CAROLINA, PR —
OSHA Inspection: SEDECO SERVICIOS DE DESCUENTO EN COMPRA, INC.
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of SEDECO SERVICIOS DE DESCUENTO EN COMPRA, INC. in SECTOR INDUSTRIAL SABANA GARDEN, LOTE 13, CAROLINA, PR 00978 (NAICS 493190). OSHA activity number 301708954.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- SEDECO SERVICIOS DE DESCUENTO EN COMPRA, INC.
- Site address
- SECTOR INDUSTRIAL SABANA GARDEN, LOTE 13
- City
- CAROLINA
- State
- PR
- ZIP
- 00978
- Mailing
- P.O. BOX 4559, CAROLINA, PR 00984
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 493190
- SIC code (legacy)
- 4226
- Employees
- 42
- Ownership type
- A
Citations
25 citations on file for this inspection.
6A0001
- Issued
- Aug 7, 2003
- Abate by
- Sep 9, 2003
- Penalty
- Initial $1,750 · Current $875 Reduced
General-duty citation text
Section 6(a) of the Puerto Rico Occupational Safety and Health Act: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or physical harm to employees in that employees were exposed to: Seccion 6(a) de la Ley de Seguridad y Salud en el Trabajo de Puerto Rico: El patrono no proveyo empleo y un sitio de empleo libre de riesgos reconocidos que esten causando o que puedan causar muerte o dano fisico a los empleados, por cuanto empleados estaban expuestos a: Exposed to a falling hazard at SEDECO SERVICIOS DE DESCUENTO EN COMPRA, INC. located at Sector Industrial Sabana Garden Lote 13B Carolina PR 00987, in two occasions an elevated employee without the benefit of a fall arrest system, was observed moving merchandise from a bin to a dolly, with a risk of falling thru open spaces,. The same employee that moved the merchandise operated the picker and elevated the dolly to the desired height and position. Once the dolly was positioned the transfer of merchandise from the bin to the dolly resumed as follow: An employee was observed moving merchandise while elevated six (6) feet from the floor at the rack number seventeen (17). The elevated dolly was 43 inches wide, while the distance between racks was of 69 inches. On one side, where the merchandise was being transferred, there was an open space between the rack and the bin of fifteen (15) inches. On the other side of the dolly there was an open space of eleven (11) inches. b) An employee was observed moving merchandise while elevated twelve (12) feet from the floor at the rack number nine (9). The elevated dolly was 43 inches wide, while the distance between racks was of sixty five (65) inches. On one side, where the merchandise was being transferred, there was an open space between the rack and the bin of twelve (12) inches. On the other side of the dolly there was an open space of ten (10) inches. Among other methods one feasible and acceptable abatement method to correct this hazard is: 1. placing the racks in such a manner that the hall between them has a width that reduces the gap between the racks and the dolly; or 2. changing the 43 inches wide dollys for a wider one; or 3. modify the dollys so that their platform is wider. Con un riesgo de caida en SEDECO SERVICIOS DE DESCUENTO EN COMPRA, INC. localizado en Sector Industrial Sabana Garden Lote 13B Carolina PR 00987, en dos ocasiones un empleado elevado, sin el beneficio de un sitema de proteccion contra caidas, fue observado moviendo mercancia de un bin a un carreton, con el riesgo de caer por un espacio abierto. El mismo empleado que movia la mercancia operaba el picker y elevaba el carreton a una altura deseada y possicion. Una vez el carreton estaba colocado la transferencia de mercancia del bin al carretoon comensaba como sigue: Se observo a un empleado moviendo mercancia mientras estaba elevado a seis (6) pies desde el piso en el rack diesisiete (17). El carreton elevado tenia 43 pulgadas de ancho, mientras que la distancia entre los racks era de 69 pulgadas. En un lado habia una apertura entre el rack y el carreton de 15 pulgdas. En el otro lado del carreton habia una apertura de once (11) pulgadas. Se observo a un empleado moviendo mercancia mientras estaba elevado a quince (15) pies desde el piso en el rack nueve (9). El carreton elevado tenia43 pulgadas de ancho, mientras que la distancia entre los racks es de 65 pulgadas. En un lado habia una apertura entre el rack y el carreton de 12 pulgdas. En el otro lado del carreton habia una apertura de 10 pulgadas. Entre otros metodos de correccion metodos factibles y aceptables de correccion son: colocar los anaqueles de forma que se reduzca el espacio entre los racks y el carreton; o cambiar los carretones de 43 pulgadas de ancho por unos mas anchos; modificar los carretones de forma que tengan una plataforma mas ancha.
