JOHNS ISLAND, SC —
OSHA Inspection: REPUBLIC CONTRACTING CORPORATION
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of REPUBLIC CONTRACTING CORPORATION in 2411 MAYBANK HWY, STONO RIVER BRIDGE REPLACEMENT, JOHNS ISLAND, SC 29455 (NAICS 000000). OSHA activity number 301114799.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- REPUBLIC CONTRACTING CORPORATION
- Site address
- 2411 MAYBANK HWY, STONO RIVER BRIDGE REPLACEMENT
- City
- JOHNS ISLAND
- State
- SC
- ZIP
- 29455
- Mailing
- P.O. BOX 9167, COLUMBIA, SC 29290
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 1622
- Employees
- 70
- Ownership type
- A
- Industry flags
- Construction safety.
Citations
10 citations on file for this inspection.
5(a)(1)
- Issued
- Mar 20, 2003
- Abate by
- Apr 22, 2003
- Penalty
- Current $3,000
General-duty citation text
expected environmental conditions. Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: a. Instability of the load and potential loss of load and/or crane collapse in that on the West side of the jobsite, the Manitowoc C-80 land based barge mounted crawler crane was mounted on a Mobro barge that the entire bottom area of the barge was not completely submerged, approximately half of the hull of the barge was submerged and the other half was on the river bank while the crane was in use. Among other methods, one feasible and acceptable abatement method to correct this hazard would be to comply with Floating Cranes and Floating Derricks ANSI B30.8-1.2.2(b)(2)(c): The entire bottom area of the barge or pontoon shall be submerged. b. Land cranes mounted on barges have a maximum allowable list of 5 degrees, a list of more than 5 degrees can lead to load instability and potential crane collapse, on the West side of the jobsite, the Manitowoc C-80 land based barge mounted crawler crane was mounted on a Mobro barge and means was not provided for the operator to visually determine the list of the barge. Among other methods, one feasible and acceptable abatement method to correct this hazard would be to comply with Floating Cranes and Floating Derricks ANSI B30.8-1.4.3(e): Means shall be provided for the operator to visually determine the list of the pontoon or barge. c. Fall potential of approximately eight feet from the unstable cab roof of the crane during inspections/lubrication of the crane, in that the cab roof of the Manitowoc 4000 150 ton C-42 Crane land based floating crane on the East side of the jobsite had been made of plywood that had weathered and was no longer capable of supporting, without permanent distortion, the weight of a 200 lb. (90 kg.) person. Among other methods, one feasible and acceptable abatement method to correct this hazard would be to comply with Floating Cranes and Floating Derricks ANSI B30.8-1.10.4: Cab Roof where necessary for rigging or service requirements, a ladder or steps shall be provided to give access to the cab roof. The ladder or steps shall conform to the requirements of ANSI/SAE J185 and shall be capable of supporting, without permanent distortion, the weight of a 200 lb. (90 kg.) person. d. Instability of the load and potential loss of the load and/or crane collapse in that the crane must be mounted on a structurally sound and stable surface; periodic inspections shall be made of barge compartments for leakage and structural damage and safe access to the barge compartments was not provided on the Mobro barge, on which the Manitowoc C-80 land based barge mounted crawler crane was mounted, on the West side of the jobsite, in that the manholes were only approximately 18 1/2 inches in diameter. Among other methods, one feasible and acceptable abatement method to correct this hazard would be to comply with Floating Cranes and Floating Derricks ANSI B30.8-1.3.3: Manholes shall be no smaller than 15 in. x 22 in. (380 mm x 560 mm). Access shall be provided to all void compartments. e. Instability of the load and potential loss of the load and/or crane collapse in that the crane must be mounted on a structurally sound and stable surface in that complete periodic inspections were not performed on barges that included inspecting compartments for leakage and structural damage on the Mobro barge, on which the Manitowoc C-80 land based crawler crane was mounted, on the West side of the jobsite. Among other methods, one feasible and acceptable abatement method to correct this hazard would be to comply with Floating Cranes and Floating Derricks ANSI B30.8-2.1.3(b)(2) Periodic complete inspections shall be performed on barge or pontoon compartments for leakage and structural damage; void compartment atmosphere shall be testedbefore entering. f. Instability of the load and potential loss of the load and/or boom/collapse in that on the West side of the jobsite, on the boom of the Manitowoc C-80 land based barge mounted crawler crane, mounted to the Mobro barge, lattices were swollen with rust, excessively corroded, and/or bent, some of the lattices had been marked with red flagging, and had not been repaired before the operation of the crane was resumed in that: i) On the head section of the boom, the top lattice towards the sheaves, the left weld was bubbled with rust and corroded all the way around the lattice. ii) On the head section on the left side, the fourth lattice back from the tip end, behind the "C" in the Manitowoc sign, was swollen and disfigured with rust. The paint on the lattice was blistered with corrosion underneath the paint. The bottom weld on the lattice was excessively corroded with rust. This lattice was not uniform with the other lattices in the head section of the boom. iii) The first cross bracing from the tip end, both lattices were excessively corroded and swollen with rust and had blistered paint. iv) The second cross bracing from the tip end on the back side the lattice from left (top) to right (bottom) was excessively corroded and swollen with rust and disfigured. v) The second section from the tip end the first angle lattice was bent on the bottom. Among other methods, one feasible and