Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: GASTON ELECTRIC CONTRACTORS

Unprogrammed Related inspection · Health discipline

On , OSHA opened an unprogrammed Related health inspection of GASTON ELECTRIC CONTRACTORS in 1201 TULIP DR., GASTONIA, NC 28052 (NAICS 000000). OSHA activity number 302138375.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Gaston Electric Contractors — free Get an email when a new federal OSHA severe-injury report for Gaston Electric Contractors is published. One employer, no account, unsubscribe in one click.
Site address
1201 TULIP DR.
City
GASTONIA
State
NC
ZIP
28052
Mailing
PO BOX 400, GASTONIA, NC 28053
Inspection type
Unprogrammed Related (G)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
000000
SIC code (legacy)
1731
Employees
6
Ownership type
A
Industry flags
Construction health.

2 citations on file for this inspection.

95012901

Serious Gravity 02 1 instance
Issued
Jun 11, 1998
Abate by
Jun 16, 1998
Penalty
Initial $1,000 · Current $500 Reduced
North Carolina General Statute 95-129 (1) of the Occupational Safety and
Health Act of North
Carolina:  The employer did not furnish to each of his employees
conditions of employment and
a place of employment which were free from recognized hazards that were
causing or likely to
cause death or serious physical harm to employees:
a)MEC Aerial Work Platform, employee was observed working while standing on
the top rail of the lift while it was fully extended to its maximum height
of 16
feet with no type of fall protection.
Reference ANSI A92.6-1990 Self-Propelled Elevating Work Platforms
Personnel Footing 8.10.1
- Personnel shall maintain a firm footing on the platform floor while
working thereon.  Use of
planks, ladders, or any other devices on the platform for achieving
additional height or reach
shall be prohibited.
Among other methods, one feasible and acceptable method to correct these
hazards would be to
follow all of the requirements of ANSI A92.6-1990 Self-Propelled Elevating
Work Platforms
when employees are working from these devices.
Recent events (2)
  • — I (S) $500.00
  • — Z (S) $1000.00

95012901

Serious Gravity 02 1 instance 1 exposed
Issued
Jun 11, 1998
Abate by
Jun 16, 1998
North Carolina General Statute 95-129 (1) of the Occupational Safety and
Health Act of North
Carolina:  The employer did not furnish to each of his employees
conditions of employment and
a place of employment which were free from recognized hazards that were
causing or likely to
cause death or serious physical harm to employees:
a)MEC Aerial Work Platform, there was no midrail on the entrance to the
work
platform.
Reference ANSI A92.6-1990 Self-Propelled Elevating Work Platforms
Platforms 4.12.2.2 Mid-
Rail - The guardrail system shall include a mid-rail approximately midway
between
the top rail
and the platform surface.
Among other methods, one feasible and acceptable method to correct these
hazards would be to
follow al the requirements of ANSI A92.6-1990 Self Propelled Elevating
Work Platforms when
employees are working from these devices.

View Gaston Electric Contractors's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 302138375.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.