Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: SNAKE RIVER ELECTRICAL, INC.

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of SNAKE RIVER ELECTRICAL, INC. in BYU IDAHO CAMPUS, MULTI-USE BUILDING, REXBURG, ID 83440 (NAICS 000000). OSHA activity number 303956486.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Snake River Electrical, INC. — free Get an email when a new federal OSHA severe-injury report for Snake River Electrical, INC. is published. One employer, no account, unsubscribe in one click.
Site address
BYU IDAHO CAMPUS, MULTI-USE BUILDING
City
REXBURG
State
ID
ZIP
83440
Mailing
P.O. BOX 1006, BLACKFOOT, ID 83221
Inspection type
Unprogrammed Related (G)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Y
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
000000
SIC code (legacy)
1731
Employees
7
Ownership type
A

11 citations on file for this inspection.

1926.403 B01

Serious Gravity 03 5 instances 7 exposed
Issued
May 9, 2002
Abate by
May 15, 2002
Penalty
Initial $750 · Current $400 Reduced
Recent events (2)
  • — I (S) $400.00
  • — Z (S) $750.00

1926.403 B02

Serious Gravity 03 3 instances 7 exposed
Issued
May 9, 2002
Abate by
May 15, 2002
Recent events (2)
  • — I (S)
  • — Z (S)

1926.403 I02 II

Serious Gravity 03 7 instances 7 exposed
Issued
May 9, 2002
Abate by
May 15, 2002
Recent events (2)
  • — I (S)
  • — Z (S)

1926.405 A02 III

Serious Gravity 03 1 instance 7 exposed
Issued
May 9, 2002
Abate by
May 15, 2002
Recent events (2)
  • — I (S)
  • — Z (S)

1926.405 B01

Serious Gravity 03 2 instances 7 exposed
Issued
May 9, 2002
Abate by
May 15, 2002
Recent events (2)
  • — I (S)
  • — Z (S)

1926.405 G02 IV

Serious Gravity 03 1 instance 7 exposed
Issued
May 9, 2002
Abate by
May 15, 2002
Recent events (2)
  • — I (S)
  • — Z (S)

1926.502 B03

Serious Gravity 10 2 instances 7 exposed
Issued
May 9, 2002
Abate by
May 15, 2002
Penalty
Initial $1,500 · Current $750 Reduced
Recent events (2)
  • — I (S) $750.00
  • — Z (S) $1500.00

1926.1052 C01 II

Serious Gravity 10 1 instance 7 exposed
Issued
May 9, 2002
Abate by
May 15, 2002
Recent events (2)
  • — I (S)
  • — Z (S)

1926.1052 C03 I

Serious Gravity 10 1 instance 7 exposed
Issued
May 9, 2002
Abate by
May 15, 2002
Recent events (2)
  • — I (S)
  • — Z (S)

1926.1052 C04 I

Serious Gravity 10 1 instance 7 exposed
Issued
May 9, 2002
Abate by
May 15, 2002
Recent events (2)
  • — I (S)
  • — Z (S)

1926.1060 A01 I

Serious Gravity 10 1 instance 7 exposed
Issued
May 9, 2002
Abate by
May 29, 2002
Recent events (2)
  • — I (S)
  • — Z (S)

View Snake River Electrical, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 303956486.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.