acceptable abatement method to correct this hazard would be to comply with Floating Cranes and Floating Derricks ANSI B30.8-2.3.3(c)(2): Repairs or replacements shall be provided as needed for operations for critical parts of the structure which are cracked bent, broken or excessively corroded. g. Instability and/or loss of the load in that the capacity in tons and weight of the Crosby hook on the Manitowoc C-80 land based barge mounted crawler crane located on the Mobro barge on the west side of the jobsite, was corroded with rust and was not discernable. Among other methods, one feasible and acceptable abatement method to correct this hazard would be to comply with Floating Cranes and Floating Derricks ANSI B30.8-1.9.6 All hook and ball assemblies and load blocks shall be labeled with their rated capacity and weight. h. No warning of brake failure due to the air pressure alarm for the brakes in the cab had been disarmed/covered over on the Manitowoc C-80 land based barge mounted crawler crane on the Mobro barge on the west side of the jobsite. Among other methods, one feasible and acceptable abatement method to correct this hazard would be to comply with Floating Cranes and Floating Derricks ANSI B30.8-2.1.2(a) and 8-2.3.3 items such as all safety devices for proper function shall be inspected at intervals (frequent inspections) as defined in para. 8-2.1.1(b)(1), or as specifically indicated, including observation during operation for any deficiencies which might appear between regular inspections and any hazardous conditions disclosed by the inspection requirements of para. 8-2.1 shall be corrected before operation is resumed. i. Instability of the load due to improper reeving of the rope on the drum for the whip line on the Manitowoc C-80 land based barge mounted crawler crane on the Mobro barge on the west side of the jobsite. Among other methods, one feasible and acceptable abatement method to correct this hazard would be to comply with Floating Cranes and Floating Derricks ANSI B30.8-2.1.2(a) and 8-2.3.3 items such as rope reeving for compliance with crane or derrick manufacturer's recommendations shall be inspected at intervals (frequent inspections) as definedin para. 8-2.1.1(b)(1), or as specifically indicated, including observation during operation for any deficiencies which might appear between regular inspections and any hazardous conditions disclosed by the inspection requirements of para. 8-2.1 shall be corrected before operation is resumed. j. Damage to wire rope and instability of the load due to sheaves on the block were not smooth in that were worn and grooved from wear on the Manitowoc C-80 land based barge mounted crawler crane on the Mobro barge on the west side of the jobsite. Among other methods, one feasible and acceptable abatement method to correct this hazard would be to comply with Floating Cranes and Floating Derricks ANSI B30.8-1.9.4(a) Sheave grooves shall be smooth and free from surface defects which could cause rope damage. k. Loss of load, in that the latch was missing of the ball hook on the Manitowoc 4000 150 ton C-42 land based floating crane on the east side of the jobsite. Among other methods, one feasible and acceptable abatement method to correct this hazard would be to comply with Floating Cranes and Floating Derricks ANSI B30.8-1.9.6 Hooks shall be equipped with latches unless the application makes the use of a latch impractical. l. Loss of load and/or instability of load, in that modified ratings due increased loading from environmental conditions such as list, trim, wind and wave action were not obtained from the manufacturer for land cranes mounted on barges for the Manitowoc C-42 land based crane mounted on the 10/40 sectional barge and the Manitowoc C-80 land based crawler crane mounted on the Mobro barge. Among other methods, one feasible and acceptable abatement method to correct this hazard would be to comply with Floating Cranes and Floating Derricks ANSI B30.8-1.2.2(b)(2)(a) Barge- or pontoon-mounted land cranes require modified ratings due to increased loading from list, trim, wave action, and wind. This rating will be different for each size of pontoon or barge used. Therefore, the load rating of barge- or pontoon-mounted land cranes and derricks shall not exceed that recommended by the manufacturer or qualified person for the particular barge or pontoon under the
Recent events (2)
- — F (S) $3000.00
- — Z (S)
1926.28 A
- Issued
- Mar 20, 2003
- Abate by
- Mar 26, 2003
- Penalty
- Initial $5,000
Recent events (2)
- — F (O)
- — Z (S) $5000.00
1926.251 C04 IV
- Issued
- Mar 20, 2003
- Abate by
- Mar 25, 2003
- Penalty
- Initial $5,000 · Current $3,000 Reduced
Recent events (2)
- — F (S) $3000.00
- — Z (S) $5000.00
1926.251 E08
- Issued
- Mar 20, 2003
- Abate by
- Mar 25, 2003
Recent events (2)
- — F (S)
- — Z (S)
1926.350 A10
- Issued
- Mar 20, 2003
- Abate by
- Mar 26, 2003
- Penalty
- Initial $1,500 · Current $1,000 Reduced
Recent events (2)
- — F (O) $1000.00
- — Z (S) $1500.00
1926.501 B01
- Issued
- Mar 20, 2003
- Abate by
- Mar 26, 2003
- Penalty
- Initial $5,000 · Current $1,000 Reduced
Recent events (2)
- — F (O) $1000.00
- — Z (S) $5000.00
1926.503 A02 II
- Issued
- Mar 20, 2003
- Abate by
- Mar 30, 2003
Recent events (2)
- — F (O)
- — Z (S)
1926.550 A05
- Issued
- Mar 20, 2003
- Abate by
- Mar 30, 2003
- Penalty
- Initial $5,000 · Current $2,500 Reduced
Recent events (2)
- — F (O) $2500.00
- — Z (S) $5000.00
1926.605 A01
- Issued
- Mar 20, 2003
- Abate by
- Apr 22, 2003
- Penalty
- Initial $5,000 · Current $5,000
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1926.605 B02
- Issued
- Mar 20, 2003
- Abate by
- Mar 30, 2003
- Penalty
- Initial $1,500 · Current $1,000 Reduced
Recent events (2)
- — F (O) $1000.00
- — Z (S) $1500.00
More inspections at Republic Contracting Corporation
View Republic Contracting Corporation's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in SC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 301114799.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.