OSHA Inspection: SOUTHCO INDUSTRIES, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of SOUTHCO INDUSTRIES, INC. in 1840 EAST DIXON BLVD., SHELBY, NC 28152 (NAICS 000000). OSHA activity number 303993794.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Southco Industries, INC. — free Get an email when a new federal OSHA severe-injury report for Southco Industries, INC. is published. One employer, no account, unsubscribe in one click.
Site address
1840 EAST DIXON BLVD.
City
SHELBY
State
NC
ZIP
28152
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
000000
SIC code (legacy)
3713
Employees
120
Ownership type
A
Industry flags
Manufacturing safety.

13 citations on file for this inspection.

95012901

Serious 1 instance 1 exposed
Issued
Oct 3, 2000
Abate by
Nov 6, 2000
Penalty
Initial $438 · Current $241 Reduced
North Carolina General Statute 95-129(1) of the Occupational Safety
and Health Act of North Carolina:  The employer did not furnish to
each of his employees conditions of employment and a place of
employment which were free from recognized hazards that were
causing or likely to cause death or serious physical harm to
employees:
a)facility, box room -- the upper limit switch was
inoperative on a 1 ton CM monorail overhead electric
hoist.
REFERENCE:ANSI B30.11-1980, paragraph 11-2.2.1(b)(4)
Operational Testing.  The hoist upper limit of
travel device (the actuating mechanism of the
hoist-limit device shall be located or adjusted so
that it will trip the device in sufficient time to
prevent contact of the load block or load with any
part of the carrier or bridge.
NOTE:Among other methods, one feasible and acceptable method
to correct this hazard is to have the upper limit switch
adjusted properly to prevent the load block or load from
contacting the carrier.ng
Recent events (2)
  • — I (S) $240.90
  • — Z (S) $438.00

95012901

Serious 1 instance 1 exposed
Issued
Oct 3, 2000
Abate by
Nov 6, 2000
Penalty
Initial $438 · Current $241 Reduced
North Carolina General Statute 95-129(1) of the Occupational Safety
and Health Act of North Carolina:  The employer did not furnish to
each of his employees conditions of employment and a place of
employment which were free from recognized hazards that were
causing or likely to cause death or serious physical harm to
employees:
a)facility -- initial load test were not conducted on CM
Loadstar 1 ton monorail electric hoists throughout the
facility before initial use of the hoists.
REFERENCE:ANSI B30.11-1980, paragraph 11-2.2.2 Load Testing.
NOTE:Among other methods, one feasible and acceptable method
to correct this hazard is to have a load test of all
overhead hoists used in the facility.
Recent events (2)
  • — I (S) $240.90
  • — Z (S) $438.00

95012901

Serious 1 instance 1 exposed
Issued
Oct 3, 2000
Abate by
Nov 6, 2000
Penalty
Initial $438 · Current $241 Reduced
North Carolina General Statute 95-129(1) of the Occupational Safety
and Health Act of North Carolina:  The employer did not furnish to
each of his employees conditions of employment and a place of
employment which were free from recognized hazards that were
causing or likely to cause death or serious physical harm to
employees:
a)facility -- frequent inspections of all CM Loadstar 1 ton
monorail hoists were not being conducted.
REFERENCE:ANSI B30.11-1980, paragraph 11-2.1.2 Frequent
Inspection
NOTE:Among other methods, one feasible and acceptable method
to correct this hazard is to conduct frequent inspections
of the hoists as identified in the ANSI standards.
Recent events (2)
  • — I (S) $240.90
  • — Z (S) $438.00

1910.179 H01 II

Serious 1 instance 1 exposed
Issued
Oct 3, 2000
Abate by
Nov 6, 2000
Penalty
Initial $438 · Current $241 Reduced
Recent events (2)
  • — I (S) $240.90
  • — Z (S) $438.00

1910.179 J02

Serious 1 instance 1 exposed
Issued
Oct 3, 2000
Abate by
Nov 6, 2000
Penalty
Initial $438 · Current $241 Reduced
Recent events (2)
  • — I (S) $240.90
  • — Z (S) $438.00

1910.179 J02 III

Serious 1 instance 1 exposed
Issued
Oct 3, 2000
Abate by
Nov 6, 2000

1910.179 J02 IV

Serious 1 instance 1 exposed
Issued
Oct 3, 2000
Abate by
Nov 6, 2000

1910.179 K01

Serious 1 instance 1 exposed
Issued
Oct 3, 2000
Abate by
Nov 6, 2000

1910.184 E01

Serious 1 instance 1 exposed
Issued
Oct 3, 2000
Abate by
Nov 6, 2000
Penalty
Initial $438 · Current $241 Reduced
Recent events (2)
  • — I (S) $240.90
  • — Z (S) $438.00

1910.184 E03 I

Serious 1 instance 1 exposed
Issued
Oct 3, 2000
Abate by
Nov 6, 2000

1910.184 E03 II

Serious 1 instance 1 exposed
Issued
Oct 3, 2000
Abate by
Nov 6, 2000

1910.184 E03 III

Serious 1 instance 1 exposed
Issued
Oct 3, 2000
Abate by
Nov 6, 2000

1910.184 E04

Serious 1 instance 1 exposed
Issued
Oct 3, 2000
Abate by
Nov 6, 2000

View Southco Industries, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 303993794.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.