WEST HAZLETON, PA —
OSHA Inspection: GFC FOAM LLC
Complaint inspection · Health discipline
At a glance
On , OSHA opened a complaint health inspection of GFC FOAM LLC in 25 JAYCEE DRIVE, WEST HAZLETON, PA 18201 (NAICS 000000). OSHA activity number 303340400.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- GFC FOAM LLC
- Site address
- 25 JAYCEE DRIVE
- City
- WEST HAZLETON
- State
- PA
- ZIP
- 18201
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3086
- Employees
- 200
- Ownership type
- A
Citations
1 citation on file for this inspection.
5(a)(1)
- Issued
- Nov 16, 2000
- Abate by
- Mar 31, 2001
- Penalty
- Initial $2,125 · Current $800 Reduced
8420X1001410
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to fire and explosion hazards from the foam reticulation process. a) Reticulation process: The Joyce 540 thermal reticulation chamber, pressure relief devices, and appurtenances were not inspected, tested, and maintained in accordance with the National Board Inspection Code, ANSI / NB-23. b) Reticulation process: The hydrogen feed piping system of the Joyce 540 thermal reticulation chamber, was not inspected, tested, and maintained in accordance with the Compressed Gas Association, Standard for Hydrogen Piping Systems at Consumer Locations, CGA G-5.4. c) Reticulation process: The oxygen feed piping system of the Joyce 540 thermal reticulation chamber, was not inspected, tested, and maintained in accordance with the Compressed Gas Association, Industrial Practices for Gaseous Oxygen Transmission and Distribution Piping Systems, CGA G-4.4. "ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED" AMONG OTHER METHODS, FEASIBLE AND ACCEPTABLE ABATEMENT METHODS TO CORRECT THESE HAZARDS ARE: 1) Inspect, test, and maintain the Reticulation Process equipment per the referenced standards and codes. 2) Reference American Petroleum Institute, Piping Inspection Code, API 570, which offers additional guidance in hydrogen and oxygen service. 3) Reticulator operators should be trained in hazard recognition, evaluation, and control per API 570, 1.4.5.
Recent events (2)
- — I (O) $800.00
- — Z (S) $2125.00
More inspections at GFC Foam LLC
View GFC Foam LLC's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 303340400.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.