Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: PARSONS MANAGEMENT CONSULTANTS

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of PARSONS MANAGEMENT CONSULTANTS in 23835 WIND SOCK DRIVE, CHANTILLY, VA 20151 (NAICS 000000). OSHA activity number 303900534.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Parsons Management Consultants — free Get an email when a new federal OSHA severe-injury report for Parsons Management Consultants is published. One employer, no account, unsubscribe in one click.
Site address
23835 WIND SOCK DRIVE
City
CHANTILLY
State
VA
ZIP
20151
Mailing
P.O. BOX 17451, WASHINGTON, DC 20041
Inspection type
Unprogrammed Related (G)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
000000
SIC code (legacy)
8742
Employees
60
Ownership type
A
Industry flags
Construction safety.

2 citations on file for this inspection.

510001 A

Deleted Serious 1 instance 3 exposed
Issued
Apr 30, 2001
Abate by
May 4, 2001
Penalty
Initial $7,000 · Current $7,000
Title 40.1-51.1(a), Code of Virginia: The employer did not furnish
employment and a place of
employment which were free from recognized hazards that were causing or
likely to cause death
or serious physical harm to employees in that employees were exposed to a
tunnel cave-in hazard
while constructing a pedestrian walkback tunnel (south end) at Dulles
Airport.  On November 1,
2000, an employee of Kiewit Construction Company was killed when a section
of the tunnel
collapsed.
During the week prior to the accident the Kiewit Construction Company, the
tunneling
contractor, experienced deteriorating soil conditions and three falloffs
of more than 1.0 cubic
yard (cy) of soil during tunneling operations between October 24th and
October 31st.   The falloffs
increased in severity from 1.0 cy on October 24th to 4.0 cy on October
25th to 5.0 cy on October
31st the day before the accident (no tunneling occurred on October 29-30,
2000).  Based on
tunneling records, it appears that there were only a total of ten falloffs
equal to or exceeding 1.0
cy, including the three already mentioned, that occurred at the site in
the six months preceding
the accident.
a)The tunnel was being built using the soft ground tunneling method known
as the New
Austrian Tunneling Method (NATM).  Contract specifications required that
an NATM
engineer report for work at the site at least six weeks prior to
commencement of the
access ramp excavation and to remain at the site for a minimum of four
weeks after
completion of all mined tunnel concrete lining work.
The NATM engineer, with the knowledge of Parsons Management Consultants
(the
Metropolitan Washington Airport Authoritys Contracting Officers Technical
Representative (COTR), was apparently not on site during the entire month
of October,
2000 and was on site  for only a brief portion of September, 2000, to
perform the
following duties, among others, under the contract:
To supervise the excavation to ensure safety and quality of construction.
To devise and implement local support measures as required by the ground
conditions, coordinating remedial measures when ground loss at mined tunnel
heading or instability of mined tunnel occurs, or when they appear likely.
[NOTE: Local Measures are defined under the contract specifications as
grouted
pipe spiling, rebar spiling and metal sheeting installed in a systematic
or non-systematic manner installed individually or otherwise in addition
to pre-support
specified for the respective Excavation and Support Class, for local
stabilization
and safety during tunneling.]
To prepare a written daily interpretation of instrumentation measurement
readings
during excavation.
To hold daily discussions with PMC at the tunnel face regarding ground
conditions and corresponding excavation and support requirements and other
supports and keeping written records thereof.
The NATM engineer was not present to address this escalating level of
falloffs, nor had
he even apparently been contacted on the falloffs.  Kiewits NATM
superintendents,approved under the contract, made no changes in the
tunneling method or tunneling
sequence, nor applied  local measures as defined in the contract to
support areas where
the falloffs occurred, beyond filling the falloff holes with shotcrete.
Contract drawing specifications define the tunnel excavation sequence and
support
mechanisms:
All support (flashcrete, shotcrete plus reinforcement) for each excavation
round must be
completed as shown prior to commencing next excavation round in sequence.
Support was to be applied immediately upon the completion of tunneling
each round:
apply 2 inches of flashcrete to all surfaces,
install the girders and spiling bolts (designed to reinforce the soil and
stabilize the
heading),
apply an additional 6 inches of shotcrete, before beginning tunneling on
the next
round,
contract drawings specified that the employer was supposed to stay 4 rounds
ahead on the southeast side of the tunnel, and alternate tunneling
operations
between one round on the southwest side and one round on the northeast
side of
the tunnel,
a total of  five rounds on the southeast side must be fully supported with
flashcrete, girders, spiling bolts and 8 inches of shotcrete before the
employer
could begin digging on the southwest side.
As allowed under the contract specifications, the above sequence could be
modified if
approved by PMC.  Apparently in response to stable ground conditions, the
employer
decided to only completely support one round on the southeast side with 2
inches
of
flashcrete, girders and spiling bolts, and 6 inches more of shotcrete,
then dig 4 more
rounds ahead and apply the initial 2 inches of flashcrete coating.  The
employer would
then start tunneling the next round on the southwest side while workers on
the southeast
side were putting up the girders, spiling bolts, and additional 6 inches
of shotcrete on the
remaining 4 rounds on the southeast side.   This revised tunneling
sequence resulted in
both headings lacking full support and stabilization at the same time
during tunneling
operations.
When ground conditions deteriorated during the week before the collapse,
the NATM
engineer was not present to address this escalating level of falloffs.  He
was not available
to revise the tunneling sequence to conform to contract specifications.
Kiewits NATM
superintendents made no changes in the tunneling method or tunneling
sequence in
response to the deteriorating soil conditions, nor applied  local measures
as defined in
the contract to support areas where the falloff occurred, beyond filling
the falloff holes
with shotcrete.
One feasible and acceptable abatement method among others to correct this
hazard is tocomply with the contract specifications, Sheet T3.4, Note 5.
Recent events (2)
  • — Y (S) $7000.00
  • — Z (S) $7000.00