Recent events (2)
- — L (O) $875.00
- — Z (S) $1750.00
6A0001
- Issued
- Aug 7, 2003
- Abate by
- Sep 9, 2003
- Penalty
- Initial $1,750 · Current $875 Reduced
General-duty citation text
Section 6(a) of the Puerto Rico Occupational Safety and Health Act: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or physical harm to employees in that employees were exposed to: Seccion 6(a) de la Ley de Seguridad y Salud en el Trabajo de Puerto Rico: El patrono no proveyo empleo y un sitio de empleo libre de riesgos reconocidos que esten causando o que puedan causar muerte o dano fisico a los empleados, por cuanto empleados estaban expuestos a: Presenting the hazard of stricking employees at SEDECO SERVICIOS DE DESCUENTO EN COMPRA, INC. located at Sector Industrial Sabana Garden Lote 13B Carolina PR 00987, where the employees drove fingers, drove pickers, stacked merchandise, and performed other tasks, the rack next to the rolling door number 7, where microwaves, hoods and other merchandise was stored, had four (4) of its frontal seven (7) legs damaged. This rack's legs where damaged by fingers and pickers operated by employees while stacking merchandise. This structure had 50 feet long, 4 feet wide and 15 feet tall. The rack was not anchored to the wall. The rack had three storing areas: the floor storing area, the middle area, and the upper (15 feet above ground) area. On the upper storing area there were microwaves. This structure integrity was compromised. Among other methods one feasible and acceptable abatement method to correct this hazard is replacing the rack. Creando el riesgo de empleados ser golpeados, en SEDECO SERVICIOS DE DESCUENTO EN COMPRA, INC. localizado en Sector Industrial Sabana Garden Lote 13B Carolina PR 00987, donde los empleados guiaban fingers, guiaban pickers, guardaban mercancia, y realizaban otras tareas, el rack al lado de la puerta numero 7, donde habian microhondas, extractores y otra mercancia almacenada, un rack tenia cuatro (4) de sus siete (7) patas delanteras danadas. Las patas del rack fueron danadas por montacargas y pickers operados por empleados mientras estos almacenaban mercancia. Esta estructura tenia 50 pies de largo, 4 pies de ancho y 15 pies de alto. El rack no estaba anclado a la pared. El rack tenia tres areas de almacenado: el area de almacenado a nivel de piso, el area del medio, y el area superior (que estaba a 15 pies sobre el piso). En el area de almacenaje superior estaban los microhondas. La integridad de la estructura estaba comprometida. Entre otros metodos de correccion uno factible y aceptable de correccion es reemplazando el rack.
