OSHA Inspection: PRICE CONSTRUCTION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of PRICE CONSTRUCTION in PALMETTO PARKWAY, LEXINGTON, SC 29072 (NAICS 000000). OSHA activity number 301756045.

Watch Price Construction — free Get an email when a new federal OSHA severe-injury report for Price Construction is published. One employer, no account, unsubscribe in one click.
Establishment
PRICE CONSTRUCTION
Site address
PALMETTO PARKWAY
City
LEXINGTON
State
SC
ZIP
29072
Mailing
503 HILLER RD., CHAPIN, SC 29036
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
000000
SIC code (legacy)
1761
Employees
4
Ownership type
A
Industry flags
Construction safety.

14 citations on file for this inspection.

1926.451 B05 II

Serious Gravity 03 1 instance 2 exposed
Issued
Mar 11, 1998
Abate by
Mar 16, 1998

1926.451 C02

Serious Gravity 03 5 instances 2 exposed
Issued
Mar 11, 1998
Abate by
Mar 16, 1998

1926.451 C02 I

Serious Gravity 03 3 instances 2 exposed
Issued
Mar 11, 1998
Abate by
Mar 16, 1998

1926.451 E01

Serious Gravity 03 2 instances 2 exposed
Issued
Mar 11, 1998
Abate by
Mar 16, 1998

1926.451 G01 I

Serious Gravity 03 2 instances 2 exposed
Issued
Mar 11, 1998
Abate by
Mar 16, 1998

1926.1053 B03

Serious Gravity 03 2 instances 2 exposed
Issued
Mar 11, 1998
Abate by
Mar 16, 1998

1926.1053 B16

Serious Gravity 03 1 instance 2 exposed
Issued
Mar 11, 1998
Abate by
Mar 16, 1998

1926.501 B11

Deleted Serious Gravity 10 1 instance 2 exposed
Issued
Mar 11, 1998
Abate by
Mar 16, 1998
Penalty
Initial $1,250 · Current $1,250
Recent events (2)
  • — I (S) $1250.00
  • — Z (S) $1250.00

1926.503 A01

Deleted Serious Gravity 03 1 instance 2 exposed
Issued
Mar 11, 1998
Abate by
Apr 13, 1998
Penalty
Initial $375 · Current $375
Recent events (2)
  • — I (S) $375.00
  • — Z (S) $375.00

1926.451 F07

Serious Gravity 03 1 instance 2 exposed
Issued
Mar 11, 1998
Abate by
Apr 13, 1998
Penalty
Initial $375 · Current $150 Reduced
Recent events (2)
  • — I (S) $150.00
  • — Z (S) $375.00

1926.454 A

Serious Gravity 03 1 instance 2 exposed
Issued
Mar 11, 1998
Abate by
Apr 13, 1998

1926.454 B

Serious Gravity 03 1 instance 2 exposed
Issued
Mar 11, 1998
Abate by
Apr 13, 1998

1926.501 B11

Serious Gravity 10 1 instance 2 exposed
Issued
Mar 11, 1998
Abate by
Mar 30, 1998
Penalty
Current $500
Recent events (3)
  • — Q $500.00
  • — I (S) $500.00
  • — Z (S) $500.00

1926.503 A01

Serious Gravity 03 1 instance 2 exposed
Issued
Mar 11, 1998
Abate by
Apr 13, 1998
Recent events (2)
  • — I (S)
  • — Z (S)

View Price Construction's full OSHA safety record →