OSHA Inspection: WALKISOFT USA, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of WALKISOFT USA, INC. in 100 UPM DRIVE, MOUNT HOLLY, NC 28120 (NAICS 000000). OSHA activity number 302889837.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Walkisoft USA, INC. for free Get an email when a new federal OSHA severe-injury report for Walkisoft USA, INC. is published. One employer, no account, unsubscribe in one click.
Establishment
WALKISOFT USA, INC.
Site address
100 UPM DRIVE
City
MOUNT HOLLY
State
NC
ZIP
28120
Mailing
100 UPM DRIVE, MT. HOLLY, NC 28120
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Non-union (N)
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
2676
Employees
60
Ownership type
Private (A)
Industry flags
Manufacturing safety.

5 citations on file for this inspection.

95012901

Serious 4 instances 1 exposed
Issued
Jul 27, 1999
Abate by
Aug 14, 1999
Penalty
Initial $100 · Current $100
North Carolina General Statute 95-129(1) of the Occupational Safety
and Health Act of North Carolina:  The employer did not furnish to
each of his employees conditions of employment and a place of
employment which were free from recognized hazards that were
causing or likely to cause death or serious physical harm to
employees:
a)facility; machine hall - monorail system with a 1/2 ton
Stahl hoist has not been load tested.
b)facility; hammermill area - monorail system with a Yale
1/2 ton hoist has not been load tested.
c)facility; hammermill area - monorail system with a CM 1
ton hoist has not been load tested.
d)facility; hammermill area - monorail system with a Yale
1/2 ton hoist has not been load tested.
Reference:  ANSI B30.11-1980;paragraph 11.2.2.2(a) Rated load
test - Prior to initial use, all the equipment mentioned in
the above paragraph is to be tested...
NOTE:  Among other methods, one feasible and acceptable
method to correct this hazard is to load test the
monorail systems.

1910.179 K02

Serious 3 instances 1 exposed
Issued
Jul 27, 1999
Abate by
Aug 14, 1999
Penalty
Initial $100 · Current $100

1910.147 C04 I

Other-than-serious 1 instance 1 exposed
Issued
Jul 27, 1999
Abate by
Aug 14, 1999

1910.212 B

Other-than-serious 1 instance 1 exposed
Issued
Jul 27, 1999
Abate by
Aug 14, 1999

1910.1200 E01

Other-than-serious 1 instance 1 exposed
Issued
Jul 27, 1999
Abate by
Aug 14, 1999

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 302889837.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.