OSHA Inspection: MARLIN CONTRACTING CO., INC.

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of MARLIN CONTRACTING CO., INC. in WORTHAM & SAUCIER-LOZANO RD., GULFPORT, MS 39506 (NAICS 237130). OSHA activity number 304316938.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Marlin Contracting CO., INC. — free Get an email when a new federal OSHA severe-injury report for Marlin Contracting CO., INC. is published. One employer, no account, unsubscribe in one click.
Site address
WORTHAM & SAUCIER-LOZANO RD.
City
GULFPORT
State
MS
ZIP
39506
Mailing
126 HIGHWAY 3185, THIBODAUX, LA 70301
Inspection type
Referral (C)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237130
SIC code (legacy)
1623
Employees
8
Ownership type
A

12 citations on file for this inspection.

5(a)(1)

Serious Gravity 10 7 instances 6 exposed
Issued
Jun 13, 2003
Abate by
Jun 19, 2003
Penalty
Initial $4,200 · Current $2,520 Reduced
Section 5(a)(1) of Public Law 91-596, the Occupational Safety and Health
Act of 1970:  The
employer did not furnish employment and a place of employment which were
free from
recognized hazards that were causing or likely to cause death or serious
physical harm to
employees, in that employees were exposed to an electrical shock hazard as
the rubber insulating
blankets, line hose and covers had not been electrically tested:
Wortham & Saucier-Lozano Road, Gulfport -
(a)Rubber insulating blankets that were available and being used by
employees
installing the third conductor to convert a 14.4 kv single phase system to
a three phase
system during the period December 23, 2002 thru January 8, 2003 had
visible physical
damage. The rubber insulating blankets had not been tested within the
prior 12 months
to ensure their safe reliable condition. There were no test dates marked
on them and a
record of the last test was not kept by the company.
(b)Rubber insulating line hoses and covers during the period December 23,
2002 thru
January 8, 2003 had visible physical damage.  The rubber insulating line
hoses and
covers had not been inspected or electrically tested to ensure that the
electrical insulating
value was not compromised.
Among others, one feasible and useful method to correct this hazard is to:
Comply with the Marlin Contracting, Co.'s safety manual which is the
American Public
Power Association (APPA) Safety Manual, Twelfth Edition, 1999.  Section 602
delineates the rubber insulating equipment test intervals.
Recent events (2)
  • — I (S) $2520.00
  • — Z (S) $4200.00

5(a)(1)

Serious Gravity 10 2 instances 7 exposed
Issued
Jun 13, 2003
Abate by
Jun 19, 2003
Penalty
Initial $3,000 · Current $1,760 Reduced
Section 5(a)(1) of Public Law 91-596, the Occupational Safety and Health
Act of 1970:  The
employer did not furnish employment and a place of employment which were
free from
recognized hazards that were causing or likely to cause death or serious
physical
harm to
employees, in that employees were exposed to being struck-by vehicles
passing through a
workzone as the employer had not established a transition area when
redirection of the road
users' normal path was required:
(a)Wortham & Saucier-Lozano Road, Gulfport - Utility workers during the
period
December 23, 2002 thru January 8, 2003 were installing an overhead
electrical power
distribution line.  The company's transportation equipment was placed in
and adjacent
to a traffic lane and were not protected from the traffic by use of
barricades and/or
barriers.
Among others, on feasible and useful method to correct this hazard is to:
Follow the requirements for the establishment of temporary traffic control
zones and
transition areas in Part VI of the Manual on Uniform Traffic Control
Devices
(Millennium Edition).
Recent events (2)
  • — I (S) $1760.00
  • — Z (S) $3000.00

1926.21 B02

Serious Gravity 10 1 instance 4 exposed
Issued
Jun 13, 2003
Abate by
Jun 19, 2003
Penalty
Initial $4,200 · Current $2,520 Reduced
Recent events (2)
  • — I (S) $2520.00
  • — Z (S) $4200.00

1926.95 A

Serious Gravity 10 7 instances 6 exposed
Issued
Jun 13, 2003
Abate by
Jun 19, 2003
Penalty
Initial $4,200 · Current $2,520 Reduced
Recent events (2)
  • — I (S) $2520.00
  • — Z (S) $4200.00

1926.201 A

Serious Gravity 10 3 instances 7 exposed
Issued
Jun 13, 2003
Abate by
Jun 19, 2003
Penalty
Initial $3,000 · Current $1,760 Reduced
Recent events (2)
  • — I (S) $1760.00
  • — Z (S) $3000.00

1926.950 C01

Serious Gravity 10 2 instances 6 exposed
Issued
Jun 13, 2003
Abate by
Jun 19, 2003
Penalty
Initial $4,200 · Current $2,520 Reduced
Recent events (2)
  • — I (S) $2520.00
  • — Z (S) $4200.00

1926.950 D01 V

Serious Gravity 10 1 instance 1 exposed
Issued
Jun 13, 2003
Abate by
Jun 19, 2003
Penalty
Initial $4,200 · Current $2,520 Reduced
Recent events (2)
  • — I (S) $2520.00
  • — Z (S) $4200.00

1926.950 E01 II

Serious Gravity 10 1 instance 8 exposed
Issued
Jun 13, 2003
Abate by
Jun 27, 2003
Penalty
Initial $4,200 · Current $2,520 Reduced
Recent events (2)
  • — I (S) $2520.00
  • — Z (S) $4200.00

1926.951 D01

Serious Gravity 10 6 instances 6 exposed
Issued
Jun 13, 2003
Abate by
Jun 19, 2003
Penalty
Initial $4,200 · Current $2,520 Reduced
Recent events (2)
  • — I (S) $2520.00
  • — Z (S) $4200.00

1926.951 D02

Serious Gravity 10 4 instances 6 exposed
Issued
Jun 13, 2003
Abate by
Jun 19, 2003
Penalty
Initial $4,200 · Current $2,520 Reduced
Recent events (2)
  • — I (S) $2520.00
  • — Z (S) $4200.00

1926.952 B02

Serious Gravity 10 2 instances 8 exposed
Issued
Jun 13, 2003
Abate by
Jun 19, 2003
Penalty
Initial $3,000 · Current $1,800 Reduced
Recent events (2)
  • — I (S) $1800.00
  • — Z (S) $3000.00

1926.955 A06 I

Serious Gravity 10 1 instance 1 exposed
Issued
Jun 13, 2003
Abate by
Jun 19, 2003
Penalty
Initial $4,200 · Current $2,520 Reduced
Recent events (2)
  • — I (S) $2520.00
  • — Z (S) $4200.00

View Marlin Contracting CO., INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 304316938.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.