THREE RIVERS, TX —
OSHA Inspection: NABORS DRILLING USA, INC. RIG #424
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of NABORS DRILLING USA, INC. RIG #424 in 5 MILES NORTH OF THREE RIVERS, TX ON IH37, THREE RIVERS, TX 78071 (NAICS 000000). OSHA activity number 302096417.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- NABORS DRILLING USA, INC. RIG #424
- Site address
- 5 MILES NORTH OF THREE RIVERS, TX ON IH37
- City
- THREE RIVERS
- State
- TX
- ZIP
- 78071
- Mailing
- 8400 BREEN ROAD, HOUSTON, TX 77064
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 1381
- Employees
- 22
- Ownership type
- A
Citations
7 citations on file for this inspection.
5(a)(1)
- Issued
- Sep 30, 1998
- Abate by
- Oct 4, 1998
- Penalty
- Initial $5,000
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to a fire and explosion: Employee was exposed to the hazard of fire and explosion due to the failure to erect a properly installed Geronimo emergency escape line which did not lay across the top guardrail of the employee access to the pipe racking board and Geronimo emergency escape device which prevented the employee from being able to stand in an upright position in order to get onto the Geronimo emergency escape device prior to descending to ground level. This occurred on or about April 29, 1998 at Rig Number 424 which was located and being operated five (5) miles North of Three Rivers, Texas on IH 37, Three Rivers, Texas 77081. Among other methods, one feasible and acceptable abatement method to correct this hazard would be installation of a properly rigged and secured emergency descent or other satisfactory auxiliary means of egress, such as specified on page 12 in Section 5, Sub-Section 5.7, Paragraph 5.7.1 of American Petroleum Institute (API) RP 54-92. Essential elements of this procedure would include: a.Installation of a securely anchored one-half (1/2) inch wire rope escape line attached to the derrick or mast so as to provide a ready and convenient means of escape from the derrickman's working platform. b.The escape line route is to be kept clear of obstructions. c.A safety device is to be provided to permit fast emergency exit from the derrickman's working platform to a safe place. d.The tension on the escape line is to be periodically checked and adjusted to assure a safe landing and to allow the derrickman to stop twenty (20) to twenty-five (25) feet from the anchor point. e.The ground anchor point of the escape line is to be located a minimum lateral distance from the derrick or mast equal to the height above ground level to the point where the escape line is fastened to the derrick or mast. *** Certification and Documentation of Abatement required ***uired
Recent events (2)
- — F (S)
- — Z (S) $5000.00
1910.151 C
- Issued
- Sep 30, 1998
- Abate by
- Oct 5, 1998
- Penalty
- Initial $2,500 · Current $800 Reduced
Recent events (2)
- — F (S) $800.00
- — Z (S) $2500.00
1910.304 A02
- Issued
- Sep 30, 1998
- Abate by
- Oct 4, 1998
- Penalty
- Initial $2,500
Recent events (2)
- — F (O)
- — Z (S) $2500.00
1910.305 B01
- Issued
- Sep 30, 1998
- Abate by
- Oct 4, 1998
- Penalty
- Initial $2,500
Recent events (2)
- — F (O)
- — Z (S) $2500.00
1910.307 B
- Issued
- Sep 30, 1998
- Abate by
- Oct 4, 1998
- Penalty
- Initial $2,500 · Current $200 Reduced
Recent events (2)
- — F (O) $200.00
- — Z (S) $2500.00
1910.1200 E01 I
- Issued
- Sep 30, 1998
- Abate by
- Oct 4, 1998
- Penalty
- Initial $1,500 · Current $100 Reduced
Recent events (2)
- — F (O) $100.00
- — Z (S) $1500.00
1910.305 G02 III
- Issued
- Sep 30, 1998
- Abate by
- Oct 4, 1998
- Penalty
- Initial $5,000 · Current $4,000 Reduced
Recent events (2)
- — F (U) $4000.00
- — Z (R) $5000.00
More inspections in this industry (NAICS 000000)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 302096417.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.