 1997
- Abate by
- Sep 15, 1997
Recent events (2)
- · I (S)
- · Z (S)
1910.335 A01 I
- Issued
- Jun 9, 1997
- Abate by
- Sep 15, 1997
Recent events (2)
- · I (S)
- · Z (S)
1910.335 B02
- Issued
- Jun 9, 1997
- Abate by
- Sep 15, 1997
Recent events (2)
- · I (S)
- · Z (S)
1910.147 C04 II
- Issued
- Jun 9, 1997
- Abate by
- Jun 25, 1998
- Penalty
- Initial $25,000 · Current $12,500 Reduced
Recent events (2)
- · I (R) $12500.00
- · Z (R) $25000.00
1910.147 C07 I
- Issued
- Jun 9, 1997
- Abate by
- Aug 14, 1997
Recent events (2)
- · I (R)
- · Z (R)
1910.147 C05 I
- Issued
- Jun 9, 1997
- Abate by
- Jul 25, 1997
- Penalty
- Initial $25,000 · Current $12,500 Reduced
Recent events (2)
- · I (R) $12500.00
- · Z (R) $25000.00
1910.132 A
- Issued
- Jun 9, 1997
- Abate by
- Jun 13, 1997
- Penalty
- Initial $1,000 · Current $500 Reduced
1730
Recent events (2)
- · I (O) $500.00
- · Z (O) $1000.00
1910.305 B01
- Issued
- Jun 9, 1997
- Abate by
- Jun 17, 1997
More inspections at Webster Valve CO.
View Webster Valve CO.'s full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in NH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 300440765.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.