AURORA, OH —
OSHA Inspection: SIX FLAGS OHIO - GEAUGA LAKE PARK
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of SIX FLAGS OHIO - GEAUGA LAKE PARK in 1060 NORTH AURORA ROAD, AURORA, OH 44202 (NAICS 000000). OSHA activity number 303481642.
Where did this inspection happen?
- Establishment
- SIX FLAGS OHIO - GEAUGA LAKE PARK
- Site address
- 1060 NORTH AURORA ROAD
- City
- AURORA
- State
- OH
- ZIP
- 44202
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 7996
- Employees
- 900
- Ownership type
- A
Citations
2 citations on file for this inspection.
5(a)(1)
- Issued
- Jun 13, 2000
- Abate by
- Jun 16, 2000
- Penalty
- Initial $1,625 · Current $1,138 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: On or before May 30, 2000, employees who worked the Batman Ride, were exposed to potential falls and/or caught in hazards caused by the unexpected activation/movement of the ride's combs and front swing gates. On May 30, 2000, upon interruption of either light curtain, the ride's programming allowed the operation of the combs to resume after the subject source of the interruption of the light curtain was removed, i.e., a hat, thus resulting in injury to an employee who was, at that specific time, still walking across the combs. Additionally, after a dispatch cycle had been initiated by the panel operator, the swing gate located in front of the train remained open even with an interruption of either light curtain had occurred. Among other methods, one feasible and acceptable method to correct the hazard(s) is to revise the control system program to synchronize the operation of the combs and front swing gate and to interlock the control of the combs and front swing gate with both light curtains and the ride dispatch sequence. Upon interruption of either light curtain, the operation of the combs and front swing gate will stop and disable further operation. After the source of the interruption in the light curtain is removed, e.g., a hat, the ride dispatch sequence must be reinitiated before the operation of the combs and front swing gate can be resumed. The utilization of enable buttons or pressure sensing pads for each employee on the loading/unloading deck will further ensure safe positioning of all effected employees during the dispatch sequence.
Recent events (2)
- — I (S) $1137.50
- — Z (S) $1625.00
1910.23 C01
- Issued
- Jun 13, 2000
- Abate by
- Jun 16, 2000
- Penalty
- Initial $975 · Current $683 Reduced
Recent events (2)
- — I (S) $682.50
- — Z (S) $975.00
More inspections at SIX Flags Ohio - Geauga Lake Park
View SIX Flags Ohio - Geauga Lake Park's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in OH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 303481642.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.