Recent events (2)
- — L (S) $875.00
- — Z (S) $1750.00
1910.36 D02
- Issued
- Aug 7, 2003
- Abate by
- Sep 9, 2003
- Penalty
- Initial $1,050
Recent events (2)
- — L (O)
- — Z (S) $1050.00
1910.132 A
- Issued
- Aug 7, 2003
- Abate by
- Sep 9, 2003
- Penalty
- Initial $1,050 · Current $500 Reduced
Recent events (2)
- — L (O) $500.00
- — Z (S) $1050.00
1910.132 D01
- Issued
- Aug 7, 2003
- Abate by
- Sep 9, 2003
- Penalty
- Initial $1,050
Recent events (2)
- — L (O)
- — Z (S) $1050.00
1910.136 A
- Issued
- Aug 7, 2003
- Abate by
- Sep 9, 2003
- Penalty
- Initial $1,050 · Current $500 Reduced
Recent events (2)
- — L (O) $500.00
- — Z (S) $1050.00
1910.151 C
- Issued
- Aug 7, 2003
- Abate by
- Sep 23, 2003
- Penalty
- Initial $1,750
Recent events (2)
- — L (O)
- — Z (S) $1750.00
1910.157 C01
- Issued
- Aug 7, 2003
- Abate by
- Aug 12, 2003
- Penalty
- Initial $1,050 · Current $500 Reduced
Recent events (2)
- — L (O) $500.00
- — Z (S) $1050.00
1910.157 C04
- Issued
- Aug 7, 2003
- Abate by
- Sep 9, 2003
- Penalty
- Initial $1,400
Recent events (2)
- — L (O)
- — Z (S) $1400.00
1910.157 E03
- Issued
- Aug 7, 2003
- Abate by
- Aug 12, 2003
- Penalty
- Initial $1,050
Recent events (2)
- — L (O)
- — Z (S) $1050.00
1910.157 G01
- Issued
- Aug 7, 2003
- Abate by
- Sep 9, 2003
- Penalty
- Initial $1,050
Recent events (2)
- — L (O)
- — Z (S) $1050.00
1910.176 A
- Issued
- Aug 7, 2003
- Abate by
- Sep 9, 2003
- Penalty
- Initial $1,750 · Current $500 Reduced
Recent events (2)
- — L (O) $500.00
- — Z (S) $1750.00
1910.176 B
- Issued
- Aug 7, 2003
- Abate by
- Aug 12, 2003
- Penalty
- Initial $1,750 · Current $875 Reduced
Recent events (2)
- — L (S) $875.00
- — Z (S) $1750.00
1910.178 L01 II
- Issued
- Aug 7, 2003
- Abate by
- Sep 23, 2003
- Penalty
- Initial $1,750 · Current $500 Reduced
Recent events (2)
- — L (O) $500.00
- — Z (S) $1750.00
1910.178 P01
- Issued
- Aug 7, 2003
- Abate by
- Sep 23, 2003
- Penalty
- Initial $3,500
Recent events (2)
- — L (S)
- — Z (S) $3500.00
1910.178 Q01
- Issued
- Aug 7, 2003
- Abate by
- Sep 23, 2003
Recent events (2)
- — L (S)
- — Z (S)
1910.178 Q07
- Issued
- Aug 7, 2003
- Abate by
- Sep 23, 2003
Recent events (2)
- — L (S)
- — Z (S)
1910.303 B01
- Issued
- Aug 7, 2003
- Abate by
- Aug 12, 2003
- Penalty
- Initial $1,750 · Current $500 Reduced
Recent events (2)
- — L (S) $500.00
- — Z (S) $1750.00
1910.1200 G08
- Issued
- Aug 7, 2003
- Abate by
- Sep 9, 2003
- Penalty
- Initial $1,050
Recent events (2)
- — L (O)
- — Z (S) $1050.00
1910.1200 G11
- Issued
- Aug 7, 2003
- Abate by
- Sep 9, 2003
Recent events (2)
- — L (O)
- — Z (S)
1910.1200 H
- Issued
- Aug 7, 2003
- Abate by
- Sep 9, 2003
- Penalty
- Initial $1,050
Recent events (2)
- — L (O)
- — Z (S) $1050.00
1903.2 A01
- Issued
- Aug 7, 2003
- Abate by
- Aug 12, 2003
- Penalty
- Initial $700
Recent events (2)
- — L (O)
- — Z (O) $700.00
1904.32 B06
- Issued
- Aug 7, 2003
- Abate by
- Sep 9, 2003
- Penalty
- Initial $700
Recent events (2)
- — L (O)
- — Z (O) $700.00
1904.40 A
- Issued
- Aug 7, 2003
- Abate by
- Aug 12, 2003
- Penalty
- Initial $700
Recent events (2)
- — L (O)
- — Z (O) $700.00
1910.1200 E01
- Issued
- Aug 7, 2003
- Abate by
- Sep 9, 2003
- Penalty
- Initial $700
Recent events (2)
- — L (O)
- — Z (O) $700.00
More inspections in this industry (NAICS 493190)
More inspections in PR
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 301708954.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.