ROCKY MOUNT, NC —
OSHA Inspection: DILLON SUPPLY CO
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of DILLON SUPPLY CO in 348 S WASHINGTON ST, ROCKY MOUNT, NC 27801 (NAICS 000000). OSHA activity number 304260482.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- DILLON SUPPLY CO
- Site address
- 348 S WASHINGTON ST
- City
- ROCKY MOUNT
- State
- NC
- ZIP
- 27801
- Mailing
- PO BOX 1111, RALEIGH, NC 27602
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 5085
- Employees
- 28
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
11 citations on file for this inspection.
1910.23 C02
- Issued
- Jul 13, 2001
- Abate by
- Aug 8, 2001
- Penalty
- Initial $1,400 · Current $980 Reduced
Recent events (2)
- — I (S) $980.00
- — Z (S) $1400.00
1910.132 D01
- Issued
- Jul 13, 2001
- Abate by
- Aug 8, 2001
- Penalty
- Initial $700
Recent events (2)
- — I (S)
- — Z (S) $700.00
1910.135 A01
- Issued
- Jul 13, 2001
- Abate by
- Aug 8, 2001
Recent events (2)
- — I (S)
- — Z (S)
1910.145 F03
- Issued
- Jul 13, 2001
- Abate by
- Aug 8, 2001
- Penalty
- Initial $250 · Current $175 Reduced
Recent events (2)
- — I (S) $175.00
- — Z (S) $250.00
1910.147 C01
- Issued
- Jul 13, 2001
- Abate by
- Aug 8, 2001
Recent events (2)
- — I (S)
- — Z (S)
1910.179 C02
- Issued
- Jul 13, 2001
- Abate by
- Aug 8, 2001
- Penalty
- Initial $700 · Current $490 Reduced
Recent events (2)
- — I (S) $490.00
- — Z (S) $700.00
1910.179 D04 III
- Issued
- Jul 13, 2001
- Abate by
- Aug 8, 2001
Recent events (2)
- — I (S)
- — Z (S)
1910.179 J02 VI
- Issued
- Jul 13, 2001
- Abate by
- Aug 8, 2001
Recent events (2)
- — I (S)
- — Z (S)
1910.179 L02 I
- Issued
- Jul 13, 2001
- Abate by
- Aug 8, 2001
Recent events (2)
- — I (S)
- — Z (S)
1910.179 L03 I
- Issued
- Jul 13, 2001
- Abate by
- Aug 8, 2001
Recent events (2)
- — I (S)
- — Z (S)
1910.303 F
- Issued
- Jul 13, 2001
- Abate by
- Aug 8, 2001
- Penalty
- Initial $250
Recent events (2)
- — I (S)
- — Z (S) $250.00
More inspections at Dillon Supply CO
View Dillon Supply CO's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in NC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 304260482.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.