Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,645Inspections Most recent open 2026-07-16 Last loaded 2026-07-20

OSHA Inspection: LCDO FIDEL ALONSO

Unprogrammed Related inspection · Health discipline

On , OSHA opened an unprogrammed Related health inspection of LCDO FIDEL ALONSO in CARR 3 EDIFICIO IRAOLA, GUAYAMA, PR 00784 (NAICS 000000). OSHA activity number 304231020.

Watch Lcdo Fidel Alonso — free Get an email when a new federal OSHA severe-injury report for Lcdo Fidel Alonso is published. One employer, no account, unsubscribe in one click.
Establishment
LCDO FIDEL ALONSO
Site address
CARR 3 EDIFICIO IRAOLA
City
GUAYAMA
State
PR
ZIP
00784
Mailing
CALLE SANTA ANA 1660, SANTURCE, PR 00909
Inspection type
Unprogrammed Related (G)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
9999
Employees
1
Ownership type
A

2 citations on file for this inspection.

6A0001

Serious 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $225.00 · Current $225.00
Section 6(a) of the Puerto Rico Occupational Safety and Health Act:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing or likely to cause death or physical harm to employees in
that employees were
exposed to:
Seccion 6(a) de la Ley de Seguridad y Salud en el Trabajo de Puerto Rico:
El patrono no
proveyo empleo y un sitio de empleo libre de riesgos reconocidos que esten
causando o que
puedan causar muerte o dano fisico a los empleados, por cuanto empleados
estaban expuestos
a:
At the establishment - Accustic tile was deteriorated by filtrations from
rain, this was observed
in differents locations of the establishment, also containers were located
to collect the water from
the ceiling.
Among others methods, one feasible and acceptable method to correct the
hazard
is to correct
the filtrations and replace the tile.
Hazard: Contusions, and trauma.
En el establecimiento - Techo acustico estaba deteriorado por las
filtraciones de lluvia, se
observo en diferentes lugares del establecimiento, tambien se colocaron
contenedores para
recoger el agua del techo.
Entre otros metodos, un metodo factible y aceptable de corregir el riesgo
es corregir las
filtraciones y remplazar el techo acustico.
Riesgo: Contusiones, y trauma.ones,

1910.141 A05

Serious Gravity 01 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $225.00 · Current $225.00

KGC, INC.

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 304231020.