OSHA Inspection: DAVE STEEL COMPANY INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of DAVE STEEL COMPANY INC. in 76 ROBERTS STREET, ASHEVILLE, NC 28802 (NAICS 000000). OSHA activity number 302645080.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Dave Steel Company INC. — free Get an email when a new federal OSHA severe-injury report for Dave Steel Company INC. is published. One employer, no account, unsubscribe in one click.
Site address
76 ROBERTS STREET
City
ASHEVILLE
State
NC
ZIP
28802
Mailing
P.O. BOX 2630, ASHEVILLE, NC 28802
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Y
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
3441
Employees
8
Ownership type
A
Industry flags
Manufacturing safety.

19 citations on file for this inspection.

95012901

Serious 1 instance 2 exposed
Issued
Mar 2, 1999
Abate by
Mar 8, 1999
Penalty
Initial $750 · Current $750
North Carolina General Statute 95-129(1) of the Occupational Safety
and Health Act of North Carolina:  The employer did not furnish to
each of his employees conditions of employment and a place of
employment which were free from recognized hazards that were
causing or likely to cause death or serious physical harm to
employees:
a) Roberts Street facility  --  the Ingersoll Rand monorail
crane was not load tested prior to initial use.
Reference:ANSI B30.11-1980; paragraph 11-2.2.2(a)
Rated Load Test prior to initial use, all
the equipment mentioned in the above
paragraph is to be tested...
NOTE: Among other methods, one feasible and
acceptable method to correct this hazard is to
load test all cranes as per ANSI B30.11-1980.
b) Roberts Street facility  --  no load test report was
available for the Ingersoll Rand monorail crane outside
the building.
Reference:  ANSI B30.11-1980: paragraph 11-2.2.2(a)
Test reports shall be placed on file.
NOTE: Among other methods, one feasible and
acceptable method to correct this hazard is to
conduct the load test and have the test report
readily available.
c)  Roberts Street facility  --  complete inspection of the
Ingersoll Rand monorail crane outside the building was
not performed at intervals as defined in ANSI B30.11-
2.1.1(b)(2) with inspection records maintained.
Reference:  ANSI B30.11-1980; paragraph 11-2.1l3(b)
complete inspection of the crane or
monorail system shall be performed at
intervals as defined in 11-2.1.1(b)(2).
NOTE: Among other methods, one feasible and
acceptable method to correct this hazard is to
conduct periodic inspections of the crane and
maintain records of the inspections.

1910.184 E03 I

Deleted Serious 15 instances 8 exposed
Issued
Mar 2, 1999
Abate by
Mar 15, 1999
Penalty
Initial $750 · Current $750
Recent events (2)
  • — I (S) $750.00
  • — Z (S) $750.00

1910.184 E03 II

Deleted Serious 15 instances 8 exposed
Issued
Mar 2, 1999
Abate by
Mar 15, 1999
Recent events (2)
  • — I (S)
  • — Z (S)

1910.184 E03 III 1

Deleted Serious 1 instance 8 exposed
Issued
Mar 2, 1999
Abate by
Mar 15, 1999
Recent events (2)
  • — I (S)
  • — Z (S)

1910.184 E01

Deleted Serious 7 instances 8 exposed
Issued
Mar 2, 1999
Abate by
Mar 15, 1999
Recent events (2)
  • — I (S)
  • — Z (S)

1910.184 E04

Deleted Serious 15 instances 8 exposed
Issued
Mar 2, 1999
Abate by
Mar 15, 1999
Recent events (2)
  • — I (S)
  • — Z (S)

1910.215 B09

Serious 1 instance 2 exposed
Issued
Mar 2, 1999
Abate by
Mar 8, 1999
Penalty
Initial $375 · Current $375

1910.215 B09

Serious 1 instance 2 exposed
Issued
Mar 2, 1999
Abate by
Mar 8, 1999

1910.305 B01

Serious 1 instance 3 exposed
Issued
Mar 2, 1999
Abate by
Mar 8, 1999
Penalty
Initial $263 · Current $263

1910.305 B01

Serious 1 instance 3 exposed
Issued
Mar 2, 1999
Abate by
Mar 8, 1999

1910.305 G02 III

Serious 1 instance 3 exposed
Issued
Mar 2, 1999
Abate by
Mar 8, 1999

1910.22 A01

Other-than-serious 1 instance 8 exposed
Issued
Mar 2, 1999
Abate by
Mar 8, 1999

1910.37 K02

Other-than-serious 1 instance 1 exposed
Issued
Mar 2, 1999
Abate by
Mar 8, 1999

1910.37 Q01

Other-than-serious 5 instances 8 exposed
Issued
Mar 2, 1999
Abate by
Mar 15, 1999

1910.141 A03 I

Other-than-serious 1 instance 8 exposed
Issued
Mar 2, 1999
Abate by
Mar 8, 1999

1910.252 B02 III

Other-than-serious 1 instance 8 exposed
Issued
Mar 2, 1999
Abate by
Mar 15, 1999

1910.305 G01 IIIA

Other-than-serious 1 instance 8 exposed
Issued
Mar 2, 1999
Abate by
Mar 15, 1999

1910.305 G01 IIIB

Other-than-serious 2 instances 8 exposed
Issued
Mar 2, 1999
Abate by
Mar 15, 1999

1910.1200 F05 I

Other-than-serious 2 instances 8 exposed
Issued
Mar 2, 1999
Abate by
Mar 10, 1999

View Dave Steel Company INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 302645080.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.