510001 A

Unclassified 1 instance 3 exposed
Issued
Apr 30, 2001
Abate by
May 4, 2001
Penalty
Initial $25,000 · Current $9,500 Reduced
Title 40.1-51.1(a), Code of Virginia: The employer did not furnish
employment and a place of
employment which were free from recognized hazards that were causing or
likely to cause death
or serious physical harm to employees in that employees were exposed to a
tunnel cave-in hazard
while constructing a pedestrian walkback tunnel (south end) at Dulles
Airport.  On November 1,
2000, an employee of Kiewit Construction Company was killed when a section
of the tunnel
collapsed.
During the week prior to the accident the Employer experienced
deteriorating soil conditions and
three falloffs of more than 1.0 cubic yard (cy) of soil during tunneling
operations between
October 24th and October 31st.   The falloffs increased in severity from
1.0 cy on October 24th to
4.0 cy on October 25th to 5.0 cy on October 31st the day before the
accident. No tunneling
occurred on October 29-30, 2000.   Based on tunneling records, it appears
that there were only a
total of ten falloffs equal to or exceeding 1.0 cy, including the three
already mentioned, that
occurred at the site in the six months preceding the accident.
The tunnel was being built using the New Austrian Tunneling Method (NATM).
Kiewit Construction Company, the contractor hired to mine the tunnel, with
the approval
of Parsons Management Consultants (PMC) (the Metropolitan Washington
Airport
Authoritys Contracting Officers Technical Representative (COTR) on site),
reduced the
number of spiling bolts to be installed on each girder from approximately
19 to 13 as part
of the tunnel support system, by agreement dated August 22, 2000.  PMC
approved
this
reduction on two conditions: 1) that the tunneling was being conducted in
stable ground
conditions, and 2) is approved on a case-by-case basis based on the
employers NATM
engineers observations and recommendations.  The NATM engineer was
apparently not
on site during the entire month of October, 2000 to observe the
escalating level of
falloffs and deteriorating soil conditions in the week leading up to the
tunnel collapse.
The NATM engineer was not available to approve or change from the
continued use of 13
spiling bolts instead of the 19 or more provided for in the contract, nor
had he even
apparently been contacted on the falloffs.
One feasible and acceptable abatement method among others to correct this
hazard is to
comply with the contract specifications, Sheet T3, 4, Cross Section A.
Recent events (2)
  • — Y (U) $9500.00
  • — Z (W) $25000.00

View Parsons Management Consultants's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 303900534.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.